Amendment 0001 Plans - AC-908579_HWY-257 - Full-Size.pdf
PDF 17 MB Posted
- Attached to
- Landslide Repairs in Morovis, Puerto Rico
- Solicitation number
- 693C73-24-B-000015
About this file
This document is an Amendment 0001 for the Landslide Repairs in Morovis, Puerto Rico project with Solicitation Number 693C73-24-B-000015. The project consists of repairing landslides and washouts caused by Hurricanes Irma and Maria on PR-155 and PR-159 in the municipality of Morovis, Puerto Rico. The work includes embankment reconstruction, shotcrete wall construction, soil nail wall construction, reinforced soil slope system construction, gabion wall construction, mechanically stabilized earth retaining wall construction, drainage system installation, milling and overlay, pavement reconstruction, pavement markings, removal and replacement of guardrails, signage, maintenance of traffic, and other miscellaneous work. The project is expected to cost between $10,000,000 to $15,000,000 and will be split into multiple work schedules/contract options. Sealed bids from certified Small Business Concerns only will be accepted. Bid documents should be issued on or about July 23, 2024, with the bid due date and location to be specified. Interested vendors must register on the SAM.gov website to receive email notifications and be added to the Interested Vendors List.
View the file
Other files
Show 40 more
Latest 50 of 101 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
COMMONWEALTH OF PUERTO RICO
DATE
DATE
DATE
DATE
DATE
DR. ANGEL J. ALICEA RODRIGUEZ
LISSETTE LUGO COLON
CARLOS A. LLOVERAS MATTEI
MARIA I. AYALA RIVERA
DATE
DR. ANGEL J. ALICEA RODRIGUEZ
DR. EDWIN E. GONZALEZ MONTALVO, PE
HIGHWAY P.R. 155
LANDSLIDE AND ROAD DAMAGE
EVALUATION AND REPAIR
RECOMMENDATIONS
KM. 36.15
MUNICIPALITY OF MOROVIS PUERTO RICO
A.C. CODE NO. (908579)
ORACLE NO. (RCN9080579)
SITE "J"
ER-HWY-257
PR-155 KM.36.15
X=204401.23,Y=249055.73
FINAL PLAN 100%
PR-155
STATE ROAD
SITE "J"
ER-HWY-257
PR-155 KM. 36.15
FLASHING ARROW PANEL
FLAGGER
(SEQUENTIAL CHEVRON)
TRAFFIC SIGN LOCATION
TRAFFIC FLOW
WORK AREA
LOCATION NUMBER
CODE NUMBER
LEGEND:
FLASHING ARROW PANEL
ARROW PANEL SUPPORT OR
TRAILER (SHOWN FACING DOWN)
FLASHING ARROW PANEL
(CAUTION MODE)
WORK VEHICLE
SHADOW VEHICLE
SHADOW VEHICLE WITH
TMA AND FLASHING ARROW
PORTABLE CHANGEABLE
MESSAGE SIGNS (PCMS)
LOCATION
PCMS - X
OVERHEAD STRUCTURE
CANTILEVER STRUCTURE
BUFFER
(Mts.)
12'=3.65 Mts.
MPH
Taper lenght (L)
RURAL
A B
100m.
150m.
100m.
150m.
ROAD 155
C
100m.
150m.
DISTANCE BETWEEN SIGNS
L = ( Mts. )
38 (USE 40M.)
and Buffer
Space for a typical lane of
3.65 mts.
<20
TAPER
ONE LANE TRAFFIC
CONCRETE BARRIERS
PLASTIC DRUMS
5.0M.
TYP.
55 GALS.
GENERAL NOTES:
1. NO WORK OTHER THAN MOBILIZATION, TRAFFIC CONTROL AND PROJECT OFFICE, SHALL BE PERFORMED
UNTIL THE PROGRESS SCHEDULE IS APPROVED BY THE ENGINEER.
2. ALL TEMPORARY CONTROL DEVICES SHALL COMPLY WITH THE SUPPLEMENTAL SPECIFICATION NUMBER
638-"MAINTENANCE AND PROTECTION OF TRAFFIC" OF THE STANDARD SPECIFICATION FOR ROAD AND BRIDGE
CONSTRUCTION, 2005 EDITION.
3. EQUIPMENT, MATERIALS AND OTHER DEVICES USED FOR CONSTRUCTION SHALL BE REMOVED FROM THE
ROADWAY AFTER WORK HOURS AND SHALL BE STAGED A MINIMUM OF 10 METERS FROM THE TRAVEL WAY.
4. THE DRUM SPACING SHALL BE 5 METERS.
5. ANY ALTERATION TO THE SCHEDULE THAT MAY IMPROVE TRAFFIC OPERATIONS WITHIN THE CONSTRUCTION
AREA, IN ACCORDANCE WITH THE CURRENT MUTCD AND WITH NO ADDITIONAL COST TO THE AUTHORITY, SHALL BE SUBMITTED TO THE ENGINEER AT LEAST TWENTY ONE(21) CALENDAR DAYS IN ADVANCE TO THE
PROPOSED DATE OF IMPLEMENTATION FOR REVIEW. IF THE PROPOSED ALTERATION IS APPROVED IT SHALL
BE IMPLEMENTED AS DIRECTED BY THE ENGINEER.
6. THE CONTRACTOR CAN PERFORM, WITH THE APPROVAL OF THE ENGINEER, SEVERAL SIMULTANEOUS
ACTIVITIES WITHIN A PHASE, AND AS PERMITTED BY THE CONTRACT PROPOSAL QUANTITIES ON THE TRAFFIC
CONTROL ITEMS.
7. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER THE INSTALLATION OF TEMPORARY TRAFFIC
CONTROL DEVICES FOR EACH PHASE AT LEAST FOURTEEN (14) CALENDAR DAYS IN ADVANCE FOR THE
RELEASE OF PUBLIC NOTICE. THE CONTRACTOR SHALL NOT COMMENCE ANY OF THE CONSTRUCTION PHASES
WITHOUT A PUBLIC NOTICE IS ISSUED OR WITHOUT DIRECT CONSENT FROM THE ENGINEER.
8. THE CONSTRUCTION SIGNS INSTALLATION SHOULD BE IN ACCORDANCE TO THE TEMPORARY TRAFFIC SIGNS
MOUNTING DETAILS, SHEET NO. MPT-23 OF THE PRHTA STANDARD DRAWING REV. JUNE 2012.
9. THE USE, LOCATION AND MESSAGES OF THE PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) SHALL BE
ONLY AS DIRECTED BY THE ENGINEER.
10. THE CONTRACTOR SHALL FURNISH TEMPORARY TRAFFIC CONTROL DEVICES THAT MEET THE NATIONAL
COOPERATIVE HIGHWAY RESEARCH PROGRAM REPORT (NCHRP) CURRENT CRITERIA FOR THE APPLICABLE
CRASH WORTHINESS STANDARD.
11. ALL EXISTING SIGNS AND TRAFFIC CONTROL SIGNS DETERMINED BY THE ENGINEER TO BE UNNECESSARY
FOR THE APPLICABLE CONSTRUCTION OPERATION SHALL BE IMMEDIATELY COVERED IN ITS ENTIRETY WITH
NON ABRASIVE MATERIAL AND SHALL BE INSPECTED DURING DAY AND NIGHT TIME TO ENSURE THAT THE SIGN
IS NOT READABLE. THIS WORK IS A SUBSIDIARY OBLIGATION OF THE CONTRACT UNDER EXISTING PAY ITEMS.
12. DURING THE CONSTRUCTION OPERATIONS, THE CONTRATOR SHALL TAKE ALL THE NECESSARY
PRECAUTIONS AND MEASURES TO AVOID FALLING DEBRIS, TOOLS, EQUIPMENT OR ANY OTHER MATERIALS
INTERFERE OR IMPACT THE MOTORING PUBLIC IN THE ROADWAY. ALL THE MATERIALS, LABOR EQUIPMENT, AND WORK NECESSARY FOR IMPLEMENTING THIS REQUIREMENT IS SUBSIDIARY OBLIGATION OF THE
CONTRACT UNDER EXISTING PAY ITEMS.
13. THE CONTRACTOR SHALL MAINTAIN ACCESS AT ALL TIMES TO ADJACENT PROPERTIES DURING
CONSTRUCTION. THIS WORK WILL REQUIRE COORDINATION WITH BUSINESSES AND PRIVATE OWNERS. ALL THE
MATERIALS, LABOR, EQUIPMENT, AND WORK NECESSARY FOR IMPLEMENTING THIS REQUIREMENT IS
SUBSIDIARY OBLIGATION OF THE CONTRACT UNDER EXISTING PAY ITEMS.
14. TEMPORARY CONCRETE BARRIER END SECTION SHALL COMPLY WITH DRAWING NO. MPT-03 OF THE PRHTA
STANDARD. DRAWING REV. JUNE 2012, AND USE AT TRAFFIC SIDE.
15. NO EXCAVATION AND/OR PAVEMENT DROP-OFF SHALL REMAIN OPEN WITHIN THE TRAVELED WAY WHEN
THE CONTRACTOR OR ITS PERSONNEL IS NOT WORKING AND PHYSICALLY PRESENT AT THE WORK SITE.
16. IN CASE THAT THE WORKS AFFECTED THE EXISTING LUMINARY THE CONRACTOR SHALL PROVIDE
ADEQUATE ILLUMINATION IN THE AFFECTED AREA BUT THE GLARE OF THE SAME NO AFFECT THE VISIBILITY OF
THE DRIVERS.
17. TEMPORARY CONCRETE BARRIER SHALL BE USED TO PROTECT VEHICULAR TRAFFIC FROM EXCAVATION
OR PAVEMENT DROP-OFF AREAS EQUAL OR GREATER THAN 0.30 METERS DEEP THAT WILL REMAIN OPEN FOR
A DURATION OF MORE THAN ONE DAY, AS APPROVED BY THE ENGINEER.
18. IN ALL CONSTRUCTION OPERATIONS UNDER THIS CONTRACT, ALL PRECAUTIONS SHALL BE EXERCISED IN
ORDER THAT THE MOVEMENT OF EQUIPMENT AND CONSTRUCTION WORK SHALL BE PERFORMED IN SUCH A
WAY AS TO AVOID UNNECESSARY INCONVENIENCES TO TRAFFIC.
19. PROVISIONAL SIGNING AND TRAFFIC CONTROL SHALL BE AS PROVIDED IN PART 6 "TEMPORARY TRAFFIC
CONTROL" OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D), 2009 EDITION.
20. ALL TRAFFIC CONTROL DEVICES SHALL BE CLEANED, REPAINTED, REFLECTORIZED OR REPLACED AS
NECESSARY TO PROVIDE ADEQUATE VISIBILITY AND LEGIBILITY AT ALL TIMES.
21. THE PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY IT DOES RESERVES THE RIGHT TO STOP
THE WORKS AT ANY TIME IF THE CONTRACTOR DO NOT COMPLY WITH THE MAINTENANCE OF TRAFFIC AND THE
SAFETY REGULATIONS.
22. TEMPORARY CONTROL TRAFFIC CONTROL DEVICES SHALL MEET MASH STANDARD
CONSTRUCTION SCHEDULE
THE FOLLOWING CONSTRUCTION SCHEDULE AND SPECIAL INSTRUCTIONS SHALL BE FOLLOWED, IN
ORDER TO MAINTAIN TRAFFIC FLOW WITH "THE LEAST POSSIBLE INTERFERENCE FROM
CONSTRUCTION OPERATIONS".
TYPICAL APPLICATIONS ARE SUMITTED FOR THE TEMPORARY TRAFFIC CONTROL ACTIVITIES FOR A
VARIETY OF SITUATIONS COMMONLY ENCOUNTERED. IT IS REQUIRED FROM THE ENGINEER TO
ADJUST THESE GUIDELINES TO FIELD CONDITIONS.
SPECIFIC SITUATIONS NOT COVERED BY THESE APPLICATIONS SHALL BE BROUGHT UP TO THE
ENGINEER FOR APPROPIATE DIRECTION AND CLARIFICATION 10 DAYS BEFORE THE BEGINNING OF
THE CONSTRUCTION WORK IN THAT AREA.
CONSTRUCTION:
1. IMPLEMENT THE WORK ZONE TEMPORARY TRAFFIC CONTROL IN ACCORDANCE WITH THE
MAINTENANCE OF TRAFFIC INDICATED ON THE PLANS (MOT-2 TO MOT-5).
2. INSTALL PCMS TO COMPLEMENT SIGNING AS REQUIRED BY EACH ACTIVITY TYPE.
3. THE DETAILS SHOWN SHALL BE USED IN BOTH DIRECTIONS.
TRAFFIC:
1. THE TRAFFIC WILL BE FLOWING AS INDICATED ON THE MAINTENANCE OF TRAFFIC USED FOR THE
CONSTRUCTION AREA.
2. ALL WORK TO BE PERFORMED SHALL BE COORDINATED WITH THE TRAFFIC ENGINEERING OFFICE
PERSONNEL.
3. NO WORK SHALL BE ALLOWED DURING PEAK HOURS. THE PEAK HOURS ARE DEFINED AS 6:00 AM -
9:00 AM AND 3:00 PM - 6:00 PM FROM MONDAY TO FRIDAY.
4. ALL ACTIVITIES PROPOSED FOR THE PROJECT THAT AFFECT THE NORMAL FLOW OF TAFFIC, SHALL
BE COORDINATED WITH ALL PROJECTS THAT ARE WITHIN A COVERAGE RADIUS OF TWO MILES OF
THE WAY THAT THEY DO NOT AFFECT EACH OTHER.
5. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER THE ACCESS POINTS FOR
CONSTRUCTION VEHICLES. INSTALL SIGN W8-6 (TRUCK CROSSING - 36" X 36") TO ALERT ROAD USERS
OF LOCATIONS WHERE UNEXPECTED TRAVEL BY CONSTRUCTION VEHICLES MIGHT OCCUR.
23. THE ESTIMATE WORKING DAYS IN THE M.O.T.ARB:
PR-155 KM. 36.15 = 4 MO (122 DAYS)
24. OVERNIGHT LANE CLOSURE HOURS SHALL BE FROM 6:30PM. TO 6:30AM., IN CASE OF ONE LANE / TWO -
WAY TRAFFIC TWO RED / YELLOW LENS AUTOMATED FLAGGER ASSISTANCE DEVICE (AFAD) WILL BE INSTALLED.
25. THE CONTRACTOR SHALL PAINT THE PERMANENT ROAD LINES EQUAL TO EXISTING WHEN FINISHES THE
WORKS AT ALL SITES.
TYPE OF TAPER
MERGING TAPER
AT LAST L
SHIFTING TAPER
TAPER LENGHT
SHOULDER TAPER
TRAFFIC TAPER
ONE-LANE,TWO WAY
DOWNSTREAM TAPER
AT LAST 0.5L
AT LAST 0.33L
50 FEET MINIMUM, 100 MAXIMUM
50 FEET MINIMUM, 100 MAXIMUM
(TABLE 6C-3, MUTCD 2009)
SPEED(S)
40 MPH OR LESS
L=
45 MPH OR MORE
MUTCD TABLE 6C-4
FORMULA FOR DETERMINING
TAPER LENGTH
TAPER LENGHT(L) (FEET)
WS
L= WS
WHERE: L= TAPER LENGHT IN FEET
W= WIDTH OF OFFSET IN FEET
S= POSTED SPEED LIMIT, OR OFF-PEAK
85TH-PERCENTILE SPEED PRIOR TO
WORK STARTING, OR THE ANTICIPATED
OPERATING SPEED IN MPH.
(TABLE 6C-4, MUTCD 2009)
URBAN (HS)
AUTOMATED FLAGGER ASSISTANCE
DEVICE (AFAD)
(SEE GENERAL NOTE NO-26 ON THIS DWG)
26. FLAG PERSONS WILL NOT BE MEASURED FOR DIRECT PAYMENT BUT SHALL BE SUBSIDIARY OBLIGATION
OF THE CONTRACTOR COVERED UNDER OTHER CONTRACT ITEMS (SPEC. 638-4.01 (L).
N ot e:
T he M
O T is p ai d fo r a t c on tra ct lu m p su m p ric e, w hi ch is d es cr ib ed in th e
SC
R
, M O
T pl an s, a nd a ll th e ne ce ss ar y ite m s to fu lfi ll th e
M O
T.
T he c on tra ct or s ha ll co ns id er a ny ad di tio na l i te m s or q ua nt iti es th at m ay b e ne ed ed to e st ab lis h th e M
O T in th ei r p ric e pr op os al
SHOULDER
WORK
AREA
SHOULDER
TRUCK-MOUNTED-ATTENUATOR
FLASHING ARROW
(CAUTION MODE)
OUTSIDE SHOULDER CLOSURE
TEMPORARY AND PERMANENT TRAFFIC SIGNS INSTALLATION
SHORT-DURATION OR MOBILE OPERATION
NOTE:
- FOR EACH TYPICAL APPLICATION, THE DISTANCE BETWEEN SIGNS,
TAPER AND BUFFER LONGITUDINAL LENGTH SEE THE TABLE
ON SHEET MOT/1.
- THE WORK AREA LONGITUDINAL LENGTH IT WILL DEPEND OF
THE PROJECT ENGINEER APPROVAL BUT IT SHALL NOT EXCEED
60 MTS.
THIS SCHEME MAY BE USED AS MIRROR IMAGE
TYPICAL APPLICATION DIAGRAM TWO LANE RURAL ROAD I
TYPICAL APPLICATION DIAGRAM II
N.T.S.
N.T.S.
TYPICAL APPLICATION DIAGRAM "PASEO" III
THIS SCHEME MAY BE USED AS MIRROR IMAGE
THIS SCHEME MAY BE USED AS MIRROR IMAGE AND NO FOR PAVING OPERATIONS (WITH DRUMS)
TYPICAL APPLICATION DIAGRAM TWO LANE RURAL ROAD V
TYPICAL APPLICATION DIAGRAM TWO LANE RURAL ROAD IV
N.T.S.
TYPICAL APPLICATION DIAGRAM TWO LANE RURAL ROAD VI
TYPICAL APPLICATION DIAGRAM TWO LANE RURAL ROAD VII
TYPICAL APPLICATION DIAGRAM TWO LANE RURAL ROAD VIII
STRUCTURE
OVERHEAD
SIGN
SIZE OF
TYPEPANELS
SIGNLOCATIONCODE
NUMBER NUMBER
CODE
L E G E N D
TOTALREFERENCE
MANUAL ITEM
OFFSET REQUIREMENTS
ROUTE
URBAN ROADS
FROM
ALL PROJECT
TO
.60 mts.
OFFSET
ALL PROJECT
W20-1 36" X 36" N/A
N/AG20-2A 48"X36"
OTHER ROADS ALL PROJECT
.60 mts.
ALL PROJECT
13,20,21,28 2
16,17,24,25 2
STRUCTURE
OVERHEAD
SIGN
SIZE OF
TYPEPANELS
SIGNLOCATIONCODE
NUMBER NUMBER
CODE
L E G E N D
TOTALREFERENCE
MANUAL ITEM
N/A
15,18,23,26
W20-7(A) 36"X36"
16 14,19,22,27
W20-4 36" X 36" N/A
N/AW13-1 12"X24"
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
MANUAL
SEE
D.T.P.W.
AND
M.U.T.C.D.
MANUAL
SEE
D.T.P.W.
AND
M.U.T.C.D.
MANUAL
SEE
D.T.P.W.
AND
M.U.T.C.D.
MANUAL
SEE
D.T.P.W.
AND
M.U.T.C.D.
W13-1
12" X 24"
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
THIS
SIGN
WAS
OMIT
0 8 m4 m
4. ON ANY GIVEN LEVEL BASKETS WITH EXPOSED
FACES MUST BE FILLED PRIOR TO FILLING
BASKETS WITH NO EXPOSED FACE.
5. BASE OF GABION MUST BE CONSTRUCTED BELOW
SCOUR DEPTH NEXT TO STREAMS.
6. EXTERIOR GABIONS SHALL CONSIST OF WIRE MESH
BASKETS FILLED BAY HAND PLACEMENT OF COARSE
AGGREGATE, AT LEAST ALONG THE EXPOSED FACES,
FOR A UNIFORM APPEARANCE.
7. INTERIOR GABIONS SHALL CONSIST OF WIRE-MESH
BASKETS FILLED BY HAND PLACEMENT OR SMALL
POWER EQUIPMENT PLACEMENT OF COARSE AGGREGATE.
1. CROSS TIES MAY BE FABRICATED IN THE FIELD USING
WIRE (0.087 IN).
2. DO NOT MIX STRAIGHT AND CROSSED CROSS TIES IN
THE SAME GABION INSTALLATION.
3. FOR 3 FT (0.914 M) GABIONS, CROSS TIES SHALL BE
ATTACHED AT 1/3 AND 2/3 OF THE GABION HEIGHT
AS THE CELL IS BEING FILLED.
4. FOR 1.5 FT (0.457 M) AND 1.0 FT (0.305 M) GABIONS,
CROSS TIES SHALL BE INSTALLED AT THE HALF HEIGHT
LEVEL.
5. CROSS TIES SHALL BE INSTALLED IN BOTH DIRECTIONS
(LONGITUDINAL AND FRONT TO BACK) IN EXTERNAL GABIONS.
USE LONGITUDINAL CROSS TIES IN INTERNAL GABIONS.
1. USE NON-INTERLOCKING FASTENERS FOR ASSEMBLY
OF GABION BASKETS.
2. USE ONE FASTENER PER WIRE MESH OPENING EXEPT USE
TWO PER WIRE MESH OPENING ON EXPOSED ENDS OF
GABION BASKETS AT BEGINING OR END OF ROW.
3. EDGES OF GABION BASKETS SHALL BE JOINED USING THE
APPROPRIATE LACING TECHNIQUES.
MANUAL: CONTINUOUS WIRE LOOPED TIGHTLY AROUND
EVERY OTHER MESH OPENING, ALTERNATING SINGLE AND
DOUBLE LOOPS.
MECHANICAL: USING A PNEUMATIC OR HAND TOOL, EMPLOYING
STAINLESS STEEL "C" SHAPED FASTENERS. FOR CONTINUITY AND
STRENGTH, THE RECOMENDED SPACING IS 4 IN. THE MAXIMUM
SPACING SHALL BE 6 IN.
1 2 3 4
1 2 3 4
² ²
1. ALL TWISTED WIRE GABIONS SHALL COMPLY
WITH ASTM A975-97
2. ALL GABIONS MUST BE PVC-COATED AS SPECIFIED
FOR STYLE 3 IN THE ASTM A975
3. ALL GABIONS SHALL CONSIST OF DOUBLE-TWISTED
WIRE MESH MADE FROM WIRE WHICH IS ZINC-COATED
BEFORE BEING DOUBLE-TWISTED INTO MESH.
FASTENERS, LACING WIRE, AND STIFFENERS ARE
PRODUCED FROM ZINC-COATED WIRE.
4. OVERLAPING STAINLESS STEEL FASTENERS MAY BE
USED IN LIEU OF LACING WIRE FOR BASKET ASSEMBLY
AND INSTALLATION.
5. FOR GABION BASKETS REFERE TO PRHTA STANDARD
DRAWING (GABI-01 TO GABI-10) AND STANDARD SPECS.
614-GABIONS.
2. ROCKS SHALL BE HARD, ANGULAR TO ROUND, DURABLE AND OF SUCH QUALITY THA THEY
SHALL NOT DISINTEGRATE ON EXPOSURE TO WATER OR WEATHERING DURING THE LIFE OF THE
STRUCTURE.
4. THE GABION INSTALLATION AND SPECIFICATION SHALL COMPLY WITH MANUFACTURER
REQUIREMENTS AND STANDARD SPECIFICATION 615.
3. BULGES OR DEPRESSIONS OF THE GABION BASKETS SHALL NOT EXCEED 2 INCHES (0.051 M) WHEN
MEASURED WITH A 3 FOOT (0.914 M) STRAIGHT EDGE. DEVIATIONS SHALL BE CORRECTED AT THE
CONTRACTOR'S EXPENSE.
2. GABION BASKETS MAY BE SUPPLIED AS ASSEMBLED, UN-ASSEMBLED OR ROLL STOCK.
1. STAGGER THE VERTICAL JOINTS BETWEEN THE BASKETS OF ADJACENT ROWS AND LAYERS BY ONE
HALF CELL LENGHT.
3. GABION BASKETS 12 INCHES (0.305 M) OR GREATER IN THE VERTICAL DIMENSION SHALL BE
FILLED WITH ROCKS GRADED FROM LARGE TO SMALL WITH 100% PASSING AN 8-INCH SIEVE
AND 100% RETAINED ON A 4-INCH SIEVE. ROCKS SHALL HAVE A MAXIMUM DIMENSION OF 8
INCHES (0.204 M) AND A MINIMUM OF 4 INCHES (0.102 M).
5. CARE SHALL BE TAKEN WHEN PLACING THE STONE TO ASSURE THAT THE PVC COATING OF
GABIONS WILL NOT BE DAMAGED. ROCKS SHOULD NOT BE MACHINE PLACED FROM HEIGHTS
GREATER THAN 2 FEET (0.610 M) ABOVE BASKET.
6. GABION PLACEMENT SHALL BE FRONT TO FRONT AND BACK TO BACK, SO THAT PAIRS OF
FACING LIDS CAN BE WIRE DOWN IN ONE PROCESS.
7. TO ALLOW FOR SETTLEMENT, LEVEL OFF THE ROCK FILL 1 INCH (0.025 M) TO 1.5 INCHES
(0.038 M) ABOVE THE TOP OF THE MESH.
4. THE ROCKS SHALL HAVE A PERCENT OF WEAR NOT MORE THAN 45 WHEN TESTED BY AASHTO T96.
1. ROCKS FOR GABIONS MAY BE PRODUCED BY ANY SUITABLE QUARRYING METHOD, AND BY THE
USE OF ANY DEVICE THAT YIELDS THE REQUIRED SIZES WITHIN THE GRADATION LIMITS
SPECIFIED.
3. DURING THE FILLING OPERATION SOME MANUAL STONE PLACEMENT IS REQUIERED TO MINIMIZE
VOIDS AND GIVE THE EXPOSED FACES OF VERTICAL STRUCTURES A NEAT, FLAT, AND COMPACT
APPEARANCE. THE CELLS SHALL BE FILLED IN STAGES SO THAT LOCAL DEFORMATION MAY BE
AVOIDED. AT NO TIME SHALL ANY CELL BE FILLED TO A DEPTH EXCEEDING 1 FOOT (0.305 M)
HIGHER THAN THE ADJOINING CELL.
2. GABIONS SHALL BE CONNECTED TOGETHER AND ALIGNED BEFORE FILLING THE BASKET WITH
ROCKS. ALL CONNNECTIONS (PANEL TO PANEL AND BASKET TO BASKET) SHALL BE ALREDY
CARRIED OUT AS DESCRIBED IN THE ASSEMBLY OPERATIONS.
1. GABIONS SHALL BE SET TO THE LINE AND GRADE SPECIFIED IN THE CONSTRUCTION DRAWINGS.
2. THE PROCEDURE FOR USING LACING WIRE CONSIST OF CUTTING A SUFFICIENT LENGHT OF WIRE
AND FIRST LOOPING AND/OR TWISTING THE LACING WIRE TO THE WIRE MESH. PROCEED TO
LACE WITH ALTERNATING DOUBLE AND SINGLE LOOPS THROUGTH EVERY MESH OPENING
APROXIMATELY EVERY 6 INCHES (0.152 M) PULLING EACH LOOP TIGHT AND FINALLY SECURING
THE END OF THE LACING WIRE TO THE WIRE MESH BY LOOPING AND/OR TWISTING.
1. THE TOP CORNER OF THE END PANELS AND CENTER DIAPHRAGMS HAVE AN EXTENDED SELVEDGE
WIRE EXTENDIGN APPROX. 4 INCHES (0.102 M) OUT FROM THE CORNER EDGE. RISE THE END
PANELS AND THE DIAPHRAGMS TO VERTICAL POSITION AND WRAP THE SELVEDGE WIRE AROUND
THE EDGE WIRE OF THE TOP AND BACK PANELS.
4. CLOSE THE BASKETS AFTER ROCK FILLING BY FOLDING THE LID DOWN, PULLING THE EDGES OF
THE PANELS TO BE CONNECTED WHERE NECESSARY USING USING APPROPIATE TOOL. THE LIDS
SHALL BE TIGHTLY LACED ALONG ALL EDGES, ENDS AND DIAPHRAGMS IN THE SAME MANNER AS
DESCRIBED FOR ASSEMBLY. ADJACENT LIDS MAY BE SECURELY ATTACHED SIMULTANEOUSLY.
ALL END WIRES SHALL THEN BE TURNED IN.
3. INTERNAL CONNECTING WIRE STIFFENERS SHALL BE ATTACHED AT 1/3 AND 2/3 OF THE HEIGHT
OF 3 FEET (0.914 M) GABION UNITS AS THE CELL IS BEING FILLED. IN 1.5 FEET (0.457 M)HIGH UNITS
STIFFENERS MAY BE FIXED AT THE HALF HEIGHT LEVEL.
4. THE GEOTEXTILE USED SHALL COMPLY WITH STANDARD SPECIFICATION 712-7.
3. GEOTEXTILE FOR GABION GRAVITY RETAINING WALLS SHALL CONFORM WITH AASHTO M288,
CLASS-2, WITH ELONGATION GRATER OR EQUAL TO 50% AND SUBSURFACE DRAINAGE
REQUIREMENTS FOR IN SITU SOIL PASSING THE #200 SIEVE BETWEEN 15% AND 50%.
2. THE GEOTEXTILE SHALL RUN THE ENTIRE HEIGHT OF THE GABION WALL.
1. GEOTEXTILE FILTER SHALL BE PLACED BETWEEN THE GABION AND THE BORROW BACKFILL.
GEOTEXTILE FILTER
SEE SPECIFICATION 712-7
BACKFILL MATERIAL
A-2-4 OR BETTER
TEMPORARY
CUT
Phase 1
Phase 3
Phase 2
Refer to Technical Spec. 605 & 712
Refer to Technical Spec. 605 & 712
2 1
8 6
LEGEND:
EXISTING
TREE INVENTORY
File details come from the government source that posted it. Updated .