This document is a Utility Status Report related to a federal contract opportunity for Landslide Repairs in Morovis, Puerto Rico. The report provides information on existing utilities that may impact or be impacted by the project, including their location, type, and size. The project scope involves repairing landslides and washouts on PR-155 and PR-159 in Morovis, Puerto Rico, through various construction activities such as embankment reconstruction, wall construction, drainage system installation, paving, and other miscellaneous work. The total project cost is expected to range from $10,000,000 to $15,000,000 and will be split into multiple work schedules/contract options. The solicitation, with bid documents expected to be issued on or about July 23, 2024, is set aside for certified Small Business Concerns only. The Department of Transportation Federal Highway Administration is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 101 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
C:\Documents and Settings\jedixon.FLHD\My Documents\My Pictures\Panoramic\lbtview4.jpg Utility Status Report
EFL-FM-UTL-01(07)
Page of Review Interval:
Existing utilities [ Project Scope [ Location and Utility Information Design Information Type and/or Size Facility (** See Legend) **P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks 8.2.1.3144.1.471865.466429 are are not ] identified on the Plans may will not ] affect utilities P T
TC
PD
G W S
SS
SFM
MH
TV
FO
UE
Other
FHWA
Utility Co.
Contractor Other (See Remarks)
FHWA
Utility Co.
Contractor Other (See Remarks)
FHWA
Utility Co.
Contractor Other (See Remarks) Before contract work begins During contract work End of contract work
| PrintForm: |
| CurrentPage: |
| PageCount: |
| Project: |
AC-905579 - ER-HWY-483 PR-155 Km. 35.0 Morovis, PR Date:
July 10, 2023 Reviewer:
J. Molina (Integra Design)
PM:
Jesse Agosto (CSA Group)
HDM:
ReviewType_Otext:
| Preliminary30: |
| PlanInHand70: |
| Internal90: |
| External95: |
| Final100: |
| Other: |
| RBYESUtilities: |
| RBNOUtilities: |
| RBUnknownUtilities: |
| RBUTILONPlans: |
| RBUtilNOTPlans: |
| CBUtilINSCR: |
CBUtilINSCR:
CBUtilINSCR:
CBNOUtilRelocate:
CBUtilDescribed:
scope1:
scope2:
scopeOther:
txtOtherScope:
| ADDROWButton: |
| DELETEButton: |
| RowNum: |
TFRoadName:
TFStation:
| LeftofCL: |
| RightofCL: |
| BothLandR: |
| TFTypeSize: |
TFSizePole:
TFCompany:
TFContactNameNum:
CBUtilityListing:
CBAddContact:
TFContact2NameNum:
CBPreConMeeting:
TFPCName:
TFPCPhone:
TFPCAddress:
TFPCEmail:
TFDesignResponce:
TFPaymentResponce:
TFResponceParty:
DLWorkCompleted:
NFEstCost:
DFAgreement:
CheckBox1:
TFRemarks:
TFGeneralInfo:
File details come from the government source that posted it. Updated .