(U) TRB N01-0757_APS.pdf
PDF 100 KB Posted
- Solicitation number
- HM047625R0016_Bidder_Library
About this file
This is a system description document for the Aeronautical Production System (APS), document number N01-0757, issued by MC&G (likely a federal agency component). The document describes a cloud-based data management solution designed to handle En Route data, Terminals data, Airfield Foundation Data, and Vertical Obstruction data. The system leverages the National Geospatial-Intelligence Agency's (NGA) Common Operating Release Environment (CORE) platform for development and deployment, providing Platform as a Service (PaaS) capabilities, DevSecOps practices, and orchestration of container-based web services. The document originator is Eric Vehige.
The document is currently out for Technical Review Board (TRB) review with the following key dates: change logs are due by November 13, 2024; final TRB approval is scheduled for November 18, 2024; and a Configuration Control Board (CCB) meeting is scheduled for December 11, 2024. This document serves as a capabilities description for the APS system rather than a solicitation for contract services or a performance work statement. It is classified as UNCLASSIFIED.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
UNCLASSIFIED
N01-0757 APS Description Document
(U) Abstract: This document describes the capabilities of the Aeronautical Production System (APS). This system provides a cloud-based data management solution for En Route data, Terminals data, Airfield Foundation Data, and Vertical Obstruction data that utilizes NGA’s Common
Operating Release Environment (CORE) for development and deployment. This environment provides Platform as a Service (PaaS), DevSecOps, and orchestration of container-based web services.
➢ Originator: Eric Vehige
➢ Out for TRB Review
➢ Change Logs Due: 13 November 2024
➢ Final TRB Approval: 18 November 2024
➢ Scheduled CCB Date: 11 December 2024
Slide 1: N01-0757 APS Description Document
File details come from the government source that posted it. Updated .