About this file

This document contains a federal wage determination and information about a related federal contract opportunity. The wage determination provides prevailing wage rates for heavy construction projects in Aroostook County, Maine. Covered classifications include carpenters, electricians, ironworkers, laborers, equipment operators, and truck drivers. The determination also notes minimum wage requirements under Executive Order 13658.

The related solicitation seeks proposals for Base Realignment and Closure environmental construction and optimization services in the Northeast region. The solicitation number is FA890320R0011 and it is being issued by the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency. Proposals are due based on the dates specified in the solicitation attachments.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region, newest first.
File Type Posted
04162020_Northeast TO2 Price Model Amendment 1.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00110001 SF 30.pdf PDF
20200416_FA890320R0011_BECOS_Northeast_Section_M Amendment 1.docx DOCX document
04162020_FA8903_20_R_0011 Northeast RFP Questions and Answers.xlsx XLSX spreadsheet
20200416_FA890320R0011_BECOS_Northeast_Section_L Amendment 1.docx DOCX document
FA890320R0011 Northeast Amendment Changes.docx DOCX document
NY20190013 11012019 Oneida Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Northeast BECOS vf1.pdf PDF
IDIQ PWS Northeast BECOS vf4.docx DOCX document
20200122_Northeast FFP FBLR Tables.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190006 08092019 Clinton Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_PPQ v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Northeast BECOS vf1.pdf PDF
NY20190056 10252019 Clinton Building.pdf PDF
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Platts Base Spec Req Northeast BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Pease Base Spec Req Northeast BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190014 09272019 Oneida Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ PWS Attch 2 Northeast Acr and Def BECOS vf3.docx DOCX document
TO 2 PWS Attch 1 Northeast Base Site List BECOS vf7.xlsx XLSX spreadsheet
ME20190006 06142019 Aroostook Building.pdf PDF
20200109_Northeast TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Northeast BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Loring Base Spec Req Northeast BECOS vf2.docx DOCX document
20200203_FA890320R0011_BECOS_Northeast_Section_L v5.docx DOCX document
TO 2 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
NH20190022 09272019 Rockingham Building.pdf PDF
TO 2 PWS Northeast BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Northeast BECOS vf1.pdf PDF
TO 1 PWS Northeast BECOS vf3.docx DOCX document
NY20190012 11012019 Nassau Building Heavy.pdf PDF
20200131_FA8903-20-R-0011_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Griffiss Base Spec Req Northeast BECOS vf2.docx DOCX document
Solicitation FA890320R0011 Northeast.pdf PDF
20200203_FA890320R0011_Northeast_BECOS_Section_M v4.docx DOCX document
IDIQ PWS Attch 3 Northeast Del Rev Process BECOS vf2.docx DOCX document
IDIQ PWS Attch 1 Northeast Base Site List BECOS vf6.xlsx XLSX spreadsheet
TO 1 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
Northeast IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Northeast BECOS vf1.pdf PDF
NH20190025 06282019 Rockingham Heavy.pdf PDF
IDIQ PWS Attch 4 Northeast Perf Obj Def and Req BECOS vf2.docx DOCX document
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: ME20190020 01/04/2019

Superseded General Decision Number: ME20180096

State: Maine

Construction Type: Heavy

County: Aroostook County in Maine.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject

Page 1 of 7beta.SAM.gov

11/19/2019https://beta.sam.gov/wage-determination/ME20190020/0/document to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019

SUME2014-001 01/30/2017

Rates Fringes

CARPENTER, Includes Form Work....$ 18.07 4.33

ELECTRICIAN......................$ 24.87 8.54

IRONWORKER, STRUCTURAL...........$ 24.95 12.32

LABORER: Common or General......$ 13.57 1.38

LABORER: Pipelayer..............$ 21.17 5.63

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 24.37 5.17

OPERATOR: Bulldozer.............$ 22.91 6.04

OPERATOR: Crane.................$ 22.70 6.40

OPERATOR: Loader................$ 14.62 4.24

TRUCK DRIVER: Dump Truck........$ 16.54 3.39

Page 2 of 7beta.SAM.gov

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical

Page 3 of 7beta.SAM.gov order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which

Page 4 of 7beta.SAM.gov these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

Page 5 of 7beta.SAM.gov a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

Page 6 of 7beta.SAM.gov interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Page 7 of 7beta.SAM.gov

File details come from the government source that posted it. Updated .