This document is the Results of Bid Opening for Solicitation No. 693C73-24-B-000015 for the Landslide Repairs in Morovis, Puerto Rico project (PR ER DOT PRMNT RPR(17)).

The project consists of repairing landslides and washouts caused by Hurricanes Irma and Maria on PR-155 and PR-159 in Morovis, Puerto Rico. The work includes embankment reconstruction, shotcrete wall construction, soil nail wall construction, Reinforced Soil Slope (RSS) system construction, gabion wall construction, Mechanically Stabilized Earth (MSE) retaining wall construction, drainage system installation, milling and overlay, pavement reconstruction, pavement markings, removal and replacement of guardrails, signage, and maintenance of traffic. The project is split into multiple work schedules/contract options, with the total estimated cost between $10,000,000 and $15,000,000. Bids were due on September 5, 2024 at 2:00 p.m. EDT. The bid results show the total bid prices from the four bidders, as well as the government estimate. The performance period is 1235 calendar days if the contract is awarded for all schedules, or 695-1050 calendar days if awarded separately.

View the file

Other files

File Type Posted
Amendment 0004 - PR ER DOT PRMNT RPR(17).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(17).pdf PDF
Amendment 0002 Plans - AC-857579_HWY-258 260 261 262 263 265 - Part 4 of 4.pdf PDF
Amendment 0002 Plans - AC-857579_HWY-258 260 261 262 263 265 - Part 3 of 4.pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(17).pdf PDF
Amendment 0002 Plans - AC-857579_HWY-258 260 261 262 263 265 - Part 1 of 4.pdf PDF
Amendment 0002 Plans - AC-857579_HWY-258 260 261 262 263 265 - Part 2 of 4.pdf PDF
Amendment 0001 Plans - AC-905579_HWY-483 - Full-Size Part 1 of 2.pdf PDF
Amendment 0001 Plans - AC-857579_HWY-258 260 261 262 263 265 - Full-Size Part 2 of 3.pdf PDF
Amendment 0001 Plans - AC-916579_HWY-286 287 - Full-Size.pdf PDF
Amendment 0001 Plans - AC-908579_HWY-257 - Full-Size.pdf PDF
Amendment 0001 Plans - AC-857579_HWY-258 260 261 262 263 265 - Full-Size Part 3 of 3.pdf PDF
Amendment 0001 Plans - AC-919579_HWY-259 - Full-Size.pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(17).pdf PDF
Amendment 0001 Plans - AC-857579_HWY-258 260 261 262 263 265 - Full-Size Part 1 of 3.pdf PDF
Amendment 0001 Plans - AC-893579_HWY-264 - Full-Size.pdf PDF
Amendment 0001 Plans - AC-905579_HWY-483 - Full-Size Part 2 of 2.pdf PDF
Geotechnical Report - AC-857579_HWY-258 260 261 262 263 265.pdf PDF
Utility Status Report - AC-905579_HWY-483.pdf PDF
Lead Based Paint Report - AC-916579_HWY-286.pdf PDF
Geotechnical Report Addendum - AC-905579_HWY-483.pdf PDF
Lead Based Paint Report - AC-905579_HWY-483.pdf PDF
Utility Status Report - AC-857579_HWY-260 261 265.pdf PDF
Utility Status Report - AC-916579_HWY-287.pdf PDF
Plans - PR ER DOT PRMNT RPR(17) - 893579_HWY-264_plot.pdf PDF
Technical Report - AC-908579_HWY-257.pdf PDF
VETS-4212 Form.pdf PDF
Categorical Exclusion Form (NEPA) - AC-857579_HWY-258 260 261 262 263 265 (Part 1 of 2).pdf PDF
Technical Report - AC-893579_HWY-264.pdf PDF
Geotechnical Report Addendum - Letter AC-857579_HWY-260.pdf PDF
Geotechnical Report Addendum - Letter AC-857579_HWY-262.pdf PDF
Plans - PR ER DOT PRMNT RPR(17) - AC-905579_HWY-483_plot.pdf PDF
Categorical Exclusion Form (NEPA) - AC-916579_HWY-286 287.pdf PDF
Geotechnical Report Addendum - Letter AC-857579_HWY-261.pdf PDF
Categorical Exclusion Form (NEPA) - APPENDIX B_PLANS_SITE-264.pdf PDF
Lead Based Paint Report - AC-916579_HWY-287.pdf PDF
Utility Status Report - AC-908579_HWY-257.pdf PDF
Asbestos and Lead Report - AC-857579_AC-919579 (Part 3 of 3).pdf PDF
Geotechnical Report - AC-919579_HWY-259.pdf PDF
Asbestos Report - AC-908579_HWY-257.pdf PDF
PRHTAs Material Testing Schedule.PDF PDF
Utility Status Report - AC-857579_HWY-260.pdf PDF
Categorical Exclusion Form (NEPA) - AC-919579_HWY-259 (Part 2 of 2).pdf PDF
Plans - PR ER DOT PRMNT RPR(17) - 916579_HWY-286 287_plot.pdf PDF
Technical Report - AC-919579_HWY-259.pdf PDF
Carlos E. Ocasio_LBP_Exp-08.26.24.pdf PDF
Utility Status Report - AC-919579_HWY-259_PRASA.pdf PDF
Geotechnical Report Addendum - Letter 1_AC-893579_HWY-264.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Technical Report - AC-916579_HWY-287.pdf PDF
Show 40 more

Latest 50 of 101 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration

Eastern Federal Lands Highway Division

Bid Opening for

Landslide Repairs in Morovis, Puerto Rico

PROJECT: PR ER DOT PRMNT RPR(17)

SOLICITATION NO. 693C73-24-B-000015

September 5, 2024 at 2:00 p.m. EDT

Ashburn, Virginia

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-24-B-000015

Project: PR ER DOT PRMNT RPR(17)

September 5, 2024, 2:00 p.m. EDT

BIDDER’S BID TOTALS TOTAL PRICE

Design Build, LLC SCHEDULE A

$9,163,477.00

SCHEDULE B

$1,372,560.00

SCHEDULE C

$5,716,162.50

SCHEDULE A + OPTION 1 + OPTION 2 =

$16,252,199.50

LPC Contractors, Inc. SCHEDULE A

$10,799,490.00

SCHEDULE B

$700,000.00

SCHEDULE C

$5,700,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$17,199,490.00

Maglez Engineering & Contractors Corp. SCHEDULE A

$8,351,159.75

SCHEDULE B

$941,690.00

SCHEDULE C

$4,391,781.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$13,684,630.75

If the Government awards the Contract as Schedules A + B + C, the performance period to complete all contract work will be 1235 calendar days. If separate: Schedules A + B will be 865 calendar days; Schedules A + C will be 1050 calendar days; Schedule A will be 695 calendar days;

Schedule B will be 255 calendar days; and Schedule C will be 460 calendar days.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-24-B-000015

Project: PR ER DOT PRMNT RPR(17)

September 5, 2024, 2:00 p.m. EDT

BIDDER’S BID TOTALS TOTAL PRICE

Novel Construction, LLC SCHEDULE A

$8,061,826.00

SCHEDULE B

$661,964.00

SCHEDULE C

$3,733,410.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$12,457,200.00

Engineer’s Estimate SCHEDULE A

$6,925,000.00

SCHEDULE B

$615,000.00

SCHEDULE C

$3,485,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$11,025,000.00

If the Government awards the Contract as Schedules A + B + C, the performance period to complete all contract work will be 1235 calendar days. If separate: Schedules A + B will be 865 calendar days; Schedules A + C will be 1050 calendar days; Schedule A will be 695 calendar days;

Schedule B will be 255 calendar days; and Schedule C will be 460 calendar days.

Slide 1
Slide 2: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-24-B-000015 Project: PR ER DOT PRMNT RPR(17) September 5, 2024, 2:00 p.m. EDT
Slide 3: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-24-B-000015 Project: PR ER DOT PRMNT RPR(17) September 5, 2024, 2:00 p.m. EDT

File details come from the government source that posted it. Updated .