This document is a Utility Status Report for the Landslide and Road Damage Evaluation and Repair Recommendations, Group A project in Puerto Rico. It provides details on the existing utilities at the project site located on PR-155 Km. 38.35. The report indicates that the Puerto Rico Aqueduct and Sewer Authority (PRASA) utilities at the site appear to have been relocated after being affected by Hurricanes Irma and Maria. The report also includes information on the estimated cost for the utility work, which is $8,000 per location.
The related federal contract opportunity is for the Landslide Repairs in Morovis, Puerto Rico project. This project consists of repairing landslides and washouts caused by Hurricanes Irma and Maria on PR-155 and PR-159. The work includes embankment reconstruction, wall construction, drainage system installation, paving, and other related tasks. The project is expected to cost between $10,000,000 and $15,000,000 and will be split into multiple work schedules/contract options. Sealed bids from certified Small Business Concerns only will be accepted for this opportunity. The bid documents are expected to be issued on or about July 23, 2024, and the bid due date and location will be specified in the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 101 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/products/acrobat/readstep2.html.
For more assistance with Adobe Reader visit http://www.adobe.com/support/products/ acrreader.html.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
C:\Documents and Settings\jedixon.FLHD\My Documents\My Pictures\Panoramic\lbtview4.jpg Utility Status Report
EFL-FM-UTL-01(07)
Page of Review Interval:
Existing utilities [ Project Scope [ Location and Utility Information Design Information Type and/or Size Facility (** See Legend) **P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks 8.2.1.3144.1.471865.466429 are not ] identified on the Plans may
| PrintForm: |
| CurrentPage: |
| PageCount: |
| Project: Landslide and Road Damage Evaluation and Repair Recommendations, Group A: |
| Date: 2023-10-10 |
| Reviewer: Emmanuel Gonzalez-Conill |
| PM: Carlos R. Perez Bras |
| HDM: |
| ReviewType_Otext: |
| Preliminary30: |
| PlanInHand70: |
| Internal90: |
| External95: |
| Final100: |
| Other: |
| RBYESUtilities: |
| RBNOUtilities: |
| RBUnknownUtilities: |
| RBUTILONPlans: |
| RBUtilNOTPlans: |
| CBUtilINSCR: 0 |
| CBUtilINSCR: 1 |
| CBUtilINSCR: 0 |
| CBNOUtilRelocate: 1 |
| CBUtilDescribed: 0 |
| scope1: 0 |
| scope2: 0 |
| scopeOther: 0 |
| txtOtherScope: |
| ADDROWButton: |
| DELETEButton: |
| RowNum: 1 |
| TFRoadName: PR-155 Km. 38.35 |
| TFStation: Km. 38.35 |
| LeftofCL: |
| RightofCL: |
| BothLandR: |
| TFTypeSize: W |
| TFSizePole: |
| TFCompany: PRASA |
| TFContactNameNum: |
| CBUtilityListing: 1 |
| CBAddContact: 0 |
| TFContact2NameNum: |
| CBPreConMeeting: |
| TFPCName: |
| TFPCPhone: |
| TFPCAddress: |
| TFPCEmail: |
| TFDesignResponce: FHWA |
| TFPaymentResponce: FHWA |
| TFResponceParty: FHWA |
| DLWorkCompleted: |
| NFEstCost: $ 8,000.00 Allowance for each one |
| DFAgreement: 2020-02-18 |
| CheckBox1: 0 |
| TFRemarks: PRASA utilities, at the site ER-HWY-259 appear to have been relocated after having been affected by hurricanes Irma and María, |
| TFGeneralInfo: |