This document is the NGA Cloud Guidance: Introduction (Version 5.2), dated June 30, 2018, which serves as a foundational planning document for the National Geospatial-Intelligence Agency's cloud migration and operations strategy. The guidance is non-contractual but provides mandatory direction to be incorporated into contractual actions for all NGA cloud-based activities. The document establishes that NGA will endeavor to operate all enterprise activities in the cloud to support the GEOINT 2022 Concept of Operations (CONOPS), which emphasizes three phases: modernization, automation, and anticipatory analysis. The cloud strategy employs a tiered approach prioritizing new efforts aligned with 2022 CONOPS objectives (Tier 1—cloud native, leveraging Platform-as-a-Service and DevOps), key persistent activities requiring refactoring (Tier 2), and other activities selected for migration only if business case analysis demonstrates Return on Investment (Tier 3). The guidance applies to all community and public clouds available to NGA and will be updated as required by the Chief Information Officer-T.

Key operational guidance mandates include: registering "gold" data in the ATLAS activities listing; establishing retirement dates for legacy activities no later than contract end date or ISP recap date; adopting required enterprise services as government-furnished property; following prescribed security, DevOps, and design template guidance; maximizing cloud operational availability through multi-Availability Zone deployments and auto-scaling; requiring unlimited data rights in contract language; and treating cloud guidance as a contract requirement for all contracted activities. New investments must be cloud native per the Twelve Factor App Principles and follow a prioritized adoption methodology: first adopt existing community capabilities, second adopt and modify if needed, third acquire and augment core capabilities, and fourth develop and publish if other options are unavailable. All exceptions to cloud guidance must be submitted through a governance process via waiver form to the Cloud Engineering Panel, requiring data-driven evidence that the cloud environment cannot support the activity and proof of requests for necessary Cloud Service Provider support. The document includes eleven supporting annexes addressing IC ITE services, GEOINT services designation, enterprise services, lifecycle and DevOps processes, design patterns, data guidance, security controls, architecture, and business models, along with a comprehensive glossary of 300+ federal and intelligence community acronyms and abbreviations.

View the file

Other files

File Type Posted
(U) VCPS_Breakout_Citrix_Alignment .pptx PPTX presentation
FINAL_Consolidated FS3i QA 2APR 2026.xlsx XLSX spreadsheet
(U) NIST500-317 Cloud Computing Accessibility Considerations_draft.pdf PDF
(U) NGA_Systems_Engineering_Plan_SEP_Rev B.pdf PDF
(U) NSGM3202_GFMSA_Program_Manual.pdf PDF
(U) DoDI8510-01_RMF_DoD_IT_change_3.pdf PDF
(U) NGAI 8040.2_Records Mgmt Prog_21OCT2020.pdf PDF
(U) NGAI 5205.6_Lifecycle Protection of Geospatial Info_16OCT2018.pdf PDF
(U) NSGD3201_GFMSA_Program_Directivew.pdf PDF
(U) OMB M-17-06_Policy for Fed Agency Pub Websites Digital Services.pdf PDF
(U) FS2 Aero Task Order APS CONOPS.pdf PDF
(U) NGAD8010_Info_Sys_RMF_Update_16.pdf PDF
(U) NGAI 8010.1_Info Sys Risk Mgmt Framework_Update_1.pdf PDF
(U) Annex_G_Cloud_Data_Guidance_v5.2.pdf PDF
(U) NGA Program Level Agile Process.docx DOCX document
(U) WebDVOF to FS2 Addendum_v9.pdf PDF
(U) Annex_D_Enterprise_Services_v5.2.pdf PDF
(U) DODI_5000.87 SoftwareAcqPathway.pdf PDF
(U) Air_SLO_VDD v1.0.3.pdf PDF
(U) NGAI 8955.6_NGA Web Property Standards & Guidelines_Update_1.pdf PDF
(U) NGAI 3020.26_Continuity of Operations Program_Update_1.pdf PDF
(U) NGAI80102_rev7_Information_System_Security_Training.pdf PDF
(U) NGA_CTDR_Template_05122025.xlsx XLSX spreadsheet
(U) FS2 Aero Task Order APS Addendum.pdf PDF
(U) NGAI 8040.1_Configuration Mgmt_21NOV2018.pdf PDF
(U) DOD_CIO_SW_Dev_Open_Source_Guidance_SW_26JAN2022.pdf PDF
(U) NGAI 8400.4_Implementation of Electronic & Info Tech Accessibility Sec 508 Prog_Update_1.pdf PDF
(U) SFA Air High-Level As-Is SV-1.png PNG image
IPF Standard - AWS Instance Type Management.docx DOCX document
IPF Developer Environment Guidance.docx DOCX document
(U) Final_FS3i_Industry_Day_01 30 26.pptx PPTX presentation
(U) SEAD-4-Adjudicative-Guidelines.pdf PDF
(U) NGA_Technology_Strategy_MAY2020.pdf PDF
(U) NGA Cybersecurity Strategy_Gold.pdf PDF
(U) AWS_Prescriptive_Guidance_Secure_Cloud_Computing_Architecture-DoD.pdf PDF
(U) Annex_K_Cloud_Business_Guidance_v5.2.pdf PDF
(U) Annex_E_Lifecycle_Guidance_v5.0.pdf PDF
(U) As-Is FG IT Governance Processes Summary Final.pdf PDF
(U) IPMR_Implementation_Guide_5FEB2016.pdf PDF
(U) Gov_Furnished_Property_List_(GFP).pdf PDF
(U) The_NGA_Software_Way_2022.pdf PDF
(U) NGA_Data Item Description for Cost and Tech Data Report.pdf PDF
(U-FOUO) Annex_C_CAMG_Charter_v5.0.pdf PDF
(U) Air_ACE_GTO_VDD_v1.0.28.pdf PDF
(U) NGAI 5401.1_Privacy & Civil Liberties Prog_26JAN2020.pdf PDF
(U) Air_WebDVOF_VDD v6.0.1.pdf PDF
(U) NGAI 5200.1_Info Security_Update_1.pdf PDF
(U) DODD8140.01_Cyberspace_Workforce_Management_5OCT2020.pdf PDF
(U) Air_AAS_VDD_v170.3.pdf PDF
(U) Air_TAPS_VDD_1.0.0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

NGA CLOUD GUIDANCE:

INTRODUCTION

Version 5.2

30 June 2018 ii

UNCLASSIFIED

Table of Contents

Preamble ............................................................................................................................................................... iii

1.0 Introduction

1.1 Applicability

1.2 Cloud Strategy

2.0 Guidance

3.0 Annex Summaries

Annex A: IC ITE Services and Providers

Annex B: GEOINT Services Designation

Annex C: Deleted

Annex D: Enterprise Services

Annex E: Lifecycle Guidance

Annex F: Design and Implementation Patterns

Annex G: Cloud Data Guidance

Annex H: Reserved for future use

Annex I: Cloud Security

Annex J: Cloud Architecture

Annex K: Business Models

Appendix A - Glossary of Abbreviations and Acronyms iii

Preamble

IC ITE Initiative

The Intelligence Community has undertaken the IC Information Technology Enterprise (IC ITE) initiative as a platform for strengthening mission integration across the IC. IC ITE has designated service providers for cloud and common support services to “do in common what is commonly done.” NGA has supported its “all in” position by adopting community-provided services and GEOINT services for the community in a cloud-based enterprise.

The IC has established greater interoperability and efficiency within the community, and implemented an enterprise that will forge enduring synergies between agencies along with greater mission support and effectiveness. IC ITE has reached the stage where its enterprise services are fulfilling that sustainability goal of enabling IC interoperability and efficiency with the benefit of greater IC mission support.

NGA’s Future is in the Cloud

NGA’s core mission is about understanding the world, and conveying that understanding, in spatio-temporal terms. All agencies are increasingly relying upon geospatial capabilities in the cloud’s global topology. NGA is pursuing new analytical perspectives as identified in the GEOINT 2022 CONOPS. NGA will provide our GEOINT services for enterprise consumption and forge agreements with commercial providers offering advantageous GEOINT capabilities.

GEOINT is a vital part of mission support, and we can only do our part if geospatial content and services exist with a global footprint. NGA’s services must be in the cloud so that the IC, DoD and our Allies can take advantage of the cloud’s ever presence. Our ability to realize the objectives of the GEOINT 2022 CONOPS is dependent on operating in the cloud and maximizing access to geospatial data and big data analytics to support the mission.

By setting the GEOINT 2022 goals, we will challenge ourselves to think differently about our future. The time to achieve these goals does not afford us the luxury of waiting, we must progressively implement those capabilities in the cloud.

Cloud Guidance: Introduction

1.0 Introduction

1.1 Applicability

This Cloud Guidance document provides NGA Program Managers (PMs), developers, engineers, and organizational managers with a basic understanding of actions, constraints, and expectations of operations in the cloud environment.

This document itself is not contractual, but provides guidance to apply to contractual actions for cloud-based activities. The Annexes and White Papers are linked to references that provide more detailed technical implementation details important to architects, engineers, and developers.

For purposes of this guidance, an “activity” refers to any project, program, system, entity, instance, IT asset, or data that exists at NGA. It encompasses all software; hardware;

purchased and NGA-produced data; and mission and business applications associated with the activity, whether funded by NGA or managed by NGA for others (e.g., when we receive funds from others) to provide services on their behalf. Collectively, these terms are referred to as an “activity”.

The mission objectives discussed in the GEOINT 2022 Concept of Operations (CONOPS) will be achieved as we operate in the cloud. NGA will endeavor to operate all its enterprise activities in the cloud. NGA’s move to the cloud is one of many transformational initiatives that will occur on that path with the cloud being the foundation to enable that global mission support vision.

1.2 Cloud Strategy

Our success can be measured by how well we deliver the objective outcome. Mission capability analyses for GEOINT 2022 indicate that most of our legacy activities do not align with the path forward. The cloud strategy is to focus resources on efforts that will drive NGA forward. NGA’s scarce resources are best focused in the development of capabilities that would reset NGA value proposition to its stakeholders. This premise is based on the reality of scarce resources and three key assumptions:

“What got us here will not get us there”: Director Cardillo’s statement in the NGA’s GEOINT 2022 CONOPS acknowledges that our future is not a continuation of our past. The 2022 CONOPS describes three phases in the journey forward namely the modernization, automation, and anticipatory analysis. In general, cloud migration provides impetus for modernization, which enables automation of GEOINT workflows and data processing to increase our resources and focus on anticipatory analysis. The recent planning guidance calls for the automation of 75% of what NGA does today and the anticipatory phase is expected to be based on profile modeling https://ngaonline.titanium.rttitanium.nima.ic.gov/sites/Leadership/DP/SMT/SP/Strategy%20Documents/GEOINT_CONOPS_2022_TS_SI_TK_NOFORN.pdf and analytics to anticipate an adversary’s next move. These two last phases will require innovation and substantial development resources.

Refactoring and/or re-engineering applications take considerable resources:

Gartner’s cloud migration industry benchmarks call for 24 months for a lift and shift, 36 months for refactoring and 48+ months for re-engineering the solution. The refactor benchmarks were verified by NGA when it evaluated the migration of key programs. NGA’s foundational phase centered on “smart” lift and shift. The “smart” part of the approach generated cloud guidance and support (i.e., enterprise services, IaaS, PaaS, DevOps, and REvAMP).

Success is realizing the end goal, not necessarily meeting intermediate milestones: Cloud migration is the basis for accomplishing automation, which allows resources to focus on the end goal of anticipatory analysis. In this light, cloud migration should be done to the level which is effective in the path forward to support the GEOINT 2022 objectives. This progressive mindset is reinforced by the fact that more than 50% of our current efforts will not migrate.

Given that the realization of the 2022 CONOPS requires substantial effort and that NGA’s future is not a projection of its past, investments in legacy activities should be minimized in lieu of investment in new mission-focused capabilities. Cloud employment to meet GEOINT 2022 goals advocate a strategy pivot to align ongoing activities and resources in the following manner:

Tier 1 – New efforts aligned with the 2022 CONOPS These efforts will follow cloud guidance to include being cloud native, leveraging PaaS, following digital transformation processes (e.g., DevOps) and separating data from applications.

Tier 2 – Key activities (i.e., activities that persist to facilitate the 2022 CONOPS) These efforts will be refactored, if needed, to migrate and follow cloud guidance.

Tier 3 – All other activities selected for migration These efforts will not be refactored unless there is a benefit/return on investment as determined by a business case and approved by NGA.

The cloud strategy’s pivot is to pursue a Tier 1 approach, since it maximizes investment based on Return on Investment (ROI). The ROI criteria reverses the previous approach by moving from a “migrate-yes”, to a “migrate-no” default. It is based on the acknowledgement that the future is not a continuation of the past; and, recognizes the resources and investment needed to develop the required GEOINT 2022 capabilities. Applying ROI necessitates determining mission value via business cases and resets development to follow cloud guidance. Business cases can be explored if improving IT efficiencies outweigh the cost incur. Given the capabilities needed to realize the GEOINT 2022 end goal - Why spend the time and resources on changes that do not move us forward?

NGA has an established cloud migration process, the enterprise services suite is in place, and the foundational cloud engineering and support enablers (e.g., IaaS, PaaS, DevOps, REvAMP, OpenDataStore) have been initiated.

Cloud activities will pursue use of “best practices”, leverage enterprise services and capabilities, and pursue cost avoidance where possible. By engaging in refactoring efforts that provide proven ROI and proactively retiring legacy activities that do not align with our future, NGA can maximize use of its limited resources towards forging its path forward to realize the 2022 CONOPS.

2.0 Guidance

The Cloud Guidance series applies to all community and public clouds available to NGA for use at any given point in time. The CIO-T will update this guidance document, as required.

Guidance: There shall be a cloud plan for the agency.

The NGA Cloud Guidance document is a “living” planning document, which will evolve as we progress on that path to GEOINT 2022. CIO-T will coordinate the integrated cloud plan for the agency and address any cloud implementation issues for NGA’s key components.

The NGA Cloud Guidance contains binding guidance and requirements for PMs and an activity’s shareholders to apply to cloud-based implementation and operations. The NGA Cloud Strategy is a higher level document that outlines our strategic intent. Wherever there is disparity between these two documents, the NGA Cloud Guidance shall take precedence.

Guidance: Cloud development and operations shall employ standardize the tools, methods, and templates.

NGA seeks to maximize use of standardized tools, methods, and templates. Standardization strives to improve responsiveness, security, and integration at the enterprise level. New tools and services that provide greater capability will be incorporated and become part of the "standardized" suite, as they become available. NGA vetted, accredited cloud-based tools can be found at the NGA Cloud Information Portal. Before building enterprise services, survey other agencies to determine if we can adopt or adapt any services or tools they may have already fielded.

Guidance: Cloud development and operations shall apply the following guidance:

Register “gold” data in ATLAS’s activities listing.

The Data Inventory Portal hosts data migration information in support of NGA’s cloud governance process. “Gold” data is the most current information about an activity. All activities should maintain their gold data in the ATLAS and ensure that the data is sharable and up to date.

Establish a date to retire legacy activities in place.

https://intelshare.intelink.ic.gov/sites/nga-cloud/SitePages/Home.aspx https://mydata.coe.ic.gov/ee/request/folder?id=55216 https://mydata.coe.ic.gov/ee/request/folder?id=41238

Legacy or superseded activities shall retire no later than contract end date or ISP recap date or migrate to the cloud. All activities will follow the processes in the PM’s Guide to Cloud Migration via the Cloud Adoption Template (CAT).

Disposition data in accordance with Annex G: Cloud Data Guidance.

Adopt required enterprise services, as specified in Annex D: Enterprise Services Guidance.

Enterprise services will be provided as government furnished property to program offices. In some cases, activities will have to switch from their current service to the enterprise service.

Follow security guidance, as provided in Annex I: Cloud Security Guidance.

Follow DevOps guidance, as provided in Annex E: Lifecycle Guidance.

Annex E prescribes the approved tools, methods, and control points for conducting DevOps activities for NGA.

Utilize pre-approved design templates, as documented in Annex F: Design Guidance.

New design templates or additional capabilities will be provided as required.

Maximize enterprise services’ operational availability and durability in cloud operations.

The inherent design of the cloud services, can significantly increase operational availability. Activities must seek to maximize use of inherently durable cloud resources (e.g., S3). For applications that are expected to be highly available, activity owners must deploy such applications across Availability Zones (AZs) and employ load balancing. Activities must seek to use auto-scaling groups to respond to changes in demand in lieu of reserving capacity designed to peak load. For database operations, databases considered critical to application function must be deployed in multi-AZ failover configuration using either an activity defined construct or through the use of cloud-native database managed services.

Require unlimited data rights in contract language.

Allow non-NGA users and agencies to utilize GEOINT services and content and reuse code. Wherever possible, require that programs not use proprietary or fee-bearing software when other options are available that will improve the ability to share product and source code.

Treat cloud guidance as a contract requirement for all contracted activities.

Incorporate the intent of this guidance into contract language and direction as needed for all activities.

New investments are to be cloud native, as identified by the “Twelve Factor App Principles”.

New investments are to be based on the prioritized set of tradeoffs. The intent is to first leverage capabilities/services available from either industry and/or other agencies to include those offered in the IC Marketplace and AppsMall. The needed https://intelshare.intelink.ic.gov/sites/nga-cloud/SiteAssets/PMs%20Guide%20to%20Cloud%20Migration-Process%20Templates%20Expert%20Tips-v1-mfarley-032717.docx https://intelshare.intelink.ic.gov/sites/nga-cloud/SiteAssets/PMs%20Guide%20to%20Cloud%20Migration-Process%20Templates%20Expert%20Tips-v1-mfarley-032717.docx https://intelshare.intelink.ic.gov/sites/nga-cloud/SiteAssets/CAT%20Form/CAT%20Form%2020170731.docx https://go.ic.gov/MS1YbAu https://go.ic.gov/MS1YbAu https://c2s.cia.ic.gov/ https://appsmall.vm.cloud.coe.ic.gov/center/#/home/?%2F%3F%2F%3F= functional capabilities and/or services should follow the following criteria, in priority order:

1. Adopt: Adopt capabilities and/or services available from the community we operate in to include the intelligence, defense and civil communities.

2. Adopt and modify: If the development and/or mission capability and/or services is not completely suitable, we shall work with the provider to adopt and modify it to evolve and expand the original capability and/or service.

3. Acquire and augment: If unable to adopt or adopt and modify the intent would be to acquire a core capability/service and augment as needed to meet the stated requirement.

4. Develop and publish: If unable to adopt and/or adopt and modify, development should follow the cloud guidance and seek to make the capabilities/services available to the community via cloud services.

Note: Investments using lower priority precepts should make available the analysis negating the use of higher priority criteria.

Exceptions to cloud guidance shall be handled through a governance process.

All guidance must allow for exceptions and NGA’s cloud guidance. The CIO-T will handle requests for exceptions (i.e., cloud-based implementation) via a review and waiver adjudication process. PMs must submit a waiver form and supporting documentation to the Cloud Engineering Panel POCs. Additional approvals may be required (e.g., MIB). The minimum criteria to request an exception are:

Data-driven evidence that the cloud environment as it currently exists cannot support the activity.

Evidence that the activity has made every effort to request the necessary Cloud Service Provider (CSP) support.

3.0 Annex Summaries

The NGA cloud guidance is provided through a series of Annexes that address the topic specifics, processes and procedures to be met as NGA activities are established in the cloud.

This document and its supporting Annexes can be found at the Cloud Information Portal.

The site includes a Key Documents folder along with the Cloud Guidance folder holding the Annexes. Appendix A - Glossary of Abbreviations and Acronyms is a consolidated listing for all the Annexes. Summary information to the current version of the Annex materials follow.

Annex A: IC ITE Services and Providers This Annex provides a brief introduction to IC ITE services, with links to sources of further information.

https://ngaonline/sites/CIO-T/CLOUD/DigiT/Key%20Documents/NGA%20Cloud%20Transition%20Waiver%20Request_v1.0.docx https://tracking.appdev.proj.coe.ic.gov/projects/cloud-engineering-panel https://intelshare.intelink.ic.gov/sites/nga-cloud/SiteAssets/Forms/AllItems.aspx?RootFolder=%2Fsites%2Fnga%2Dcloud%2FSiteAssets%2FSitePages%2FGuidance%2FNGA%20Cloud%20Guidance%20v5%2E2&FolderCTID=0x01200050AA8AD868044C4BA65D50E4B1484A33

Annex B: GEOINT Services Designation The DNI on 4 December 2014 designated NGA as a provider of a “Service of Common Concern” for common GEOINT services on behalf of the Intelligence Community. This Annex provides a copy of the designation memorandum.

Annex C: Deleted Cloud Adoption Management Group (CAMG) Charter deleted.

Annex D: Enterprise Services Guidance Enterprise Services consist of services within two broad categories: mandatory and optional as listed in the NGA Cloud Enterprise Services Catalog which is outlined in the Annex. The catalog is updated regularly with additional service offerings. Activity owners are encouraged to check for updates.

Annex E: Lifecycle Guidance This Annex describes NGA’s lifecycle processes as it relates to the DevOps process. The annex provides guidance for a Software Development Lifecycle centered on the principles of Culture, Automation, Measurement and Sharing (CAMS). It is important to note that Lifecycle is independent of Design Pattern, meaning that the successful employment of a software development approach such as that described by DevOps does not rely on use of a particular design pattern.

Annex F: Design and Implementation Patterns Guidance This Annex is to introduce design patterns for all activities to follow within the cloud. Detailed information on each individual pattern evolves as best practices emerge and lessons learned are shared from experiences gained. This Annex provides a basic understanding of design patterns, with detailed information provided in supplementary materials relevant to a particular activity’s needs.

A design pattern is a generalized approach to solving activity deployment use cases. As implementation progresses the design patterns will be augmented with detailed artifacts enabling repeatable implementation.

Enterprise services and maturity of some platform services are required to meet the intent of the design patterns. The Annex describes available enterprise and platform services for making informed decisions regarding pattern selection.

Annex G: Cloud Data Guidance This Annex contains both prescriptive and recommended data architecture considerations for an activity’s cloud implementation. Activity owners will need to be particularly familiar with the content migration approval process. Classes of data, including that which constitutes mission data and that which is specific only to an application’s use is defined.

http://ndegsnarwvapp02.titanium.rttitanium.nima.ic.gov/ibmcognos/cgi-bin/cognosisapi.dll?b_action=cognosViewer&ui.action=run&ui.object=%2fcontent%2ffolder%5b%40name%3d%27NEAR%27%5d%2ffolder%5b%40name%3d%27Domains%27%5d%2ffolder%5b%40name%3d%27ESC%27%5d%2freport%5b%40name%3d%27ESC%20Cloud%20Services%27%5d&ui.name=ESC%20Cloud%20Services&run.outputFormat=PDF&run.prompt=true

Annex H: Reserved for future use

Annex I: Cloud Security Guidance This Annex provides activity owners with the major tenets of security in the cloud, with impacts to the enterprise architecture, cloud security service offerings, and inheritable Risk Management Framework (RMF) controls, and IC compliance standards. The guidance addresses key security requirements and offers recommended best practices and defines the security architecture, tools, and processes required to achieve success.

Annex J: Cloud Architecture Guidance This Annex provides developers with an overview of NGA’s architecture approach with respect to operating to the cloud. In addition, this document provides sufficient context to interpret NGA cloud architecture artifacts. All of the artifacts are identified to provide insight into adopting cloud solutions to support NGA missions. The tables within the Annex present a summary of architecture deliverables with a brief explanation of their benefit.

Annex K: Business Models Guidance This Annex provides guidance on key NGA and IC business practices and processes managing resources in support of cloud-based operations. Specific IT cloud practices that include:

• Financial planning

• Cloud provisioning

• Cloud cost management

• Software licensing scenarios

• Acquisition considerations

The Annex overviews standard business processes that enable optimized use of cloud-based resources.

Appendix A - Glossary of Abbreviations and Acronyms

Acronym Description

A&A Assessment and Authorization

A2SI Agency Agility Strategic Initiative

AAS Authoritative Attribute Stores

ABAC Attribute Based Access Control

ACAS Assured Compliance Assessment Solution

ACC Advanced Campaign Cell

ACL Access Control List

ADDE Aeronautical Digital Data Environment

ADE Architecture Design Element

ADV Application Development Services

AF9 Air Force Form 9

AIT Active Information Technology

AMI Amazon Machine Image

AMS Aeronautical Migration System

AoA Analysis of Alternatives

AOE Aeronautical Obstruction Environment

API Application Programming Interface

AR Architecture Repository

ARH Access Rights and Handling

ART Agile Release Train

ASGB Application Services Governance Board

ASP Application Service Provider

ATLAS Advanced, Technical, Leadership, Analytics Suite

ATO Approval To Operate

ATP Authorization To Proceed

AuthN Authentication

AuthZ Authorization

AWS Amazon Web Services

AZ Availability Zone

BIOS Basic Input / Output System

BLOB Binary Large Object

BOE Body of Evidence

BYOL Bring Your Own License

C&A Certification and Accreditation

C2S Commercial Cloud Services

CAC Computer Access Card

CAMS Culture, Automation, Measurement and Sharing

CAP Cloud Access Point

CAST Categorization and Selection TEM

CAT Cloud Adoption Template

CCP Common Control Provider

CD Continuous Delivery

CDO Chief Data Officer

CFM Chargeback Financial Model

CI Continuous Integration

CI/CD Continuous Integration / Continuous Deployment

CIO Chief Information Officer

CLIN Contractor Line Item Number

CONOPS Concept of Operations

COTS Commercial-Off-The-Shelf

CND Computer Network Defense

CNDSP Computer Network Defense Service Provider

CRQ Change Request

CSOC Cyber Security Operations Center

CSP Cloud Service Provider

CUI Controlled Unclassified Information

DAFIF Digital Aeronautical Flight Information File

DAO Delegated Authorizing Official

DAR Data at Rest

DAST Dynamic Application Security Testing

DCOS Data Center Operating System

DDR Deactivation and Disposal Review

DevOps Development Operations

DISA Defense Intelligence Security Agency

DIT Data in Transit

DNC Digital Nautical Chart

DNI Director of National Intelligence

DoD Department of Defense

DoDAF DoD Architecture Framework

DOS Denial of Service

DR Disaster Recovery

DSA Data Services Architecture

DSP Data Service Provider

E2C Elastic Compute Cloud

EA Enterprise Audit

EBS Elastic Block Storage

EC2 Elastic Compute Cloud

ECDS Enterprise Cross Domain Service

ECM Enterprise Competency Model

EDH Enterprise Data Header

ELA Enterprise License Agreement

ELB Elastic Load Balancer

EM Entitlements Management

ERB Engineering Review Board

ESE&I Enterprise Systems Engineering & Integration

ESL Enterprise Services List

ETL Extract, Transform and Load

FedRAMP Federal Risk and Authorization Management Program

FISMA Federal Information Security Management Act

FM Financial Management

FOC Final Operational Capability

FOCI Foreign Owned Controlled & Influenced

FOSS Free or Open Source Software

FTE Full Time Equivalent

FYDP Future Years Defense Program

GEA GEOINT Enterprise Architecture

GEOAxIS GEOINT Access and Information Sharing

GEOINT Geospatial Intelligence

GOTS Government of the Shelf

GPOC Government Point of Contact

GS GEOINT Services

GSR General Service Requirements

GUI Graphical User Interface

GUIDE Global Unique IDentifier for Everything

HIPAA Health Insurance Portability and Accountability Act

IAA Identity, Authentication and Authorization

IaaS Infrastructure-as-a-Service

IAE Integrated Analytic Environment

IAM Identity and Access Management, or Identity Access Manager

IARC Information Assurance Reference Catalog

IAST Interactive Application Security Testing

IATO Initial Authorization to Operate

IAW In Accordance With

IC Intelligence Community

ICD Intelligence Community Directive

IC GovCloud Intelligence Community Government Cloud

IC ISM Intelligence Community Information Security Marking

IC ITE Intelligence Community Information Technology Enterprise

ICMP IC Marketplace

IC PAG IC Program Architecture Guide

ICS Intelligence Community Standard

IdAM Identity Access Management

IEM Infrastructure Event Management

IGCE Independent Government Cost Estimate

IIL Information Impact Level

IOC Initial Operational Capability

IP Internet Protocol

IPPBES Intelligence Planning, Programming, Budgeting and Execution System

IS Information Systems

ISM Information Security Marking

ISO International Standards Organization

ISP Infrastructure Service Provider

IT Information Technology

ITAR International Traffic in Arms Regulations

ITIL Information Technology Infrastructure Library

MIB Mission Integration Board

J&A Justification & Approval

JARM Joint Architecture Reference Framework

JIE Joint Information Environment

JSF Joint StoreFront

JWICS Joint Worldwide Intelligence Communications System

KMS Key Management Service

LCD Lowest Common Denominator

LDAP Lightweight Directory Access Protocol

MASH MachineShop

MUG Mission Users Group

MVP Minimum Viable Product/Process

NACL Network Access Control List

NARA National Archives and Records Administration

NAT Network Address Translation

NCE NGA Campus-East

NCW NGA Campus West

NDAAS NSG Data Analytic Architecture Service

NIST National Institute of Science and Technology

NGA National Geospatial-Intelligence Agency

NMF NSG Metadata Foundation

NPE Non-Person Entities

NSA National Security Agency

NSG National System for Geospatial Intelligence

NSS National Security System

NTK Need to Know

OCONUS Outside the Contiguous United States

ODNI Office of the Director of National Intelligence

ODS OpenDataStore

OPR Office of Primary Responsibility

OS Operating System

PaaS Platform-as-a-Service

PBR Program Budget Review

PCF Pivotal Cloud Foundry

PDP Policy Decision Point

PE Person Entities

PEP Policy Enforcement Point

PHI Personal Health Information

PII Personal Identifying Information

PKI Public Key Infrastructure

PfM Portfolio Manager

PM Program Manager

PMI Project Management Institute

PMO Program Management Office

POC Point of Contact

POM Program Objective Memorandum

PoR Program of Record

PUM Proper Use Memorandum

RBAC Role-Based Access Control

RDP Remote Desktop Protocol

RDS Relational Database Services

REvAMP Risk Evaluation Acceleration Management Process

RMF Risk Management Framework

ROI Return on Investment

S3 Simple Storage Service

SA System Administrator

SaaS Software-as-a-Service

SAFe Scaled Agile Framework

SAM Software Asset Management

SAP Special Access Program

SAST Static Application Security Testing

SC2S Secret Commercial Cloud Service

SCA Security Control Assessment

SCI Sensitive Compartmented Information

SCTM Security Controls Traceability Matrix

SFA Foundation GEOINT Aeronautical Navigation Office

SGID Set owner Group ID

SIDR Security Impact Decision Request

SIN Special Item Number

SME Subject Matter Expert

SOP Standard Operational Procedure

SOW Statement of Work

SRB Service Registry Board

SPID Security Plan Identification Number

SSE Server-side Encryption

SSH Secure Shell

SSL Secure Socket Layer

SSP System Security Plan

STIG Security Technical Implementation Guidance

STS Secure Token Service

SUID Set owner User ID

SWAP Software Assurance Process

SWID Software ID

T&Cs Terms and Conditions

TDF Trusted Data Format

TDO Trusted Data Object

TDS Topographic Data Store

TEM Technical Exchange Meeting

TFDM Topographic Features Data Management

TLS Transport Layer Security

TMS Target Management System

TST Technical Services Taxonomy

UC2S Unclassified Commercial Cloud Service

UDS Unified Data Strategy

UFR Unfunded Requirement

ULA Unlimited License Agreement

URL Uniform Resource Locators

UUID Universally Unique Identifier

UX User Experience

VANDL Visualization Analytics Data Lake

VM Virtual Machine

VPC Virtual Private Cloud

VPN Virtual Private Network

WebDVOF Web Digital Vertical Obstruction File

WFS-T Transactional Web Feature Service

XML eXtensible Markup Language

File details come from the government source that posted it. Updated .