261 - SB103.pdf
PDF 226 KB Posted
- Attached to
- VAMC PERRY POINT, MD CLC
- Solicitation number
- VA101-16-R-0086
About this file
RFI 11
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
A
D
D
12 12
4 4
G
3 3
7 7
8 8
10 10
9 9
11 11
C
C
FB EC.5
0.8
F.1
2' - 0"
1' - 4"
' - 4
' - 2
8' -
' - 0
2' - 4"
' - 7
1/ 2"
' - 5
' - 9 1/
2"
' - 1
2' -
7 9
/16
' - 0
' - 1 1 7
/16
1' - 8" 21' - 9" 8' - 10" 9' - 0" 6' - 11" 12' - 0" 2' - 6" 10"
11' - 4" 17' - 2"
F50 F50
F60 F50
F40
F50
F40F50F60
F60
F40 F40
F40
F70T
F80T
F40
F50F50F60F50
F60 F60 F40
F240/70F60
F50 F80T
2.5
2'x1' WALL FOOTING w/ 3#5 CONT, TYP
MN
2.6
3.9
H
2"
2"
CONTROL
JOINT, TYP
ISOLATION JOINT,
TYP
S305
S305
TYP @ PIER
TYP
46' - 10" 15' - 4" 14' - 0" 2' - 0"
1' - 8"
' - 6
8' -
' - 4
' - 7 1/
2"
' - 5
' - 9
1/ 2"
' - 1
2' -
7 9
/16
' - 0
' - 1 1 7
/16
' - 8
' - 0
1' - 4"
1' - 4"
1' - 4" 1' - 4"
8"
1' - 4"
' - 4
' - 0
' - 4
' - 8
2' - 4"
' - 2
' - 0 5/
8"
2' - 0"
14' - 6" 12' - 2"
1' - 4"
1' - 4"
2' - 0"
1' - 0"
1' - 4"
1' - 4"
1' - 4"
1' - 4"
1' - 4"
1' - 4"
16" CMU
16" CMU
1' - 0" 2' -
0"
6' - 10"
11.1 11.1
11.4 11.4
CRACK CONTROL
BARS, TYP
CRACK CONTROL
BARS, TYP
12" CMU,
TYP UNO
12" CMU,
TYP UNO
D.8
30' - 7" 15' - 11" 9' - 5 5/8"
MATCHLINE
SEE SF107
56' - 11 3/4"
4' - 0 1/2"
(-2' - 8")
(-2' - 6")(-2' - 6")(-2' - 6")
(-2' - 6")
(-2' - 6")
(-2' - 8")
(-2' - 6")
(-2' - 8")
(-2' - 8")
(-2' - 8")
(-2' - 8")
C/L A
MA
TC
HL
INE
SE
E S
B1
T
(-2' - 8")
(-2' - 8")
(-2' - 0")
(-2' - 0")
SB103
SB103
2 Sim
SIM
SIM
S310
S310
NOTES:
1. TOP OF FINISHED FLOOR ELEVATION EQUALS 26'-1¼". TOP OF SLAB EQUALS FINISHED
FLOOR UNLESS NOTED THUS: T/SLB = (±0'-0”).
2. ALL ELEVATIONS SHOWN ON PLAN ARE REFERENCED FROM FINISHED FLOOR ELEVATION.
(SEE 1/AS406 & 1/AS407 FOR SLOPES.)
3. THE SLAB-ON-GRADE SHALL BE 5” THICK CONCRETE REINFORCED WITH 6x6-W2.9xW2.9 WWR
PLACED ON A 4" LAYER OF SAND OVER A VAPOR BARRIER AND 4” DRAINAGE FILL.
4. FOR SIZE AND LOCATIONS OF SLAB OPENINGS, CURBS, DEPRESSIOINS, SLOPES, FLOOR
DRAINS, ETC. NOT SHOWN ON THIS DRAWING, SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL
& PLUMBING DRAWINGS.
5. SHOWN THUS ON PLAN:
A. (-0'-0") INDICATES TOP OF FOOTING ELEVATION.
B. <-0'-0"> INDICATES TOP OF CONCRETE WALL / GRADE BEAM ELEVATION.
C. [-0'-0"]INDICATES TOP OF PIER ELEVATION.
6. TOP OF EXTERIOR FOOTINGS SHALL BE (-2'-0"), UNO.
TOP OF INTERIOR FOOTINGS SHALL BE (-8"), UNO.
TOP OF PIERS SHALL BE [-8"], UNO.
7. FOR PIER SCHEDULE SEE SHEET S703.
2.6
H
1' - 0" 1' - 7 5/8"
2' - 0"
1' -
5/8
2' - 7 5/8"
9 13/16" 9 13/16"
9 1 3/1
6" 9 1
3/1 6"
3' -
5/8
#5 DOWELS
w/STD HOOK, EA CELL
402.298.8260 - FAX 402.298.8290
PLATTSMOUTH, NEBRASKA 68048
12917 - 30TH AVENUE
COST ESTIMATING
410.323.0600 - FAX 410.377.2543
BALTIMORE, MARYLAND 21209
1416 CLARKVIEW ROAD, SUITE 500
MECHANICAL / ELECTRICAL CONSULTING ENGINEERING
CIVIL & STRUCTURAL ENGINEERING
10710 GILROY ROAD
HUNT VALLEY, MARYLAND 21031
443.589.2400 - FAX 443.589.2401
FIRE PROTECTION ENGINEERING
8815 CENTRE PARK DR., SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
AUTOMATIC TRANSPORT ENGINEERING
182 THOMOS JOHNSON DR. SUITE 200
FREDERICK, MARYLAND 21702
301.662.8112 - FAX 301.662.8117
PLANTREE CONSULTANT
8055 CHORDON RD.
KIRTLAND, OHIO 44094
440.256.1880 - FAX 440.256.1881
CULTURAL RESOURSES CONSULTANT
535 NORTH CHURCH ST.
WEST CHESTER, PENNSYLVANIA 19380
610.436.9000 - FAX 610.436.8468
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS
VA FORM 08-6231
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
LIVING CENTER
PERRY POINT VA MEDICAL CENTER
ARCHITECT/ENGINEERS: REPLACEMENT COMMUNITY 512-173
08/26/16
Office of Construction and Facilities Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING COST CONSULTANTS
& ASSOCIATES, INC.
BURDETTE KOEHLER MURPHY
CENTURY ENGINEERING, INC.
KOFFEL ASSOCIATES, INC. ROBERT L. SEYMOUR ASSOCIATES I.D.E.A.S., INC.
JOHN MILNER ASSOCIATES, INC.
Department of Veterans Affairs
Bel Air, Maryland 21015-1436 fax 410.836.6611 2215 Conowingo Rd, Suite 101 410.803.2141
POLT DESIGN GROUP
www.polt-design.com
ENGINEERING
PLANNING
ARCHITECTURE
WP/ DW/ DK
HOUSE F FOUNDATION PLAN
SB103
1/8" = 1'-0"
FOUNDATION PLAN - BLDG F
C
KM
I
G
B E
H
KEY PLAN
A D
F
J L
N
FOOTING SCHEDULE (3KSF)
MARK LENGTH WIDTH
THICKNES
S
REINFORCEMENT
(BOT UNO) REMARKS
F30 3' - 0" 3' - 0" 12" 4#5 EW
F40 4' - 0" 4' - 0" 12" 6#5 EW
F50 5' - 0" 5' - 0" 12" 7#4 EW
F60 6' - 0" 6' - 0" 14" 7#5 EW
F70 7' - 0" 7' - 0" 17" 6#6 EW
F70T 7' - 0" 7' - 0" 17" 6#6 EW-B & 6#4 EW-T
F80T 8' - 0" 8' - 0" 19" 6#7 EW-B & 6#4 EW-T
F240/70 24' - 0" 7' - 0" 18" 11#6 LW-B, 6#5 LW-T +
29#6 SW-B, 29#4 SW-T
3/4" = 1'-0"2 ENLARGED DETAIL - OVERHANG PIER
| Sheets |
| S305 - HOUSE F SECTIONS |
| S503 - HOUSE F LATERAL FRAMES |
| S703 - HOUSE F COLUMN SCHEDULE |
| SB103 - HOUSE F FOUNDATION PLAN |
| SF103 - HOUSE F ATTIC / GREEN ROOF FRAMING PLAN |
| SF110 - HOUSE F MAIN ROOF FRAMING PLAN |
File details come from the government source that posted it. Updated .