About this file

This document contains a federal wage determination and related federal contract opportunity. The wage determination provides prevailing wage rates for heavy and highway construction projects in Oneida County, New York. Job classifications covered include carpenters, electricians, equipment operators, laborers, painters, plumbers, sprinkler fitters, and truck drivers. The wage determination outlines applicable prevailing wage rates and fringe benefits for each classification.

The related federal contract opportunity is a solicitation from the Department of the Air Force Materiel Command for BECOS Northeast Region environmental construction and optimization services. The solicitation seeks proposals for BRAC environmental construction projects in the Northeast region. Details on response due dates, award timing, or pricing terms are not provided in the opportunity description.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region, newest first.
File Type Posted
04162020_Northeast TO2 Price Model Amendment 1.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00110001 SF 30.pdf PDF
20200416_FA890320R0011_BECOS_Northeast_Section_M Amendment 1.docx DOCX document
04162020_FA8903_20_R_0011 Northeast RFP Questions and Answers.xlsx XLSX spreadsheet
20200416_FA890320R0011_BECOS_Northeast_Section_L Amendment 1.docx DOCX document
FA890320R0011 Northeast Amendment Changes.docx DOCX document
NY20190013 11012019 Oneida Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Northeast BECOS vf1.pdf PDF
IDIQ PWS Northeast BECOS vf4.docx DOCX document
20200122_Northeast FFP FBLR Tables.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190006 08092019 Clinton Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_PPQ v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Northeast BECOS vf1.pdf PDF
IDIQ PWS Attch 3 Northeast Del Rev Process BECOS vf2.docx DOCX document
IDIQ PWS Attch 1 Northeast Base Site List BECOS vf6.xlsx XLSX spreadsheet
TO 1 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
Northeast IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Northeast BECOS vf1.pdf PDF
NH20190025 06282019 Rockingham Heavy.pdf PDF
IDIQ PWS Attch 4 Northeast Perf Obj Def and Req BECOS vf2.docx DOCX document
NY20190056 10252019 Clinton Building.pdf PDF
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Platts Base Spec Req Northeast BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Pease Base Spec Req Northeast BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Northeast BECOS vf1.pdf PDF
ME20190020 01042019 Aroostook Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ PWS Attch 2 Northeast Acr and Def BECOS vf3.docx DOCX document
TO 2 PWS Attch 1 Northeast Base Site List BECOS vf7.xlsx XLSX spreadsheet
ME20190006 06142019 Aroostook Building.pdf PDF
20200109_Northeast TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Northeast BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Loring Base Spec Req Northeast BECOS vf2.docx DOCX document
20200203_FA890320R0011_BECOS_Northeast_Section_L v5.docx DOCX document
TO 2 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
NH20190022 09272019 Rockingham Building.pdf PDF
TO 2 PWS Northeast BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Northeast BECOS vf1.pdf PDF
TO 1 PWS Northeast BECOS vf3.docx DOCX document
NY20190012 11012019 Nassau Building Heavy.pdf PDF
20200131_FA8903-20-R-0011_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Griffiss Base Spec Req Northeast BECOS vf2.docx DOCX document
Solicitation FA890320R0011 Northeast.pdf PDF
20200203_FA890320R0011_Northeast_BECOS_Section_M v4.docx DOCX document
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: NY20190014 09/27/2019

Superseded General Decision Number: NY20180014

State: New York

Construction Types: Heavy and Highway

HEAVY & HIGHWAY CONSTRUCTION

County: Oneida County in New York.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the

Page 1 of 17beta.SAM.gov

11/19/2019https://beta.sam.gov/wage-determination/NY20190014/7/document federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 03/01/2019 2 06/14/2019 3 06/21/2019 4 07/12/2019 5 08/09/2019 6 08/16/2019 7 09/27/2019

BRNY0002-009 06/01/2018

UTICA CHAPTER

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 37.23 19.51+a

FOOTNOTE:

a. Paid Holidays: Memorial Day, July the 4th, Labor Day, and Thanksgiving Day (provided the employee is employed one

(1) day before and one (1) day after the holiday).

CARP0277-001 07/01/2019

HEAVY & HIGHWAY CONSTRUCTION

Rates Fringes

Page 2 of 17beta.SAM.gov

Carpenters:

Carpenters, Millwrights, Piledrivers................$ 31.23 22.75

ELEC0043-001 06/01/2019

Rates Fringes

CABLE SPLICER....................$ 42.60 26.19

ELECTRICIAN......................$ 38.75 26.08

ELEC1249-003 05/06/2019

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 27.00 6.75%+24.15 Groundman (Truck Driver)....$ 36.00 6.75%+24.15 Groundman Truck Driver (tractor trailer unit)......$ 36.00 6.75%+24.15 Lineman & Technician........$ 45.00 6.75%+24.15 Mechanic....................$ 36.00 6.75%+24.15

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of

Page 3 of 17beta.SAM.gov the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/06/2019

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 31.23 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Groundman Truck driver.....$ 41.64 6.75%+24.15 Lineman and Technician.....$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Substation:

Cable Splicer..............$ 57.26 6.75%+24.15 Flagman....................$ 31.23 6.75%+24.15 Ground man truck driver....$ 41.64 6.75%+24.15 Groundman digging machine

Page 4 of 17beta.SAM.gov operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Lineman & Technician.......$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 58.71 6.75%+24.15 Flagman....................$ 32.02 6.75%+24.15 Groundman Digging Machine Operator...................$ 48.03 6.75%+24.15 Groundman Truck Driver (tractor-trailer unit).....$ 42.70 6.75%+24.15 Groundman Truck Driver.....$ 42.70 6.75%+24.15 Lineman & Technician.......$ 53.37 6.75%+24.15 Mechanic...................$ 42.70 6.75%+24.15

FOOTNOTE:

Page 5 of 17beta.SAM.gov

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2019

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 32.78 3%+4.93 Groundman..................$ 16.49 3%+4.93 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 31.12 3%+4.93 Tree Trimmer................$ 25.79 3%+9.98+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ENGI0545-002 07/01/2017

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 40.80 25.15+a GROUP 2.....................$ 39.92 25.15+a

Page 6 of 17beta.SAM.gov

GROUP 3.....................$ 36.64 25.15+a GROUP 4.....................$ 44.80 25.15+a GROUP 5.....................$ 43.80 25.15+a GROUP 6.....................$ 42.80 25.15+a GROUP 7.....................$ 42.15 25.15+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader

Page 7 of 17beta.SAM.gov and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, Page 8 of 17beta.SAM.gov ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday.

* IRON0440-001 01/01/2019

REMANINDER OF COUNTY

Rates Fringes

IRONWORKER

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 28.25 25.94

LABO0035-002 07/01/2017

Rates Fringes

Page 9 of 17beta.SAM.gov

LABORER

GROUP 1.....................$ 28.05 23.74+a GROUP 2.....................$ 28.25 23.74+a GROUP 3.....................$ 28.45 23.74+a

GROUP 4.....................$ 28.65 23.74

GROUP 5.....................$ 24.00 20.64+a

FOOTNOTE:

a. Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day and New Year's Day provided the employee must work the day before and the work the day after a holiday to receive holiday pay.

GROUP 1: Laborers, flagman, outboard and handboats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortor Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborers's tools, Installation of bridge drainage; Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw Operator on asphalt paver, Water pump operator (1 1/2"" and single diaphram), Nozzle (aphlat, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and Air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powerman

GROUP 4: Blasterers, form setters, stone and granite curb setters

Page 10 of 17beta.SAM.gov

GROUP 5: Hazardous waste removal

PAIN0004-020 05/01/2019

Rates Fringes

Painters:

Bridges.....................$ 38.50 28.40

PAIN0677-002 05/01/2019

Rates Fringes

GLAZIER..........................$ 24.75 19.59

PLUM0112-005 05/01/2018

Rates Fringes

PLUMBER (Including Steamfitting) Northern Zone...............$ 35.50 27.55

* SFNY0669-001 04/01/2019

Rates Fringes

SPRINKLER FITTER.................$ 36.70 24.94

TEAM0182-001 06/01/1996

Rates Fringes

Truck drivers:

GROUP 1.....................$ 17.37 7.70+a GROUP 2.....................$ 17.42 7.70+a

Page 11 of 17beta.SAM.gov

GROUP 3.....................$ 17.47 7.70+a GROUP 4.....................$ 17.62 7.70+a GROUP 5.....................$ 17.77 7.70+a

FOOTNOTES:

PAID HOLIDAYS: A-New Year's Day, B-Memorial Day, C-Independence Day, D-Labor Day, E-Thanksgiving Day, F-Christmas Day

a. Paid Holidays: Independence Day and Labor Day provided the employee works his scheduled day before and his scheduled day after the holiday and is on the payroll week in which the holiday falls.

TRUCK DRIVERS:

GROUP 1: Pickups, panel trucks, flatboy material truck (straight jobs), single axle dump trucks, dumpsters, receives, greasers, truck tiremen.

GROUP 2: Tandems, batch trucks, mechanics.

GROUP 3: Semi-trailers, low-boy trucks, asphalt distributors trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck.

GROUP 4: Specialized earth moving equipment-euclid type or similar off-highway equipment where not self-loader, and straddle (ross) carrier, self contained concrete unit

GROUP 5: Off-highway tandem back-dump, twin engine equipment and double hitched equipment where not self-loaded.

WELDERS - Receive rate prescribed for craft performing

Page 12 of 17beta.SAM.gov operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), Page 13 of 17beta.SAM.gov a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the

Page 14 of 17beta.SAM.gov wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

Page 15 of 17beta.SAM.gov

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Page 16 of 17beta.SAM.gov

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

Page 17 of 17beta.SAM.gov

File details come from the government source that posted it. Updated .