About this file

This document contains a past performance questionnaire for a contractor responding to Solicitation Number FA890320R0011 for BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) in the Northeast Region issued by the Department of the Air Force Materiel Command Installation Contracting Agency.

The past performance questionnaire requests information about a contractor's previous contract including the contract number, type, period of performance, location, dollar value, description of work performed, and the contractor's role. It also requests contact information for the customer agency and ratings in several key performance areas such as program management and quality assurance, regulatory interaction and stakeholder coordination, analysis and data management, and any adverse performance issues. Contractors are asked to provide narrative explanations for ratings of marginal or unsatisfactory. This past performance questionnaire is one part of the request for proposals for the BECOS Northeast Region contract.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region, newest first.
File Type Posted
04162020_Northeast TO2 Price Model Amendment 1.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00110001 SF 30.pdf PDF
20200416_FA890320R0011_BECOS_Northeast_Section_M Amendment 1.docx DOCX document
04162020_FA8903_20_R_0011 Northeast RFP Questions and Answers.xlsx XLSX spreadsheet
20200416_FA890320R0011_BECOS_Northeast_Section_L Amendment 1.docx DOCX document
FA890320R0011 Northeast Amendment Changes.docx DOCX document
NY20190013 11012019 Oneida Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Northeast BECOS vf1.pdf PDF
IDIQ PWS Northeast BECOS vf4.docx DOCX document
20200122_Northeast FFP FBLR Tables.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190006 08092019 Clinton Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Northeast BECOS vf1.pdf PDF
NY20190056 10252019 Clinton Building.pdf PDF
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Platts Base Spec Req Northeast BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Pease Base Spec Req Northeast BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190014 09272019 Oneida Heavy.pdf PDF
ME20190020 01042019 Aroostook Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ PWS Attch 2 Northeast Acr and Def BECOS vf3.docx DOCX document
TO 2 PWS Attch 1 Northeast Base Site List BECOS vf7.xlsx XLSX spreadsheet
ME20190006 06142019 Aroostook Building.pdf PDF
20200109_Northeast TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Northeast BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Loring Base Spec Req Northeast BECOS vf2.docx DOCX document
20200203_FA890320R0011_BECOS_Northeast_Section_L v5.docx DOCX document
TO 2 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
NH20190022 09272019 Rockingham Building.pdf PDF
TO 2 PWS Northeast BECOS vf3.docx DOCX document
IDIQ PWS Attch 3 Northeast Del Rev Process BECOS vf2.docx DOCX document
IDIQ PWS Attch 1 Northeast Base Site List BECOS vf6.xlsx XLSX spreadsheet
TO 1 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
Northeast IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Northeast BECOS vf1.pdf PDF
NH20190025 06282019 Rockingham Heavy.pdf PDF
IDIQ PWS Attch 4 Northeast Perf Obj Def and Req BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Northeast BECOS vf1.pdf PDF
TO 1 PWS Northeast BECOS vf3.docx DOCX document
NY20190012 11012019 Nassau Building Heavy.pdf PDF
20200131_FA8903-20-R-0011_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Griffiss Base Spec Req Northeast BECOS vf2.docx DOCX document
Solicitation FA890320R0011 Northeast.pdf PDF
20200203_FA890320R0011_Northeast_BECOS_Section_M v4.docx DOCX document
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-20-R-0011

Northeast Region Past Performance Questionnaire

Past Performance Questionnaire Record Solicitation BECOS

Section 1: Contract Identification A. Contractor (Company/Division):

B. Contractor Cage Code:

C. Contract Specifics:

1. Contract or Task Order Number:

2. Contract Type (e.g. firm-fixed-price, CR, etc):

3. Period of Performance:

4. Geographic Location of work:

5. Contract Dollar Value: $

6. Description/scope of work performed:

7. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor

Section 2: Customer/Agency Identification

A. Customer/Agency name:

B. Primary Point of Contact:

1. Primary Name:

2. Primary Office:

3. Primary Address:

4. Primary Telephone:

C. Other suggested points of contact:

Section 3: Performance Areas:

In the tables below, indicate the rating that most accurately describes the contractor’s performance or situation by placing an “X” in the appropriate block to the right of each question. Provide supporting information in the remarks space provided. Attach additional pages if more space is needed. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U. The performance rating scale is defined as follows:

Code Performance Rating

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this element, performance was not observed, or information was not available. Do not know.

1. Program Management and Quality Assurance The Contractor:

E
VG
S
M
U
N/A

A. Provided documents, technical plans, and reports that were accurate, timely, complete, and demonstrated quality. (did not require excessive revision)

B. Performed site work in compliance with required and applicable regulations. (such as, health and safety, ARARs, environmental, OSHA, state, federal, professional certifications and registrations)

C. Performed record of decision, decision documents, feasibility studies and / or conceptual site models preparation and amendments timely, as required, and IAW regulation.

D. Implemented RCRA processes and / or CERCLA processes IAW regulation and protective of Human Health and the Environment (an "exceptional or very good" represents completion of combined actions / interrelated pieces of the entire the RCRA and / or CERCLA process).

E. Worked with state regulatory processes IAW regulation and protective of Human Health and the Environment.

Narrative/Remarks:

2. Regulatory Interaction and Stakeholder Coordination

E
VG
S
M
U
N/A

A. Worked proactively and collaboratively with the Government and engaged regulatory agencies well in order to achieve goals such as project and / or performance objectives, reduced Life Cycle Costs, modification of remedies and decision documents.

B. Implemented and / or facilitated Community Involvement, addressed challenging stakeholders and / or collaborated with community stakeholders such as public events, meetings and during work related to Site Closeout, Restoration Advisory Boards, and / or additional outreach.

C. Transitioned work well, providing all the required documents (such as, GIS, mapping, records, and plans) to coordinate contract closeout and assist the incoming contractor successfully without major issues.

D. Performed an effort that required work on multiple remediation disciplines with more than (5) five sites on installations or former installations. (able to coordinate work on multiple sites and areas well)

E. Managed environmental restoration activities on property with multiple owners / stakeholders. Such as local redevelopment authorities, private entities, federal agencies and municipalities.

3. Analysis and Data Management

E
VG
S
M
U
N/A

A. Provided reports (such as, work plans and conceptual site models) that demonstrate knowledge and technical acumen in Environmental Remediation and / or Restoration.

B. Applied an innovative approach in order to accelerate site closeout at a site.

C. Exhibited technical acumen in assessing, analyzing, and validating data. (quality data analysis and integrity in sampling data)

D. Designed, installed, operated, maintained, and / or optimized remediation systems, such as, a pump and treat system in a manner that ensures maintenance of the selected remedy.

E. Consistently monitored the current remedy progress and / or tracked site progress issues, communicated progress / metrics, and reported on achievement of cleanup goals and performance objectives. (organized and clear metrics / reporting)

4. Were there any adverse performance issues/problems? If so, how were they resolved? (Please reference questions above by topic area and letter.)

Reports/LettersY/N
Contract Discrepancy Report

Cure Notice

Show Cause Notice

Suspension of Payment

Termination for Convenience/Default

Denial of Claim

Other

Remarks:

Response by:

___________________________________________
Print NameTitle
___________________________________________
SignatureDate

File details come from the government source that posted it. Updated .