IDIQ PWS Attch 1 Northeast Base Site List BECOS vf6.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region Federal contract opportunity
Solicitation number
FA890320R0011
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This document contains an attachment to a Request for Proposals for Base Realignment and Closure Environmental Construction and Optimization Services in the Northeast Region. The attachment lists over 100 federal sites in the Northeast requiring long-term operation and maintenance of environmental remediation systems, groundwater monitoring, landfill capping and monitoring, land use control inspections, and five-year reviews. Services are needed at active military bases including Griffiss, Loring, Plattsburgh, and Pease Air National Guard Bases, as well as closed bases. Contaminants of concern include chlorinated solvents, fuels, PCBs, metals, and emerging contaminants like PFAS. The Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency is soliciting proposals due by a specified date to provide environmental remediation services at these bases over the next five to thirty years.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region, newest first.
File Type Posted
04162020_Northeast TO2 Price Model Amendment 1.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00110001 SF 30.pdf PDF
20200416_FA890320R0011_BECOS_Northeast_Section_M Amendment 1.docx DOCX document
04162020_FA8903_20_R_0011 Northeast RFP Questions and Answers.xlsx XLSX spreadsheet
20200416_FA890320R0011_BECOS_Northeast_Section_L Amendment 1.docx DOCX document
FA890320R0011 Northeast Amendment Changes.docx DOCX document
NY20190013 11012019 Oneida Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Northeast BECOS vf1.pdf PDF
IDIQ PWS Northeast BECOS vf4.docx DOCX document
20200122_Northeast FFP FBLR Tables.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190006 08092019 Clinton Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_PPQ v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Northeast BECOS vf1.pdf PDF
TO 1 PWS Northeast BECOS vf3.docx DOCX document
NY20190012 11012019 Nassau Building Heavy.pdf PDF
20200131_FA8903-20-R-0011_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Griffiss Base Spec Req Northeast BECOS vf2.docx DOCX document
Solicitation FA890320R0011 Northeast.pdf PDF
20200203_FA890320R0011_Northeast_BECOS_Section_M v4.docx DOCX document
NY20190056 10252019 Clinton Building.pdf PDF
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Platts Base Spec Req Northeast BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Pease Base Spec Req Northeast BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190014 09272019 Oneida Heavy.pdf PDF
ME20190020 01042019 Aroostook Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ PWS Attch 2 Northeast Acr and Def BECOS vf3.docx DOCX document
TO 2 PWS Attch 1 Northeast Base Site List BECOS vf7.xlsx XLSX spreadsheet
ME20190006 06142019 Aroostook Building.pdf PDF
20200109_Northeast TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Northeast BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Loring Base Spec Req Northeast BECOS vf2.docx DOCX document
20200203_FA890320R0011_BECOS_Northeast_Section_L v5.docx DOCX document
TO 2 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
NH20190022 09272019 Rockingham Building.pdf PDF
TO 2 PWS Northeast BECOS vf3.docx DOCX document
IDIQ PWS Attch 3 Northeast Del Rev Process BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
Northeast IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Northeast BECOS vf1.pdf PDF
NH20190025 06282019 Rockingham Heavy.pdf PDF
IDIQ PWS Attch 4 Northeast Perf Obj Def and Req BECOS vf2.docx DOCX document
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Northeast

RegionBaseSite IDSite NameSite AliasOperable Unit (OU)Regulatory ProgramSite PhaseCurrent RemedyNotesProjected
RC DateProjected

SC Date

NortheastGriffissCG412Flightline OU1 PFC Groundwater PlumePFAS Site
NortheastGriffissDP022Bldg 222N/ACERCLALTMExplanation of Significant Difference (ESD) to document change in site boundary; LUC/IC monitoring and Five-Year Review-Groundwater restriction deletion approved in 2013. -Contamination discovered just outside the boundary of the site in 2017; current use will not accommodate removal; ESD will adjust site boundary to encompass footprint of the bldg.FY01Indefinite
NortheastGriffissFT030Fire Training Area (FPTA)PFAS Site
NortheastGriffissLF001Landfill 1N/ACERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and groundwater, surface water monitoring), LUC/IC monitoring, and Five-Year ReviewPFOS/PFOA detected within the site boundaries.FY04Indefinite
NortheastGriffissLF002Landfill 2 & 3N/ACERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewFY03Indefinite
NortheastGriffissLF003Landfill 7N/ACERCLALTMSoil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewFY03Indefinite
NortheastGriffissLF007Landfill 5N/ACERCLALTMSoil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewFY05Indefinite
NortheastGriffissLF009Landfill 6N/ACERCLALTMEngineered Cap. Landfill LTM (inspection, maintenance, LF gas and ground/surface water and leachate monitoring), LUC/IC monitoring, and Five-Year ReviewPFOS/PFOA detected within the site boundaries.FY01Indefinite
NortheastGriffissSD052-01Apron 2 Chlorinated PlumeCERCLARA-OGW monitoring (MNA), LUC/IC monitoring and Five-Year Review.PFOS/PFOA detected within the site boundaries.FY40FY40
NortheastGriffissSD052-02Bldg 775, Pumphouse 3 - chlorinated plume aka SS038CERCLARA-OGW monitoring, maintain system on standby in operable condition & maintain permit, system decommissioning, LUC/IC monitoring and Five-Year ReviewGW extraction/ discharge system on standby since 2016; injections completed in 2017 w/ injection pilot study completed in 2019.FY26FY26
NortheastGriffissSD052-04Landfill 6 Chlorinated PlumeCERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year Review-Associated with LF009 -Injections completed in 2018. PFOS/PFOA detected within the site boundaries.FY40Indefinite
NortheastGriffissSD052-05Bld 817 Chlorinated PlumeCERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year ReviewInjections completed in 2017.FY40FY40
NortheastGriffissSD052 SVI-02Bldg 775 Site (Bldg 774 & 776) sub-slab vapor mitigationCERCLARA-OO&M of passive sub-slab vapor mitigation system, monitoring, reporting, LUC/IC monitoring and Five-Year Review-Active mitigation system to be maintained in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective.FY26FY26
NortheastGriffissSD052 SVI-1Apron 2 Chlorinated Plume Site (Bldg 785 & 786) sub-slab vapor mitigationCERCLALTMO&M of passive sub-slab vapor mitigation system, monitoring, reporting, LUC/IC monitoring and Five-Year Review-Active mitigation system (projected conversion to passive 2018-2019) to be kept in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective.FY05Indefinite
NortheastGriffissSS008Bldg 112/PCB Dump AreaSouth Side-PCB Trans Leak, Roof (Former SS-19)CERCLALTMLUC/IC monitoring and Five-Year ReviewFY05Indefinite
NortheastGriffissSS017Lot 69 Former Hazardous Waste Storage AreaN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewGroundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending.FY01Indefinite
NortheastGriffissSS025T-9 Storage Area - contaminated soil/groundwaterN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewGroundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending.FY05Indefinite
NortheastGriffissSS033Coal Storage Area - PCB ContaminationN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewIncludes evaluation of AOI 66 in Five-Year Review with LUC/IC monitoring and FYRFY01Indefinite
NortheastGriffissSS044Substation, Electrical Power - PCB SiteN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewFY12Indefinite
NortheastGriffissSS054Bldg 781, Pumphouse - Free Product on Groundwater (NYSDEC Spill #9202658)N/ANYSDEC R6 Corrective Action (Spills) ProgramRA-OO&M of biosparging system, quarterly GW monitoring, LUC/IC Monitoring, Non-CERCLA Five-Year Review (AF Policy Review)Petroleum only site, injections completed in 2017. Preliminary observations from 2018 evaluation of existing biosparging system indicates that system modification or installation of new sparge wells may be required.FY26FY26
NortheastGriffissSS060STW-1300 Bldg 35/36 AOCN/ARCRALTMLUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review)FY00Indefinite
NortheastGriffissSS062AOC 9 Weapons Storage Area Landfill Chlorinated PlumeN/ACERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year Review-Injections completed in 2017 and 2018; SVI restriction remains on the site. -PFOS/PFOA detected within the site boundaries.FY26Indefinite
NortheastLoringCCF001Building 6100 URZ BLDG 6100 Use Restriction ZoneBuilding 6100 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY93Indefinite
NortheastLoringCCF002Building 6200 URZ GLDG 6200 Use Restriction ZoneBuilding 6200 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.FY93Indefinite
NortheastLoringCCF003Building 6700 URZ GLDG 6200 Use Restriction ZoneBuilding 6700 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.FY90Indefinite
NortheastLoringCCG006N. Wherry URZ North Wherry Groundwater Use Restriction ZoneNorth Wherry GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG007S. Wherry URZ South Wherry Groundwater Use Restriction ZoneSouth Wherry GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG008Nose Dock URZ Nose Dock Groundwater Use Restriction ZoneNose Dock GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG009S. Flightline URZ South Flightline Groundwater Use Restriction ZoneSouth Flightline GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG010Alert Area URZ Alert Area Groundwater Use Restriction ZoneAlert Area GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG011DRMO URZ DRMO Groundwater Use Restriction ZoneDRMO GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG012East Base URZ East Base Groundwater Use Restriction ZoneEast Base GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCG408B-52 Crash SitePFAS Site
NortheastLoringCLF004ASB LF Asbestos LandfillAsbestos LandfillMEDEPLTMAnnual cap inspections, mowing, and erosion control as required. LUC inspections. No Five-Year Review required.Inspection included in annual landfill monitoring reportFY99Indefinite
NortheastLoringLF001Landfill 1MEDEPLTMLUC inspections. No Five-Year Review required.LUC inspections onlyFY12Indefinite
NortheastLoringLF002Landfill 2CERCLALTMUnlined RCRA cap with impermeable cover. Annual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews.Monitoring period is 30 years, until 2026FY96Indefinite
NortheastLoringLF020Landfill #3Landfill 3CERCLALTMAnnual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews.Monitoring period is 30 years, until 2029FY99Indefinite
NortheastLoringOT018Fly Ash Disposal SiteFADSMEDEPRA-OAnnual cap inspections, mowing, erosion control as required, LUC inspections. No Five-Year Review required.Inspection included in annual landfill monitoring reportFY96Indefinite
NortheastLoringSD010Flightline Drainage DitchFLDD EBGB13CERCLARA-OOU13-Basewide surface water drainage, monitor concentrations of polychlorinated biphenyls (PCBs) and pesticides in fish tissue, stream sediment, and other biota every five years (2023, 2028). LUC inspections and Five-Year Reviews.PCB impoundments were constructed along the East Branch of Greenlaw Brook. Inspection conducted in 2018 indicated erosion risk.FY98Indefinite
NortheastLoringSS054GMZ #1 Industrial AreaGMZ-112CERCLARA-OGroundwater monitoring and biennial surface water monitoring, LUC inspections and Five-Year ReviewsES/JEBS Plume has a TI waiver that requires a technology evaluation every five years in conjunction with the Five-Year Review
Vapor intrusion ROD signed for OU 12 includes Bldg such as 7330, 7500, 8260FY30Indefinite
NortheastLoringSS054GMZ # 1Industrial AreaPFAS Site
NortheastLoringSS056GMZ # 3 BX Service StationGMZ-312CERCLARA-OGroundwater and surface water monitoring, LUC inspections, and Five-Year Reviews.Recently discovered soil contamination may require delineation and other remedial actions like bioremediation and addn’l gw monitoring.FY30FY30
NortheastLoringSS057GMZ # 4 QuarryGMZ-412CERCLARA-OGroundwater and surface water monitoring, performance monitoring of in-situ enhanced bioremediation, LUC inspections and Five-Year Reviews.Pilot study completed in November 2017 indicated potential for mass reduction via continued injections/ recirculation but the extent of the contamination is a factor. Modification of remedy to be based on pilot study. -TI waiver requires technology evaluation every five years in conjunction with the Five-Year Review.IndefiniteIndefinite
NortheastLoringSS058GMZ # 5 F JetGMZ-5 FJETC12CERCLARA-OGroundwater monitoring, LUC inspections and Five-Year Reviews.FY25FY25
NortheastLoringSS059GMZ # 6 East BaseGMZ-612CERCLARA-OGroundwater and surface water monitoring, LUC inspections and Five-Year Reviews.Elevated manganese in the groundwater; site is located in remote part of base on U.S. Fish and Wildlife Service property.TBDIndefinite
NortheastPeaseAB022Burn Area 1CERCLARA-OGroundwater monitoring, decommissioning of AS/SVE, LUCs and Five-Year ReviewLNAPL discovered along with groundwater divide may drive alternate approach; metals issues.FY27FY27
NortheastPeaseAT008FDTA - 2PFAS Site
NortheastPeaseCG401Airfield PFC PlumePFAS Site
NortheastPeaseDP009Construction Rubble Dump 1 (CRD-1)NHDESLTMAnnual cap inspections, settlement monitoring every 5 yrs, mowing as needed, and erosion control, LUCs and Five-Year ReviewFY95Indefinite
NortheastPeaseDP010Leaded Fuel Tank Sludge AreaCERCLARA-OGroundwater monitoring, LUCs and Five-Year ReviewBenzene rebound attributed to unknown source.FY27FY27
NortheastPeaseDP017CRD-2NHDESLTMAnnual cap inspections, annual mowing, erosion control, and surface water and sediment sampling, LUCs and Five-Year ReviewFY95Indefinite
NortheastPeaseID039Building 227CERCLARA-OSVE; performance monitoring of ISEB; and groundwater monitoring, LUCs and Five-Year ReviewVapor intrusion pathway issue, PRAP/ROD amendment in progress to document SVE installation and will be completed by current contractor. Performance monitoring/system balancing may be required. Additional indoor air patrhway analysis may be needed if building occupiedFY23Indefinite
NortheastPeaseID073Building 234CERCLARA-OGroundwater monitoring, LUCs and Five-Year Review-Established remedy creating reducing conditions that mobilize arsenic. Evaluation of additional remedy not included in this TO. -PFOS/PFOA detected within the site boundaries.FY23FY23
NortheastPeaseLF001Landfill 1NHDESLTMAnnual cap inspections, mowing as needed, erosion control, triennial groundwater monitoring, surface water and sediment sampling , LUCs and Five-Year ReviewFY96Indefinite
NortheastPeaseLF005Landfill 5CERCLALTMAnnual cap inspections, settlement monitoring every 5-yrs, annual mowing, erosion control, triennially groundwater monitoring, surface water and sediment sampling, LUCs and Five-Year ReviewFY08Indefinite
NortheastPeaseLF006Landfill 6CERCLALTMAnnual inspections, triennial groundwater monitoring, and Five-Year ReviewIssues with arsenic due to reducing conditions post LF removal, potentially caused by wetland, geochemical analysis conducted in 2018 to determine if Arsenic issue is not naturally occurring.FY07FY28
NortheastPeaseNot ApplicableZone 2CERCLALTMGroundwater monitoring, LUCs and Five-Year ReviewIncludes former AB037 monitoring requirements; closure of Zone 2 is dependent on closure of individual sites in Zone 2.TBDIndefinite
NortheastPeaseOU11Brooks and DitchesCERCLALTMSurface water and sediment monitoring, LUCs and Five-Year ReviewTBDTBD
NortheastPeaseSS013Bulk Fuel Storage Area (BFSA)NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewPFOS/PFOA detected within the site boundaries.FY30FY30
NortheastPeaseSS016Building 410CERCLALTMConfirmation sampling to validate contamination has been removed, remove LUC/ICs if UU/UE, LUCs and Five-Year ReviewPCB release; acceptable for commeercial/industrial use; sampling could result in UU/UE and SCFY95FY28
NortheastPeaseSS036Building 119CERCLARA-OGroundwater monitoring, LUCs and Five-Year ReviewPFOS/PFOA detected within the site boundariesFY30FY30
NortheastPeaseSS045Old Engine Test Stands (OJETS)CERCLARA-OGroundwater monitoring, LUCs and Five-Year ReviewManganese remains elevated after completion of remedy and residual reducing conditions difficult to overcome.FY27FY27
NortheastPeaseSS049Building 22CERCLARA-OMNA with PRB monitoring; performance monitoring of ISEB, groundwater monitoring, LUCs and Five-Year ReviewPotential upgradient source (DNAPL in fractured bedrock), four new wells installed to delineate and possibly treat hot-spot in 2019.FY48FY48
NortheastPeaseSS082Plume 13/14NHDESRA-OGroundwater monitoring, LUCs and Five-Year Review-Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. Evaluation of methane not included in this TO. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundariesFY25FY25
NortheastPeaseSS083Plume 41NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewPotential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundariesFY25FY25
NortheastPeaseSS084Pumphouse 2NHDESRA-OGroundwater monitoring, LUCs and Five-Year Review-Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundariesFY27FY27
NortheastPeaseST072Motor PoolNHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewSite will attain RC for POL contaminants, however reducing conditions remain and arsenic has not achieved cleanup level. New groundwater management zone to be established by current contractorFY30FY30
NortheastPeaseST081Self-Help ShopNHDESRA-OGroundwater monitoring and rebound monitoring, LUCs and Five-Year ReviewMay achieve RC prior to end of 2020FY23FY23
NortheastPlattsburghCSA283OTH-3210-2D&H NurseryRCRALTMLUC/IC Inspections and Five-Year ReviewDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsFY21Indefinite
NortheastPlattsburghCDA286OTH-1700Area R Trash DumpRCRALTMLUC/IC Inspections and Five-Year ReviewDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsFY21Indefinite
NortheastPlattsburghCG406North Flightline PFC Groundwater PlumePFAS Site
NortheastPlattsburghCG407Southern AirfieldPFAS Site
NortheastPlattsburghCTU234UST-3580Former heating fuel USTNYSDEC R5 Corrective Action (Spills) ProgramRA-OMNA, Groundwater monitoring, LUC/IC inspections and Non-CERCLA Five-Year Review (AF Policy Review)Site closure (SC) is pending on the current PBR TO.FY12FY25
NortheastPlattsburghCTU281UST-2704Former diesel fuel USTNYSDEC R5 Corrective Action (Spills) ProgramLTMLUC/IC Monitoring and Non-CERCLA Five-Year Review (AF Policy Review)Injection completed in 2018. Site closure (SC) is pending on the current PBR TO
may be external issues/ (i.e.abandoned underground fuel pipeline, and two adjacent fuels sites that were closed out pre base closure ~ 1991) impacting siteFY31Indefinite
NortheastPlattsburghCTU-294UST-2009Former fuel oil USTNYSDEC R5 Corrective Action (Spills) ProgramRA-OGroundwater monitoring, LUC/IC inspections, and Non-CERCLA Five-Year Review (AF Policy Review)Soil excavation and mixing completed in 2017. Site closure (SC) is pending on the current PBR TO.FY28FY28
NortheastPlattsburghCWM127OTH-3505-1Construction Debris AreaRCRALTMLUC/IC Inspections and Five-Year ReviewDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsFY21Indefinite
NortheastPlattsburghFT002Fire Training AreaPFAS Site
NortheastPlattsburghFT002/Industrial Area Ground-water OUBasewide Groundwater (Includes Fire Training Area and Industrial Area GW)N/ACERCLARA-OGroundwater monitoring, discharge sampling, LUC/IC monitoring, and Five-Year Review

a) Operation of SVE system (VGAC) at Bldg. 2753 (installed late FY09, deactivated in Feb 2014 and reactivated in Feb 2018) w/ deactivation pending regular review of operational condition/sampling results, and annual sub-slab and indoor air sampling.

b) Annual sub-slab and indoor air sampling at New Building C and Bldg. 2766, SVE systems at these two locations have been deactivated and confirmation sampling is in progress ( may require reactivation if rebound occurs). c) Quarterly monitoring and inspections and maintenance including whole house filter changeout, carbon recycling and replacement/changeout on whole home PFOS/PFOA mitigation systems at one location

d) Ongoing operation and maintenance (O&M), and discharge monitoring and reporting of three passive groundwater collection trenches including cleaning of 10,900 feet of trench and 1,550 ft of discharge piping

e) Ongoing O&M of Aeration pond-Runway/Flightline Collection Trench (RFCT) GW Treatment Plant has been deactivated and approved for decommissioning/demolition which is included in this TO. -PFOS/PFOA detected within the site boundaries.FY84FY84
NortheastPlattsburghLF021Former Landfill (56-59)N/ACERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewFY97Indefinite
NortheastPlattsburghLF022Former Landfill (59-66)(D-3, D-7)CERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewFY95Indefinite
NortheastPlattsburghLF023Former Landfill (66-81)(D-4)CERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas monitoring, and groundwater monitoring including baseline and routine events LUC/IC monitoring, and Five-Year Review.Site is governed by a Source Control Record of Decision and a Groundwater Operable Unit Record of DecisionFY95Indefinite
NortheastPlattsburghLF024Former C & D LandfillN/ACERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewFY97Indefinite
NortheastPlattsburghRW042Wash Rack AOCN/Anon-CERCLA managed as petroleum siteRA-OSemiannual groundwater monitoring, LUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review).-LNAPL discovered at site in 2017; results of investigation under current PBR are expected Jun 2021.
-PFOS/PFOA detected within the site boundaries.TBD
NortheastPlattsburghSS005No-Destructive Inspection (NDI) FacilityN/ACERCLALTMLUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year ReviewFY98Indefinite
NortheastPlattsburghSS006Aerospace Ground Equipment (AGE) FacilityN/ACERCLALTMLUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year ReviewFY98Indefinite
NortheastPlattsburghSS013Munitions Maintenance SquadronN/ACERCLARA-OOzone sparging system operated intermittently through 2014; Soil excavation to remove residual contamination planned in 2018 followed by possible restart of ozone sparge system; groundwater/surface water monitoring, LUC/IC monitoring including general SVI restriction and occupancy restriction for Bldg. 3578, and Five-Year Review.-The SVI restriction is based on calculations and not an actual study. Site closure (SC) under current PBR TO is pending. -PFOS/PFOA detected within The Site boundariesfor GW FY26
NortheastPlattsburghSS018Auto Hobby ShopN/ACERCLALTMLUC/IC monitoring (non-residential use), and Five-Year ReviewFY13Indefinite
NortheastGriffissSS067Building 789 Type II Fuel System (NYSDEC Spill #9810713)N/ANYSDEC R6 Corrective Action (Spills) ProgramRA-OO&M of biosparge and free product recovery systems, Product Guaging and Manual Recovery, GW monitoring, and LUC/IC monitoring, Non-CERCLA Five-Year Review (AF Policy Review)Results of data gap analysis conducted in late 2018 and product guaging expected early 2020.FY26FY26
NortheastGriffissST006Bldg 101N/ACERCLARA-OQuarterly sub-slab SVE system O&M and monitoring; prepare Proposed Plan and ROD amendment for sub-slab SVE; LUC/IC monitoring and Five-Year Review-2012 ROD specified LUC/ICs only, however a subslab SVE system was installed/ activated in 2013 to accelerate clean-up but has been inactive since Sept 2017 -Data gap analysis and optimization conducted by current PBR contractor. Results anticipated 2020.FY12FY26
NortheastLoringSS059GMZ # 6 East BasePFAS Site
NortheastLoringSS062Littleton Pump Station (Searsport Pipeline)POLRA-OGroundwater monitoring, LUC inspections and Five-Year ReviewsPetroleum plume has migrated onto private property.FY29 24FY29
NortheastLoringSS063Mattawamkeag Pump Station (Searsport Pipeline)POLRA-OSemiannual (Spring and Fall) groundwater monitoring, LUC inspections and Five-Year ReviewsLNAPL in the shallow bedrockFY30FY30
NortheastPeaseST085Flightline Refueling System (FLRS)NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewMNA not meeting goals.FY30Indefinite
NortheastPeaseTU032Building 113CERCLARA-ORA-O of isolation unit (sheet pile), performance monitoring, groundwater monitoring, LUCs and Five-Year ReviewPerformance monitoring of new ISEB injections may be requiredFY20Indefinite
NortheastPlattsburghSS028Building 508 Open Storage AreaN/ACERCLALTMLUC/IC (non-residential use) monitoring and Five-Year ReviewSoil investigation/excavation planned. SVI issues may require additional LUC/ICs at the site. Site closure (SC) under current PBR is pending.FY21Indefinite
NortheastPlattsburghSS031Central Heat PlantN/ANYSDEC R5 Corrective Action (Spills) ProgramLTMLUC/IC Monitoring and Non-CERCLA Five-Year Review (AF Policy Review)Petroleum only site; Site closure (SC) under current PBR TO is pending w/ contamination discovered at site boundary near rails; if SC is not achieved, LUC/ICs including SVI restriction may be required.FY21Indefinite
NortheastGriffissCSS681Apron 1 Area, Lateral Control Pit (LCP) E9TBD

FA8903-20-R-0011

Attachment 1 Northeast Region 5 December 2019

&P of &N

File details come from the government source that posted it. Updated .