This document outlines requirements for base realignment and closure environmental construction and optimization services for the Northeast Region. Key requirements include operation and maintenance of soil vapor extraction systems, groundwater monitoring and treatment, five-year review preparation, land use control management, and public meeting support. The contractor will also perform quarterly inspections and maintenance for whole-home water treatment systems addressing PFOS/PFOA contamination and provide potable water for affected residences in the event of system failures. Work is required at the former Plattsburgh Air Force Base and includes coordinating site access, complying with surface water discharge permits, and responding to public inquiries about development activities near base properties.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
FA8903-20-R-0011 TO 2
Attachment 2 Northeast Region - Plattsburgh 5 December 2019
1.1 Scope
The former Plattsburgh AFB was listed on the National Priorities List (NPL) in 1989 and has a Federal Facility Agreement (FFA) that was signed in 1991. Records of Decision (RODs) have been signed for all Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites included in this PBR TO except for sites where a change in remedy may create a need for a modified decision document.
The ROD for FT002/Industrial Area Groundwater OU, was completed in September 2014. Continued O&M of Soil Vapor Extraction (SVE) systems at one building (Bldg 2753) is required, the systems at the other two buildings (New Building C and Bldg. 2766) will remain deactivated until they meet requirements for removal and require annual monitoring as noted in the site list or require reactivation. The Groundwater OU treatment plant has been deactivated and approved for decommissioning/demolition. O&M of three passive groundwater collection trenches and aeration system will continue as part of the FT002/Industrial Area Groundwater OU Remedy.
All property at former Plattsburgh AFB has been transferred. The most recent Five-Year Review was finalized in February 2015 with the next one scheduled for completion in 2019.
In addition to the requirements presented in this PWS, this scope includes the following:
· The contractor shall be responsible for preventing/mitigating adverse flooding impacts on Air Force environmental monitoring and remediation systems as a result of beaver activity. The contractor will be responsible for removal of beavers and dams if necessary, and coordination/permitting with the property owner and local/state/federal agencies.
· Comprehensive annual inspection and inventory of all existing wells (including monitoring wells installed for PFAS Investigation or other activities) including an annual well inventory/maintenance report, review/update of locational/survey data, field verification of existing wells, and resolution of any discrepancies in existing/prior reporting. Includes replacement of any lock, keys, caps or other appurtenances and repair of any wells (including LF vents, etc.) that are deteriorated from wear and tear, weather, or damaged.
· State Required Electronic Data Deliverable (EDD): submitted IAW requirements outlined in Environmental Information Management System (EIMS) database software application EQuISTM from EarthSoft® Inc. for data submissions to manage environmental data, NYSDEC, Pursuant to 6 NYCRR 375-1.11(a).
· Contractor shall perform quarterly inspections and maintenance of whole-home water treatment systems designed to treat PFOS/PFOA in drinking water including carbon recycling and replacement and quarterly sampling/reporting. Current applicable parameters include:
a. Biennial (every 2 years) regular carbon recycling and replacement for 1 system (a 3, 3-cubic foot vessel system)
b. Biannual (every six months) replacement of whole house particulate filters
c. Quarterly collection of 4 primary system samples (well head, GAC1, GAC2, and post treatment at the faucet or other point of distribution) plus QC samples including DUPs/MS/MSD and field blanks utilizing appropriate specialized PFC sampling protocols to avoid cross contamination and in accordance with applicable AF policy and other requirements
· Provision of potable water for 1 month for the 1 private residence with treatment unit, in the event of system failure (i.e. bottled water, gallon jugs, etc.). Current applicable parameters include:
a. Adequate drinking water intake is approximately 4 liters or 1 gal. per person per day (reference Mayo Clinic recommendations at: http://www.mayoclinic.org/healthy-living/nutrition-and-healthy-eating/in-depth/water/art-20044256).
b. Cooking requirements per household per day is 15 liters or approximately 4 gallons.
c. Average household of 2 persons.
Contractors are not responsible for the following:
· Investigation and remediation of PFAS, except as noted in Attachment 1.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| AR Number |
| Date Issued |
| 1. |
| New York State Department of Environmental Conservation (NYSDEC) DER-10, Technical Guidance for site Investigation and Remediation |
| - |
| May 2010 |
| 2. |
| NYSDEC CP-43, Groundwater Monitoring Well Decommissioning Policy |
| - |
| November 2009 |
| 3. |
| NYSDEC CP-51, soil Clean-Up Guidance |
| - |
| October 2010 |
| 4. |
| New York State Department of Health Guidance for Evaluating Soil Vapor Intrusion in the State of New York, |
| - |
| October 2006, May 2017 update |
| 5. |
| Guidance on sampling for Emerging Contaminants, NYSDEC |
| - |
| July 2018 |
| 6. |
| Environmental Information Management System (EIMS) database software application EQuISTM from EarthSoft® Inc. for data submissions to manage environmental data, NYSDEC, Pursuant to 6 NYCRR 375-1.11(a) |
| - |
| N/A |
| 7. |
| Emergency Adoption and Proposed Rule: 6 NYCRR Part 597, Hazardous Substances Identification, Release Prohibition, and Release Reporting to classify PFOS and PFOA as hazardous substances |
| - |
| April 25, 2016 w/ 2nd re-adoption in Sept 2016 |
| 8. |
| OSWER Tech Guidance for Assessing and Mitigating Vapor Intrusion Pathway, 9200.2-15 |
| - |
| June 2015 w/ |
June 2017 update
| 9. |
| 6 NYCRR Part 703 Surface Water and Groundwater Quality Standards and GW effluent limitations |
| - |
| n/a |
| 10. |
| 6 NYCRR Part 703.5 & .6 (TOGS 111), Ambient Water Quality Standards and GW effluent limitations (10/93 w/ 6/98 update), for use where there are no standards/limitations |
| - |
| Oct 1993 w/ |
June 1998 update
| 11. |
| Recommended Streamlined Site Close Out and NPL Deletion Process for DoD Facilities, DoD/EPA Joint Guidance |
| - |
| Jan 19, 2006 |
| 12. |
| Close Out Procedures for National Priorities List Sites, OWSER Directive 9320.2-22, |
| - |
| May 2011 (ref. Jan 2006 memo for DoD facilities) |
| 13. |
| Updated Scientific Considerations for Lead in Soil Cleanups, OLEM Directive 9200.2-167 |
| - |
| Dec 22, 2016 |
| 14. |
| Air Force Instruction (AFI) 32-7020, Environmental Restoration Program |
| - |
| 18 April 2016 |
| 15. |
| Final Record of Decision (ROD) for FT002/Industrial Area Groundwater Operable Unit |
| 421552 |
| Sept 2014 |
| 16. |
| Munitions Maintenance Squadron (SS-013)Record of Decision |
| 228617 |
| Sept 2008 |
| 17. |
| Fire Training Area (FT002)/Industrial Area Groundwater Operable Unit, Final Supplement to the January 2002 Final Proposed Plan |
| 2605 |
| August 2013 |
| 18. |
| Closure Report for Investigation and/or Remediation of Miscellaneous EBS Factors-Solid/Hazardous Waste Sites, Petroleum Site, and PCB Sites, Versar |
| 456086 |
| February 2005 |
| 19. |
| Closure Report for Excavation of Solid waste Debris Landfills C&D: OTH-3505-1 and Stump Dump: OTH-3505-2, Versar |
| 459777 |
| January 2003 |
| 20. |
| Revised Supplemental Closure Report for the Washrack Area, Versar |
| 2233 |
| January 2008 |
| 21. |
| SS-018/028 Remedial Action Completion Report |
| 2490 |
| January 2012 |
| 22. |
| LF-023 Monitoring Program Memorandum |
| 2597 |
| 3 April 2013 |
| 23. |
| Building 2753 Sub-Slab Venting System Construction Plan, Shaw |
| 2375 |
| June 2009 |
| 24. |
| Building 2766 Soil Vapor Extraction System Design Document, Shaw |
| 2450 |
| November 2010 |
| 25. |
| New Building C (141 Idaho Ave.) Soil Vapor Extraction System Design Document, Shaw |
| 2428 |
| November 2010 |
| 26. |
| Final In-Situ Chemical Oxidation Work Plan, RW042 - Wash Rack Area of Concern, Former Plattsburgh Air Force Base |
| 547800 |
| Feb 2017 |
| 27. |
| Final Closure Report For Removal Actions At The Wash Rack (Area 2891) and Building 2890 (Nose Dock 8) |
| 301131 |
| Sept 2001 |
| 28. |
| Basewide UFP QAPP |
| 581127, 581134 |
| Nov 2017 |
| 29. |
| Revised Final QAPP Addendum 1, Residential PFAS Sampling, Former Plattsburgh AFB, NY |
| Google Site |
| April 2019 |
| 30. |
| Final Corrective Action Plan, Site SS031 - Former Central Heat Plant |
| 576537 |
| Aug 2018 |
| 31. |
| Optimization Plan-FT002 Industrial Area Groundwater Operable Unit |
| 569035 |
| Dec 2017 |
| 32. |
| Soil Vapor Sampling Work Plan SS028 - Building 508 Open Storage Area, Former Plattsburgh AFB |
| 550450 |
| April 2017 |
| 33. |
| Final Soil Vapor Extraction Pilot Test Work Plan- Site SS028- Building 508 Open Storage Area, Former Plattsburgh Air Force Base, Plattsburgh, NY |
| 581106 |
| Dec 2018 |
| 34. |
| Final Soil and Groundwater Sampling Work Plan, Site SS031 - Former Central Heat Plant Former Plattsburgh Air Force Base (AFB), New York |
| 545396 |
| Jan 2017 |
| 35. |
| Final Corrective Action Plan UST-2009, UST-2704, and UST-3580, Former Plattsburgh Air Force Base |
| 542939 |
| Dec 2016 |
| 36. |
| Discharge Permit Equivalent Renewal |
| 569434 |
| Jan 2018 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| GSA Order GS10F0312K, FA8903-16-F-0012 |
| Environmental Remediation at BRAC Eastern Region Bases including Griffiss, Plattsburgh, Myrtle Beach and England AFBs, Bhate Environmental Associates, Inc., awarded 8 June 2016 |
| 15 June 2021 |
| 15 June 2021 |
2.6.1 Meeting/Teleconference Support
· Bi-weekly internal contract status teleconferences are held prior to engaging with the regulators to update the technical team on site remedial status and coordinate document review efforts.
· Monthly BRAC Clean-up Team (BCT) teleconferences are held to update regulators on site status and coordinate document review efforts.
· Semiannual face-to-face BCT meeting are usually conducted in the 2nd and 4th Quarter of each year (June and December).
2.6.2 Public Meetings and Hearings
· Annual RAB meetings are held in the 4th Quarter of each year (usually align with the second semiannual face-to-face BCT meetings). RAB frequency may increased to semi-annually or RAB adjournment may occur within the next year or two depending on coordination with stakeholders. This adjournment process requires additional support including public notice and court reporter activities.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· The contractor shall coordinate with the county airport to obtain access to the flightline area in order to facilitate inspection of sites and any site work within the boundaries of the airfield.
· The contractor shall support/perform screening and response to requests for information from the public and other stakeholders related to development activities on and surrounding former base property including verification of LUC, review of plans in relation to existing restrictions, etc.
· The FT002 remedy is subject to surface water Discharge Permit Equivalent which is administered by the NYSDEC. The current FT002 Discharge Equivalent expires May 31, 2022. Sampling for PFCs as part of discharge monitoring and reporting will be required if PFCs are added to the list of analytes by the regulators upon renewal of the permit. The contractor shall comply with the requirements of the discharge permit equivalent and will be responsible for submission of the discharge criteria renewal request as necessary within the PoP of the Contract.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· Produce environmental property condition maps such as land-use controls, tables, and other graphics, which shall depict environmental conditions at the base.
· GIS will incorporate information gathered from field surveys, records searches, computer-aided design (CAD) files and base drawings, chemistry and geology data, information from interviews, historical photos, Environmental Baseline Survey (EBS) and Environmental Impact Statement (EIS) data, and property transfer information including parcel boundaries, deeds, and environmental disclosure documents.
· Mapping (including provision of printed and electronic maps to the AF) and applicable surveys, GIS and map plotting support necessary to accomplish ad hoc real estate transactions including removal/application of environmental restrictions on applicable parcels/deeds. This includes all items included in the environmental baseline survey (EBS) and associated updates and management and development of restricted areas using GIS.
· Support management of LUC mapping and attribute data including definition of LUC boundaries as the LUC/IC management is expanded.
6.14 Land Use Controls (LUC)
· The contractor shall support/perform screening and response to requests information from the public and other stakeholders related to development activities on and surrounding former base property including verification of LUC, review of plans in relation to existing restrictions, etc.
· The Contractor shall obtain and provide copies to the Air Force of annual reporting required by state covenants for applicable sites by respective property owners including self-certification forms for LUC compliance from all property owners associated with LUC at former Plattsburgh AFB.
· Provide supporting information and technical support to the Air Force for property owner requests to remove restrictive covenants.
6.15 Five-Year Reviews
· Preparation of the statutory Five-Year Review by September 2022 (to be initiated in 2021 with draft submitted by May 2022). CERCLA sites that have not reached UU/UE are to be included in a statutory 5 year review. A second Five-Year Review will be required in 2027 with initiation date in 2026. Non-CERCLA Five-Year Reviews (aka AF Policy Review) is required at non-CERCLA sites per AF policy. Organization of the documentation associated with these sites will be dependent on regulatory and AF inputs.
· Implementation of the 2019 Five-Year Review recommendations (expected to be finalized by early 2020) and recommendations from subsequent five-year reviews.
File details come from the government source that posted it. Updated .