RFI__3_-_117300_REV.pdf

PDF 14 KB Posted

Attached to
VAMC PERRY POINT, MD CLC
Solicitation number
VA101-16-R-0086
Issued by

About this file

RFI 3 11 73 00 rev

View the file

Other files

File Type Posted
VA101-16-R-0086_A00008.pdf PDF
P07_-_WAGE_DETERMINATION_11-18-16.pdf PDF
RFI__58_-_085653.pdf PDF
RFI__79_-_144_-_AS119_-_HOUSE_F_-_REFLECTED_CEILING_PLAN.pdf PDF
VA101-16-R-0086_A00007.pdf PDF
RFI__50_-084413.pdf PDF
RFI__75_-AS606_-_TYPICAL_UPPER_LEVEL_HOUSE_STOREFRONT__ELEVATIONS.pdf PDF
RFI__70_-_AS201_-_LOWER_LEVEL_HOUSE_-_ELEVATIONS.pdf PDF
VA101-16-R-0086_A00006.pdf PDF
RFI_32_and_71_-Pg_5_of_96.docx DOCX document
RFI__19_-_AQ104_-_FIRST_FLOOR_COMMUNITY_CENTER_FURNITURE_ _EQUIPMENT_PLAN.pdf PDF
RFI__26_-_096723-20_REV.pdf PDF
RFI__19_-_AQ105_-_SECOND_FLOOR_COMMUNITY_CENTER_FURNITURE_ _EQUIPMENT_PLAN.pdf PDF
RFI___19_-AQ101_-_LOWER_LEVEL_HOUSE_FURNITURE_ _EQUIPMENT_PLAN.pdf PDF
VA101-16-R-0086_A00005-signed.pdf PDF
RFI__19_-_AQ103_-_HOUSE_F_-_FURNITUR_ _EQUIPMENT_PLAN.pdf PDF
RFI___19_-_I109_-_LOWER_LEVEL_WAYFINDING_____PLAN_-_B.pdf PDF
RFI__19_-_I108_-_LOWER_LEVEL_WAYFINDING_____PLAN_-_A.pdf PDF
RFI__24_-_Remote_Fill_Station_EarthSafe.pdf PDF
285 - S304.pdf PDF
RFI__10_Perry_Point_CLC_Soil_Borings_Plan-SB-01.pdf PDF
275 - SF110.pdf PDF
302 - S503.pdf PDF
260 - SB102.pdf PDF
305 - S703.pdf PDF
301 - S502.pdf PDF
267 - SF102.pdf PDF
RFI__10_Perry_Point_VA_Community_Living_Center-_Geotech._Report_(Rev._2-9-15).pdf PDF
268 - SF103.pdf PDF
274 - SF109.pdf PDF
261 - SB103.pdf PDF
293 - S312.pdf PDF
286 - S305.pdf PDF
VA101-16-R-0086_A00004.pdf PDF
294 - S313.pdf PDF
304 - S702.pdf PDF
VA101-16-R-0086_A00003.pdf PDF
RFI__6_-_416_-_FX110_-_MALL_-_LOWER_LEVEL_PLAN_-_AREA_A_-_FIRE_SPRINKLER.pdf PDF
RFI__8_-ATTACHMENT_A.docx DOCX document
VA101-16-R-0086_A00002-signed.pdf PDF
RFI___9_ATTACHMENT_B.docx DOCX document
VA101-16-R-0086_A00001.pdf PDF
Attendees.pdf PDF
Pre-bid_Presentation_Part_1.pdf PDF
Pre-bid_Presentation_Part_2.pdf PDF
J A_VA101-16-R-0086_redacted.pdf PDF
VOLUME_1A.zip ZIP file
VOLUME_1K.zip ZIP file
VOLUME_1J.zip ZIP file
VOLUME_1I.zip ZIP file
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-16

512-173 11 73 00 - 1

SECTION 11 73 00

CEILING MOUNTED PATIENT LIFT SYSTEM

PART 1 - GENERAL

1.1 DESCRIPTION

Ceiling Mounted Patient Lift Systems for the transfer of physically challenged patients are specified in this section. 600 lb.(A5185A)and

1,000 lb. (K5185B). Ceiling Mounted Patient Lifts System is VA Furnished and Contractor Installed (VC). Contractor shall coordinate installation with the lift Ceiling Mounted Lift Manufacturer selected by the VA.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment.

B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General

Electrical Requirements and items, which are common to sections of

Division 26.

1.3 QUALITY ASSURANCE

Certification for compliance is required for Ceiling Mounted Patient

Lift Systems. Certifications shall be provided by an independent third party who will conduct testing to ensure that the ceiling lift and charging system are safe and in compliance with ISO 10535 & UL 60601-1

1.4 SUBMITTALS

A. Submit in accordance with specification Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.

B. Certificates of Compliance

C. Manufacturer's Literature and Data:

1. Lifting Capacity

2. Lifting Speed

3. Horizontal Displacement Speeds

4. Horizontal Axis Motor

5. Vertical Axis Motor

6. Emergency Brake

7. Emergency Lowering Device

8. Emergency Stopping Device

9. Electronic Soft-Start and Soft-Stop Motor Control

10. Current Limiter for Circuit Protection

11. Low Battery Disconnect System

12. Strap Length

13. All equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity, standard connections, manufacturer's recommendations and behavior problems (e.g., 11 73 00 - 2 vibration, thermal expansion,) associated with equipment or piping so that the proposed installation can be properly reviewed.

D. Individual Room layouts showing location of lift system installation shall be approved before proceeding with installation of lifts.

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are listed in the text by the basic designation only.

B. International Organization for Standardization (IOS):

10535-06................Hoist for the Transfer of Disabled Persons-

Requirements and Test Methods

C. Underwriters Laboratories (UL):

60601-1(2003)...........Medical Electrical Equipment: General

Requirements for Safety

94-2013.................UL Standards for Safety Test for Flammability of

Plastic Materials for Parts in Devices and

Appliances-Fifth Edition

D. International Electromagnetic Commission (IEC):

801-2(1991).............Electromagnetic Compatibility for Industrial-

Process Measurement and Control Equipment-Part

2: Electromagnetic Discharge Requirements

PART 2 - PRODUCTS

2.1 CEILING TRACK SYSTEM

The Ceiling Track shall be made from high strength extruded aluminum

T66081-T5 at a thickness of 3/16” (4.8mm). Provide anchor supports at a minimum 3 per linear foot at ceiling substrate. The ceiling track shall be finished with baked enamel paint.

2.2 LIFT UNIT

A. The Lift Unit shall be constructed of a steel frame system (2205lbs /

1000kg tested) driven by a gear reduced high torque motor

B. The Lift system shall have the following features.

1. Lifting capacity: 1000 lbs (455 kg)(K5185B) and 600 lbs.(A5185A)

2. Electronic soft-start and soft-stop motor control

3. Emergency lowering device

4. Emergency stopping device

5. Current limiter for circuit protection in case of overload.

6. Safety device that stops the motor to lift when batteries are low.

7. Lifting speed: 2.3in/s (6 cm/s), 1.6in/s (3.5cm) in full capacity

8. Horizontal displacement speed: 5.9in/s (150mm/s)

11 73 00 - 3

9. Horizontal axis motor: 24VDC at 62 watts and vertical axis motor at

110 watts

10. Emergency brake (in case of mechanical failure)

11. Strap length up to 90in (2.3m) tested for 2998lbs (1360kg)

12. Cab: VO plastic–fire retardant, UL 94

13. Wireless remote control (optional)

2.3 MOTORS

A. Vertical Movement-DC Motor

1. Type: Class A, fully enclosed, permanent magnet.

2. Rating: 24Vdc, 1.1A, 110W, 4000RPM, 0.3N-m.

3. Mounting: Secured to chassis.

B. Horizontal Movement-DC Motor

1. Type: Fully enclosed, permanent magnet, integral reducer.

2. Rating: 24Vdc, 1.8A, 62W, 260RPM, 1.0N-m.

3. Mounting: Secured to chassis.

2.4 BATTERIES

A. The life cycle (number of charging cycles) for batteries shall be in compliance with IEC 801-2.

B. Provide rechargeable batteries with up to 120 transfers with a load of

200lbs (74kg) and up to 70 transfers with its maximum load of 440lbs

(200kg).

2.5 CHARGER

A. Charger Input: 100-240 Vac, 50/60 Hz.

B. Charger Output: 27 Vdc, 1 A max.

C. Supplemental to the charger provide a clip on charging station with indicator lights.

2.6 STRAPS AND SLING

A. The straps shall be made of threaded nylon. The straps shall ensure the patient’s safety by preventing the patient from falling out of the sling.

B. The sling shall be made from a polyester/nylon net material that is pliable, breathable and easy to use. The sling shall cradle the body of the patient.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install ceiling mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings.

11 73 00 - 4

B. If the distance in between the suspended ceiling and anchors is more than 18” consult with manufacturer to determine if lateral braces will be required.

3.2 INSTRUCTION AND PERSONNEL TRAINING

Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system equipment.

3.3 TEST

Conduct performance test, in the presence of the Resident Engineer and a manufacturer's field representative, to show that the patient lift system equipment and control devices operate properly and in accordance with design and specification requirements.

- - - E N D - - -