RFI__26_-_096723-20_REV.pdf

PDF 32 KB Posted

Attached to
VAMC PERRY POINT, MD CLC
Solicitation number
VA101-16-R-0086
Issued by

About this file

Spec 096723

View the file

Other files

File Type Posted
VA101-16-R-0086_A00008.pdf PDF
P07_-_WAGE_DETERMINATION_11-18-16.pdf PDF
RFI__58_-_085653.pdf PDF
RFI__79_-_144_-_AS119_-_HOUSE_F_-_REFLECTED_CEILING_PLAN.pdf PDF
VA101-16-R-0086_A00007.pdf PDF
RFI__50_-084413.pdf PDF
RFI__75_-AS606_-_TYPICAL_UPPER_LEVEL_HOUSE_STOREFRONT__ELEVATIONS.pdf PDF
RFI__70_-_AS201_-_LOWER_LEVEL_HOUSE_-_ELEVATIONS.pdf PDF
VA101-16-R-0086_A00006.pdf PDF
RFI_32_and_71_-Pg_5_of_96.docx DOCX document
RFI__19_-_AQ104_-_FIRST_FLOOR_COMMUNITY_CENTER_FURNITURE_ _EQUIPMENT_PLAN.pdf PDF
RFI__19_-_AQ105_-_SECOND_FLOOR_COMMUNITY_CENTER_FURNITURE_ _EQUIPMENT_PLAN.pdf PDF
RFI___19_-AQ101_-_LOWER_LEVEL_HOUSE_FURNITURE_ _EQUIPMENT_PLAN.pdf PDF
VA101-16-R-0086_A00005-signed.pdf PDF
RFI__19_-_AQ103_-_HOUSE_F_-_FURNITUR_ _EQUIPMENT_PLAN.pdf PDF
RFI___19_-_I109_-_LOWER_LEVEL_WAYFINDING_____PLAN_-_B.pdf PDF
RFI__19_-_I108_-_LOWER_LEVEL_WAYFINDING_____PLAN_-_A.pdf PDF
RFI__24_-_Remote_Fill_Station_EarthSafe.pdf PDF
285 - S304.pdf PDF
RFI__10_Perry_Point_CLC_Soil_Borings_Plan-SB-01.pdf PDF
275 - SF110.pdf PDF
302 - S503.pdf PDF
260 - SB102.pdf PDF
305 - S703.pdf PDF
301 - S502.pdf PDF
267 - SF102.pdf PDF
RFI__10_Perry_Point_VA_Community_Living_Center-_Geotech._Report_(Rev._2-9-15).pdf PDF
268 - SF103.pdf PDF
274 - SF109.pdf PDF
261 - SB103.pdf PDF
293 - S312.pdf PDF
286 - S305.pdf PDF
VA101-16-R-0086_A00004.pdf PDF
294 - S313.pdf PDF
304 - S702.pdf PDF
VA101-16-R-0086_A00003.pdf PDF
RFI__6_-_416_-_FX110_-_MALL_-_LOWER_LEVEL_PLAN_-_AREA_A_-_FIRE_SPRINKLER.pdf PDF
RFI__8_-ATTACHMENT_A.docx DOCX document
VA101-16-R-0086_A00002-signed.pdf PDF
RFI___9_ATTACHMENT_B.docx DOCX document
RFI__3_-_117300_REV.pdf PDF
VA101-16-R-0086_A00001.pdf PDF
Attendees.pdf PDF
Pre-bid_Presentation_Part_1.pdf PDF
Pre-bid_Presentation_Part_2.pdf PDF
J A_VA101-16-R-0086_redacted.pdf PDF
VOLUME_1A.zip ZIP file
VOLUME_1K.zip ZIP file
VOLUME_1J.zip ZIP file
VOLUME_1I.zip ZIP file
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-16

512-173 09 67 23.20 - 1

SECTION 09 67 23.20

RESINOUS (EPOXY BASE) WITH QUARTZ CHIP BROADCAST

PART 1 - GENERAL

1.1 DESCRIPTION

This section specifies Resinous (Resinous epoxy base with quartz chip broadcast) flooring with integral cove base.

1.2 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Manufacturer's Literature and Data:

1. Description of each product to be provided.

2. Application and installation instructions.

3. Maintenance Instructions: Submit manufacturer’s written instructions for recommended maintenance practices.

C. Qualification Data: For Installer.

D. Sustainable Submittal:

1. Product data for products having recycled content, submit documentation indicating percentages by weight of post-consumer and pre-consumer recycled content.

a. Include statements indicating costs for each product having recycled content.

2. Product data for field applied, interior, paints, coatings, and primers, include printed statement of VOC content indicating compliance with environmental requirements.

E. Samples:

1. Each color and texture specified on the drawings

2. Samples for verification: For each (color and texture) resinous flooring system required, 6 inches (152 mm) square, applied to a rigid backing by installer for this project.

3. Sample showing construction from substrate to finish surface in thickness specified and color and texture of finished surfaces.

Finished flooring must match the approved samples in color and texture.

F. Shop Drawings: Include plans, sections, component details, and attachment to other trades. Indicate layout of the following:

1. Patterns.

2. Edge configurations.

G. Certifications and Approvals:

09 67 23.20 - 2

1. Manufacturer's certification of material and substrate compliance with specification.

2. Manufacturer's approval of installers.

3. Contractor's certificate of compliance with Quality Assurance requirements.

H. Warranty: As specified in this section.

1.3 QUALITY ASSURANCE

A. Manufacture Certificate: Manufacture shall certify that a particular resinous flooring system has been manufactured and in use for a minimum of five (5) years.

B. Installer Qualifications: Engage an experienced installer (applicator) who is experienced in applying resinous flooring systems similar in material, design, and extent to those indicated for this project for a minimum period of five (5) years, whose work has resulted in applications with a record of successful in-service performance, and who is acceptable to resinous flooring manufacturer.

1. Engage an installer who is certified in writing by resinous flooring manufacturer as qualified to apply resinous flooring systems indicated.

2. Contractor shall have completed at least ten (10) projects of similar size and complexity. Include list of at least five (5) projects. List must include owner (purchaser); address of installation, contact information at installation project site; and date of installation.

3. Installer's Personnel: Employ persons trained for application of specified product.

C. Source Limitations:

1. Obtain primary resinous flooring materials including primers, resins, hardening agents, grouting coats and finish or sealing coats from a single manufacturer.

2. Provide secondary materials, including patching and fill material, joint sealant, and repair material of type and from source recommended by manufacturer of primary materials.

D. Pre-Installation Conference:

1. Convene a meeting not less than thirty days prior to starting work.

2. Attendance:

a. Contractor

b. VA COR

09 67 23.20 - 3

c. Manufacturer and Installer's Representative

3. Review the following:

a. Environmental requirements

1) Air and surface temperature

2) Relative humidity

3) Ventilation

4) Dust and contaminates

b. Protection of surfaces not scheduled to be coated

c. Inspect and discus condition of substrate and other preparatory work performed

d. Review and verify availability of material; installer’s personnel, equipment needed

e. Design and pattern/s and edge conditions.

f. Performance of the coating with chemicals anticipated in the area receiving the resinous (urethane and epoxy mortar/cement) flooring system

g. Application and repair

h. Field quality control

i. Cleaning

j. Protection of coating systems

k. One-year inspection and maintenance

l. Coordination with other work

E. Manufacturer’s Field Services: Manufacturer’s representative shall provide technical assistance and guidance for surface preparation and application of resinous flooring systems.

F. Contractor Job Site Log: Contractor shall document daily; the work accomplished environmental conditions and any other condition event significant to the long term performance of the urethane and epoxy mortar/cement flooring materials installation. The Contractor shall maintain these records for one year after Substantial Completion.

1.4 MATERIAL PACKAGING DELIVERY AND STORAGE

A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.

B. Protect materials from damage and contamination in storage or delivery, including moisture, heat, cold, direct sunlight, etc.

C. Maintain temperature of storage area between 60 and 80 degrees F (15 and

26 degrees C).

09 67 23.20 - 4

D. Keep containers sealed until ready for use.

E. Do not use materials beyond manufacturer’s shelf life limits.

F. Package materials in factory pre-weighed and in single, easy to manage batches sized for ease of handling and mixing proportions from entire package or packages. No On site weighing or volumetric measurements are allowed.

1.5 PROJECT CONDITIONS

A. Environmental Limitations: Comply with resinous flooring manufacturer's written instructions for substrate temperature, ambient temperature, moisture, ventilation, and other conditions affecting resinous flooring application.

1. Maintain material and substrate temperature between 65 and 85 degrees F (18 and 30 degrees C) during resinous flooring application and for not less than 24 hours after application.

2. Concrete substrate shall be properly cured per referenced section 03

30 00, CAST-IN-PLACE CONCRETE. Standard cure time a minimum of 30 days. A vapor barrier must be present for concrete subfloors on or below grade.

a. Resinous flooring applications where moisture testing resulting in readings exceeding limits as defined in this specification under part 3, section 3.4, paragraph B, shall employ an multiple component 15 mil thick system designed to suppress excess moisture in concrete.

b. Application at a minimum thickness of 15 mils, over properly prepared concrete substrate as defined in section 3.4.

c. Moisture suppression system must meet the design standards as follows:

Property Test Value

Tensile Strength

ASTM D638 4,400 psi

Volatile Organic Compound Limits (V.O.C.)

EPA & LEED 25 grams per liter

Permeance ASTM E96 @ 16mils/ 0.4mm on concrete

0.1 perms

Tensile Modulus ASTM D638 1.9X105 psi

Percent Elongation ASTM D638 12%

Cure Rate Per manufactures Data

4 hours Tack free with 24hr recoat window

09 67 23.20 - 5

B. Lighting: Provide permanent lighting or, if permanent lighting is not in place, simulate permanent lighting conditions during resinous flooring application.

C. Close spaces to traffic during resinous flooring application and for not less than 24 hours after application, unless manufacturer recommends a longer period.

1.6 WARRANTY

A. Work subject to the terms of the Article “Warranty of Construction” FAR clause 52.246-21.

B. Warranty: Manufacture shall furnish a single, written warranty covering the full assembly (including substrata) for both material and workmanship for a extended period of three (3) full years from date of installation, or provide a joint and several warranty signed on a single document by manufacturer and applicator jointly and severally warranting the materials and workmanship for a period of three (3) full years from date of installation. A sample warranty letter must be included with bid package or bid may be disqualified.

1.7 APPLICABLE PUBLICATIONS

A. The publication listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. ASTM Standard C722-04 (2012), "Standard Specification for Chemical-

Resistant Monolithic Floor Surfacings," ASTM International, West

Conshohocken, PA, 2006, DOI: 10.1520/C0722-04R12, www.astm.org.

1. Specification covers the requirements for aggregate-filled, resin-based, monolithic surfacings for use over concrete.

C. American Society for Testing and Materials (ASTM):

C413 (2012).............Absorption of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer

Concretes

C531 (2012).............Linear Shrinkage and Coefficient of Thermal

Expansion of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer

Concretes

Bond Strength ASTM D7234 100% bond to concrete failure

09 67 23.20 - 6

D638 (2010).............Tensile Properties of Plastics

D790 (2010).............Flexural Properties of Unreinforced and

Reinforced Plastics and Electrical Insulating

Materials

D1308 (2013)............Effect of Household Chemicals on Clear and

Pigmented Organic Finishes

D2240 (2010)............Rubber Property—Durometer Hardness

D4060(2010).............Abrasion Resistance of Organic Coatings by the

Taber Abraser

D4226 (2011)............Impact Resistance of Rigid (Poly-Vinyl

Chloride) (PVC) Building Products

D4259 (2012)............Abrading Concrete to alter the surface profile of the concrete and to remove foreign materials and weak surface laitance

C7234 (2012)............Pull-Off Adhesion Strength of Coatings on

Concrete Using Portable Pull-Off Adhesion

Testers

E96/E96M (2013).........Water Vapor Transmission of Materials

F1679...................Variable Incidence Tribometer for determining the slip resistance

F1869 (2011)............Measuring Moisture Vapor Emission Rate of

Concrete Subfloor Using Anhydrous Calcium

Chloride

F2170 (2011)............Determining Relative Humidity in Concrete Floor

Slabs Using in situ Probes

PART 2 - PRODUCTS

2.1 SYSTEM DESCRIPTION FOR RES-2 (BROADCAST QUARTZ CHIP FLAKE)

A. System Descriptions:

1. Monolithic, multi-component epoxy chemistry resinous flooring system. Primer with broadcast quartz aggregates, High performance multi-component solvent free epoxy undercoat, quartz chip flake broadcast media. High performance multi component epoxy and solvent free sealers.

B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up.

C. System Components: Verify specific requirements as systems vary by manufacturer. Verify build up layers of broadcast and installation

09 67 23.20 - 7 method. Verify compatibility with substrate. Use manufacturer’s standard components, compatible with each other and as follows:

1. Primer with Broadcast quartz (primer coat):

a. Resin: epoxy.

b. Formulation Description: Multiple component high solids.

c. Application Method: squeegee, back roll and broadcast.

d. Thickness of coat(s): 2-3mil.

e. Number of Coats: One.

f. Aggregates: Quartz broadcast into wet epoxy primer.

2. Undercoat: (body coat)

a. Resin: Epoxy.

b. Formulation Description: Pigmented multi-component, high solids.

c. Application Method: Notched squeegee and Back roll

d. Number of Coats: One.

e. Aggregates: quartz chip flake broadcast into wet Undercoat.

f. Thickness of coat(s): 20-30mil.

g. Number of Coats: One.

3. Sealer coat:

a. Resin: Epoxy.

b. Formulation Description: Multiple component high solids, no solvent UV stable.

c. Type/Finsh: Clear Gloss.

d. Thickness of coat(s): 2-3mil.

e. Number of Coats: (2) two.

f. Application: Squeegee and finish roll.

D. System Characteristics:

1. Color and Pattern: As selected by COR from manufacturer's standard colors.

2. Integral cove base: 1 inch (25.4 mm) radius epoxy mortar cove keyed into concrete substrate and or resinous flooring mortar system. No fillers integral cove base must be troweled in place with specified resinous mortar base.

3. Overall System Thickness: Per manufacturers recommendation.

4. Finish: anti-slip resistant.

5. Temperature Range: Systems vary by manufacturer; approximate range from a minimum of 45 to 150 degrees F.

E. Physical Properties:

09 67 23.20 - 8

1. Physical Properties of flooring system when tested as follows:

F. Chemical Resistance in accordance ASTM D1308 - 02(2007) “Standard Test

Method for Effect of Household Chemicals on Clear and Pigmented Organic

Finishes”. ASTM International, West Conshohocken, PA, 2006, DOI:

10.1520/D1308-02R07, www.astm.org. No effect to the following exposures:

1. Acetic acid (5%)

2. Ammonium hydroxide (10%)

3. Citric Acid (50%)

4. Fatty Acid

5. Motor Oil, 20W

6. Hydrochloric acid (20%)

7. Sodium Chloride

8. Sodium Hypochlorite (10%)

9. Sodium Hydroxide (30%)

10. Sulfuric acid (25%)

11. Urine, Feces

12. Hydrogen peroxide (10%)

Property Test Value

Tensile Strength

ASTM D638 5,200 psi

Volatile Organic Compound Limits (V.O.C.)

EPA & LEED Below 100 g/l

Flexural Strength

ASTM D790 4,000 psi

Water Absorption ASTM C413 0.056%

Coefficient of friction dry/slip index wet

ASTM F1679 >.79 dry >.65 wet

Impact Resistance ASTM D4226 > 160 in. lbs

Abrasion Resistance ASTM D4060

CS-17

0.03 gm maximum weight loss

Thermal Coefficient of Linear Expansion

ASTM C531 17 x 10-6 in/in ºF

Hardness Shore D

ASTM D2240 85 to 90

Bond Strength ASTM D7234 100% bond to concrete failure

09 67 23.20 - 9

2.2 SUPPLEMENTAL MATERIALS

A. Textured Top Coat: Type recommended or produced by manufacturer of seamless resinous flooring system, slip resistancetype and profile offor desired final finish.

B. Joint Sealant: Type recommended or produced by resinous flooring manufacturer for type of service or joint conditioned indicated.

C. Waterproof Membrane: Type recommended or produced by manufacturer of resinous floor coatings for type of service and conditions as specified.

D. Provide a chemical resistant epoxy novolac top coat capable of resisting sustained temperatures up to 120OC (250OF).

E. Crack Isolation Membrane: Type recommended or produced by manufacturer of resinous flooring for conditions as specified.

F. Anti-Microbial Additive: Incorporate anti-microbial chemical additive to prevent growth of most bacteria, algae, fungi, mold, mildew, yeast, etc..

G. Patching and Fill Material: Resinous product of or approved by resinous coating manufacturer for application indicated. Resinous based materials only. Cementitous or single component product are not expectable.

2.3 BASE CAP STRIP

A. Zinc cove strip.

B. Shape for 2mm depth of base material, "J" or “L” configuration.

C. Finish:

1. Finish exposed surfaces in accordance with NAAMM Metal Finishes

Manual.

PART 3 - EXECUTION

3.1 INSPECTION

A. Examine the areas and conditions where monolithic resinous system with integral base is to be installed with the VA COR.

B. Moisture Vapor Emission Testing: Perform moisture vapor transmission testing in accordance with ASTM F1869 to determine the MVER of the substrate prior to commencement of the work. See section 3.4, 3.

3.2 PROJECT CONDITIONS

A. Maintain temperature of rooms (air and surface) where work occurs, between 70 and 90 degrees F (21 and 32 degrees C) for at least 48 hours, 09 67 23.20 - 10 before, during, and 24 hours after installation. Maintain temperature at least 70 degrees F (21 degrees C) during cure period.

B. Maintain relative humidity less than 75 percent.

C. Do not install materials until building is permanently enclosed and wet construction is complete, dry, and cured.

D. Maintain proper ventilation of the area during application and curing time period.

1. Comply with infection control measures of the VA Medical Center.

3.3 INSTALLATION REQUIREMENTS

A. The manufacturer's instructions for application and installation shall be reviewed with the VA COR for the seamless resinous (urethane and epoxy mortar) flooring system with integral cove base.

B. Substrate shall be approved by manufacture technical representative.

3.4 PREPARATION

A. General: Prepare and clean substrates according to resinous flooring manufacturer's written instructions for substrate indicated. Provide clean, dry, and neutral Ph substrate for resinous flooring application.

B. Quarry Tile Substrates: Provide sound tile surfaces free of laitance, glaze, efflorescence, curing compounds, form-release agents, dust, dirt, grease, oil, and other contaminants incompatible with resinous flooring.

1. Prepare floor substrates as follows:

a. Shot-blast surfaces with an apparatus that abrades the concrete surface, contains the dispensed shot within the apparatus, and re circulates the shot by vacuum pickup.

b. Comply with ASTM D4259 requirements, unless manufacturer's written instructions are more stringent.

2. Repair damaged and deteriorated quarry tile according to resinous flooring manufacturer's written recommendations.

3. Verify that substrates are dry.

a. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with application only after substrates have maximum moisture-vapor-emission rate of [3 lb of water/1000 sq. ft. (1.36 kg of water/92.9 sq. m) in 24 hours. Per manufacturers recommendations.

b. MVT threshold for monolithic resinous flooring shall not exceed 3 lbs/1000 square feet (0.0001437 kPa) in a 24 hour period.

09 67 23.20 - 11

c. When MVT emission exceeds this limit, apply manufacturer’s recommended vapor control primer or other corrective measures as recommended by manufacturer prior to application of flooring or membrane systems.

d. Perform in situ probe test, ASTM F2170. Proceed with application only after substrates do not exceed a maximum potential equilibrium relative humidity of 85 percent.

e. Provide a written report showing test placement and results.

4. Verify that concrete substrates have neutral Ph and that resinous flooring will adhere to them. Perform tests recommended by manufacturer. Proceed with application only after substrates pass testing.

C. Resinous Materials: Mix components and prepare materials according to resinous flooring manufacturer's written instructions.

D. Use patching and fill material to fill holes and depressions in substrates according to manufacturer's written instructions.

E. Treat control joints and other nonmoving substrate cracks to prevent cracks from reflecting through resinous flooring according to manufacturer's written recommendations. Allowances should be included for flooring manufacturer recommended joint fill material, and concrete crack treatment.

F. Prepare wall to receive integral cove base:

1. Verify wall material is acceptable for resinous flooring application, if not, install material (e.g. cement board) to receive base.

2. Fill voids in wall surface to receive base, install undercoats (e.g.

water proofing membrane, and/or crack isolation membrane) as recommended by resinous flooring manufacturer.

3. Install base prior to flooring if required by resinous flooring manufacturer.

4. Grind, cut or sand protrusions to receive base application.

3.5 APPLICATION

A. General: Apply components of resinous flooring system according to manufacturer's written instructions to produce a uniform, monolithic wearing surface of thickness indicated.

1. Coordinate application of components to provide optimum adhesion of resinous flooring system to substrate, and optimum intercoat adhesion.

09 67 23.20 - 12

2. Cure resinous flooring components according to manufacturer's written instructions. Prevent contamination during application and curing processes.

3. At substrate expansion and isolation joints, provide joint in resinous flooring to comply with resinous flooring manufacturer's written recommendations.

a. Apply joint sealant to comply with manufacturer's written recommendations.

B. Apply Primer: over prepared substrate at manufacturer's recommended spreading rate for all areas to receive integrated cove base.

C. Apply cove base: Trowel to wall surfaces at a 1 inch radius, before applying flooring. Apply according to manufacturer's written instructions and details including those for taping, mixing, priming, and troweling, sanding, and top coating of cove base. Round internal and external corners.

D. Apply Primer: over prepared substrate at manufacturer's recommended spreading rate.

E. Trowel mortar base: Mix mortar material according to manufacturer's recommended procedures. Climatic and non-climatic resinous flooring systems may vary slightly on mode of application. Application should be based upon the following: Uniformly spread mortar over substrate using a specially designed screed box adjusted to manufacturer's recommended height. Metal trowel (hand or power) single mortar coat in thickness indicated for flooring system, grout to fill substrate voids. When cured, sand to remove trowel marks and roughness.

F. Broadcast: Immediately broadcast quartz silica aggregate into the primer using manufacturer's spray caster. Strict adherence to manufacturer's installation procedures and coverage rates is imperative.

G. Under Coat: Mix base material according to manufacturer's recommended procedures. Uniformly spread mixed material over previously primed substrate using manufacturer's installation tool. Roll material with strict adherence to manufacturer's installation procedures and coverage rates.

09 67 23.20 - 13

H. Broadcast: Immediately broadcast quartz flakes into the body coat.

Strict adherence to manufacturer's installation procedures and coverage rates is imperative.

I. First Sealer: Remove excess un-bonded flakes by lightly brushing and vacuuming the floor surface. Mix and apply sealer with strict adherence to manufacturer's installation procedures.

J. Second Sealer: Lightly sand first sealer coat. Mix and apply second sealer coat with strict adherence to manufacturer's installation procedures.

3.6 TOLERANCE

A. From line of plane: Maximum 1/8 inch (3.18 mm) in total distance of flooring and base. Broadcast resinous flooring system will contour substrate. Deviation and tolerance are subject to concrete tolerance.

B. From radius of cove: Maximum of 1/8 inch (3.18 mm) plus or 1/16-inch

(1.59 mm) minus.

3.7 ENGINEERING DETAILS

A. Chase edges to “lock” the flooring system into the concrete substrate along lines of termination.

B. Penetration Treatment: Lap and seal resinous system onto the perimeter of the penetrating item by bridging over compatible elastomer at the interface to compensate for possible movement.

C. Trenches: Continue flooring system into trenches to maintain monolithic protection. Treat cold joints to assure bridging of potential cracks.

D. Treat floor drains by chasing the flooring system to lock in place at point of termination.

E. Treat control joints to bridge potential cracks and to maintain monolithic protection. Treat cold joints and construction joints to bridge potential cracks and to maintain monolithic protection on horizontal and vertical surfaces as well as horizontal and vertical interfaces.

F. Discontinue Resinous floor system at vertical and horizontal contraction and expansion joints by installing backer rod and compatible sealant after coating installation is completed. Provide sealant type recommended by manufacturer for traffic conditions and chemical exposures to be encountered.

09 67 23.20 - 14

3.8 CURING, PROTECTION AND CLEANING

A. Cure resinous flooring materials in compliance with manufacturer's directions, taking care to prevent contamination during stages of application and prior to completion of curing process.

B. Close area of application for a minimum of 24 hours.

C. Protect resinous flooring materials from damage and wear during construction operation.

1. Cover flooring with kraft type paper.

2. Optional 6 mm (1/4 inch) thick hardboard, plywood, or particle board where area is in foot or vehicle traffic pattern, rolling or fixed scaffolding and overhead work occurs.

D. Remove temporary covering and clean resinous flooring just prior to final inspection. Use cleaning materials and procedures recommended by resinous flooring manufacturer.

- - - E N D - - -