TO 2 PWS Attch 1 Northeast Base Site List BECOS vf7.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region Federal contract opportunity
Solicitation number
FA890320R0011
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This document provides details on a Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) Northeast Region contract opportunity. The solicitation seeks proposals for environmental remediation and long-term monitoring services at multiple closed and realigned military installations across the Northeast region, including Griffiss Air Force Base, Loring Air Force Base, Pease Air Force Base, Plattsburgh Air Force Base, and other locations. Services required include operation and maintenance of groundwater treatment systems, landfill capping and monitoring, land use control inspections, five-year reviews, and environmental remediation activities such as soil excavation and vapor mitigation systems. The period of performance is one base year with four option years. The Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency will award an Indefinite Delivery Indefinite Quantity (IDIQ) contract with both fixed price and cost reimbursement line items. The solicitation number is FA890320R0011 and proposals are due by the specified response date.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region, newest first.
File Type Posted
04162020_Northeast TO2 Price Model Amendment 1.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00110001 SF 30.pdf PDF
20200416_FA890320R0011_BECOS_Northeast_Section_M Amendment 1.docx DOCX document
04162020_FA8903_20_R_0011 Northeast RFP Questions and Answers.xlsx XLSX spreadsheet
20200416_FA890320R0011_BECOS_Northeast_Section_L Amendment 1.docx DOCX document
FA890320R0011 Northeast Amendment Changes.docx DOCX document
NY20190013 11012019 Oneida Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Northeast BECOS vf1.pdf PDF
IDIQ PWS Northeast BECOS vf4.docx DOCX document
20200122_Northeast FFP FBLR Tables.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190006 08092019 Clinton Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_PPQ v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Northeast BECOS vf1.pdf PDF
TO 1 PWS Northeast BECOS vf3.docx DOCX document
NY20190012 11012019 Nassau Building Heavy.pdf PDF
20200131_FA8903-20-R-0011_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Griffiss Base Spec Req Northeast BECOS vf2.docx DOCX document
Solicitation FA890320R0011 Northeast.pdf PDF
20200203_FA890320R0011_Northeast_BECOS_Section_M v4.docx DOCX document
NY20190056 10252019 Clinton Building.pdf PDF
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Platts Base Spec Req Northeast BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Pease Base Spec Req Northeast BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Northeast BECOS vf1.pdf PDF
NY20190014 09272019 Oneida Heavy.pdf PDF
ME20190020 01042019 Aroostook Heavy.pdf PDF
20200131_FA890320R0011_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ PWS Attch 2 Northeast Acr and Def BECOS vf3.docx DOCX document
ME20190006 06142019 Aroostook Building.pdf PDF
20200109_Northeast TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Northeast BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Loring Base Spec Req Northeast BECOS vf2.docx DOCX document
20200203_FA890320R0011_BECOS_Northeast_Section_L v5.docx DOCX document
TO 2 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
NH20190022 09272019 Rockingham Building.pdf PDF
TO 2 PWS Northeast BECOS vf3.docx DOCX document
IDIQ PWS Attch 3 Northeast Del Rev Process BECOS vf2.docx DOCX document
IDIQ PWS Attch 1 Northeast Base Site List BECOS vf6.xlsx XLSX spreadsheet
TO 1 CDRLs Exhibit A B Northeast BECOS vf1.docx DOCX document
Northeast IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Northeast BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Northeast BECOS vf1.pdf PDF
NH20190025 06282019 Rockingham Heavy.pdf PDF
IDIQ PWS Attch 4 Northeast Perf Obj Def and Req BECOS vf2.docx DOCX document
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Northeast

RegionBaseSite IDSite NameSite AliasOperable Unit (OU)Regulatory ProgramSite PhaseCurrent RemedyType of SystemCurrent Frequency of MonitoringNotesPerformance ObjectiveProjected
RC DateProjected

SC Date Northeast Griffiss SD052 -01 Apron 2 Chlorinated Plume CERCLA RA-O GW monitoring (MNA), LUC/IC monitoring and Five-Year Review. None Annual Sampling/Report Annual Inspections

FYR every five yearsPFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.RA-OFY40FY40
NortheastGriffissSD052-02Bldg 775, Pumphouse 3 - chlorinated plume aka SS038CERCLARA-OGW monitoring, maintain system on standby in operable condition & maintain permit, system decommissioning, LUC/IC monitoring and Five-Year Review1 - P&T (Standby)Annual Sampling/Report

Annual Inspections

FYR every five yearsGW extraction/ discharge system on standby since 2016; injections completed in 2017 w/ injection pilot study completed in 2019.RA-OFY26FY26
NortheastGriffissSD052-04Landfill 6 Chlorinated PlumeCERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year ReviewNoneAnnual Sampling/Report

Annual Inspections

FYR every five years-Associated with LF009 -Injections completed in 2018. PFOS/PFOA detected within the site boundaries. -Investigation and remediation of PFAS is not included in this TO.RA-OFY40Indefinite
NortheastGriffissSD052-05Bld 817 Chlorinated PlumeCERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year ReviewNoneAnnual Sampling/Report

Annual Inspections

FYR every five yearsInjections completed in 2017.RA-OFY40FY40
NortheastGriffissSD052 SVI-02Bldg 775 Site (Bldg 774 & 776) sub-slab vapor mitigationCERCLARA-OO&M of passive sub-slab vapor mitigation system, monitoring, reporting, LUC/IC monitoring and Five-Year Review1 - Vapor Mitigation System on standby, passive system in placeTwice Annual indoor/outdoor air and subslab vapor sampling (heating season)

Annual Report Annual Inspections

FYR every five years-Active mitigation system to be maintained in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective.RA-OFY26FY26
NortheastGriffissST006Bldg 101N/ACERCLARA-OQuarterly sub-slab SVE system O&M and monitoring; prepare Proposed Plan and ROD amendment for sub-slab SVE; LUC/IC monitoring and Five-Year Review1 - Vapor Mitigation System currently inactive pending system evaluationQuarterly Sampling

Annual Report Biweekly O&M (system inactive) Annual Inspections

FYR every five years-2012 ROD specified LUC/ICs only, however a subslab SVE system was installed/ activated in 2013 to accelerate clean-up but has been inactive since Sept 2017 -Data gap analysis and optimization conducted by current PBR contractor. Results anticipated 2020.RA-OFY12FY26
NortheastGriffissSS054Bldg 781, Pumphouse - Free Product on Groundwater (NYSDEC Spill #9202658)N/ANYSDEC R6 Corrective Action (Spills) ProgramRA-OO&M of biosparging system, quarterly GW monitoring, LUC/IC Monitoring, Non-CERCLA Five-Year Review (AF Policy Review)1 - Biosparging SystemBiweekly O&M (system inactive)

Quarterly Sampling Annual Report Annual Inspections

FYR every five yearsPetroleum only site, injections completed in 2017. Preliminary observations from 2018 evaluation of existing biosparging system indicates that system modification or installation of new sparge wells may be required.RA-OFY26FY26
NortheastGriffissSS062AOC 9 Weapons Storage Area Landfill Chlorinated PlumeN/ACERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year ReviewNoneAnnual Sampling/Report

Annual Inspections

FYR every five years-Injections completed in 2017 and 2018; SVI restriction remains on the site. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.RA-OFY26Indefinite
NortheastGriffissSS067Building 789 Type II Fuel System (NYSDEC Spill #9810713)N/ANYSDEC R6 Corrective Action (Spills) ProgramRA-OO&M of biosparge and free product recovery systems, Product Guaging and Manual Recovery, GW monitoring, and LUC/IC monitoring, Non-CERCLA Five-Year Review (AF Policy Review)1 - Biosparging System

1 - Free Product Recovery System Quarterly gw Sampling Annual Report Annual Inspections FYR every five years

FPRS System remains off (quarterly recovery), air sparge system is on off and on standby (requires annual inspection)Results of data gap analysis conducted in late 2018 and product guaging expected early 2020.RA-OFY26FY26
NortheastGriffissLF001Landfill 1N/ACERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and groundwater, surface water monitoring), LUC/IC monitoring, and Five-Year ReviewNoneSemiannual Inspec./report

Annual gas sampling Biennial gw/sw sampling/report

FYR every five yearsPFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.LTMFY04Indefinite
NortheastGriffissLF002Landfill 2 & 3N/ACERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewNoneSemiannual Inspect./report

Annual gas sampling GW/sw sampling every 5 years/report FYR every five years

LTMFY03Indefinite
NortheastGriffissLF003Landfill 7N/ACERCLALTMSoil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewNoneSemiannual Inspect./report

GW/sw sampling every 5 years/report

FYR every five yearsLTMFY03Indefinite
NortheastGriffissLF007Landfill 5N/ACERCLALTMSoil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewNoneSemiannual Inspect./report
GW/sw sampling every 5 years/reportLTMFY05Indefinite
NortheastGriffissLF009Landfill 6N/ACERCLALTMEngineered Cap. Landfill LTM (inspection, maintenance, LF gas and ground/surface water and leachate monitoring), LUC/IC monitoring, and Five-Year ReviewNoneSemiannual Inspect./report

Annual gas sampling SW/leachate sampling every 5 years/report

PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.LTMFY01Indefinite
NortheastGriffissSS008Bldg 112/PCB Dump AreaSouth Side-PCB Trans Leak, Roof (Former SS-19)CERCLALTMLUC/IC monitoring and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsLTMFY05Indefinite
NortheastGriffissSS017Lot 69 Former Hazardous Waste Storage AreaN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsGroundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending.LTMFY01Indefinite
NortheastGriffissSS025T-9 Storage Area - contaminated soil/groundwaterN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsGroundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending.LTMFY05Indefinite
NortheastGriffissDP022Bldg 222N/ACERCLALTMExplanation of Significant Difference (ESD) to document change in site boundary; LUC/IC monitoring and Five-Year ReviewNoneAnnual Inspections
FYR every five years-Groundwater restriction deletion approved in 2013. -Contamination discovered just outside the boundary of the site in 2017; current use will not accommodate removal; ESD will adjust site boundary to encompass footprint of the bldg.LTMFY01Indefinite
NortheastGriffissSS033Coal Storage Area - PCB ContaminationN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsIncludes evaluation of AOI 66 in Five-Year Review with LUC/IC monitoring and FYRLTMFY01Indefinite
NortheastGriffissSS044Substation, Electrical Power - PCB SiteN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsLTMFY12Indefinite
NortheastGriffissSD052 SVI-1Apron 2 Chlorinated Plume Site (Bldg 785 & 786) sub-slab vapor mitigationCERCLALTMO&M of passive sub-slab vapor mitigation system, monitoring, reporting, LUC/IC monitoring and Five-Year Review1 - Vapor Mitigation System on standby, passive system in placeTwice Annual indoor/outdoor air and subslab vapor sampling (heating season)

Annual Report Annual Inspections

FYR every five years-Active mitigation system (projected conversion to passive 2018-2019) to be kept in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective.LTMFY05Indefinite
NortheastGriffissSS060STW-1300 Bldg 35/36 AOCN/ARCRALTMLUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review)NoneAnnual Inspections
FYR every five yearsLTMFY00Indefinite
NortheastLoringSD010Flightline Drainage DitchFLDD EBGB13CERCLARA-OOU13-Basewide surface water drainage, monitor concentrations of polychlorinated biphenyls (PCBs) and pesticides in fish tissue, stream sediment, and other biota every five years (2023, 2028). LUC inspections and Five-Year Reviews.NoneAnnual LUC inspections, fish sampling every five yearsPCB impoundments were constructed along the East Branch of Greenlaw Brook. Inspection conducted in 2018 indicated erosion risk. Design and implementation of additional remedial action is not included in this TO.LTMFY98Indefinite
NortheastLoringSS054GMZ #1 Industrial AreaGMZ-112CERCLARA-OGroundwater monitoring and biennial surface water monitoring, LUC inspections and Five-Year ReviewsNoneAnnualES/JEBS Plume has a TI waiver that requires a technology evaluation every five years in conjunction with the Five-Year ReviewRA-OFY30Indefinite
NortheastLoringSS056GMZ # 3 BX Service StationGMZ-312CERCLARA-OGroundwater and surface water monitoring, LUC inspections, and Five-Year Reviews.NoneAnnualRecently discovered soil contamination that may require delineation and other remedial actions like bioremediation and addn’l gw monitoring not included in this TO.RA-OFY30FY30
NortheastLoringSS057GMZ # 4 QuarryGMZ-412CERCLARA-OGroundwater and surface water monitoring, performance monitoring of in-situ enhanced bioremediation, LUC inspections and Five-Year Reviews.NoneAnnualPilot study completed in November 2017 indicated potential for mass reduction via continued injections/ recirculation but the extent of the contamination is a factor. Modification of remedy based on pilot study is included in this TO. -TI waiver requires technology evaluation every five years in conjunction with the Five-Year Review.RA-OIndefiniteIndefinite
NortheastLoringSS058GMZ # 5 F JetGMZ-5 FJETC12CERCLARA-OGroundwater monitoring, LUC inspections and Five-Year Reviews.NoneAnnualSCFY25FY25
NortheastLoringSS059GMZ # 6 East BaseGMZ-612CERCLARA-OGroundwater and surface water monitoring, LUC inspections and Five-Year Reviews.NoneAnnualElevated manganese in the groundwater; site is located in remote part of base on U.S. Fish and Wildlife Service property. Development of recommendations to address manganese is included in this TO; however, implementation is not included.RA-OTBDIndefinite
NortheastLoringSS062Littleton Pump Station (Searsport Pipeline)POLRA-OGroundwater monitoring, LUC inspections and Five-Year ReviewsNoneAnnualPetroleum plume has migrated onto private property.RCFY29 24FY29
NortheastLoringSS063Mattawamkeag Pump Station (Searsport Pipeline)POLRA-OSemiannual (Spring and Fall) groundwater monitoring, LUC inspections and Five-Year ReviewsNoneAnnualInvestigation and remediation of LNAPL in the shallow bedrock is not included in this TO.RA-OFY30FY30
NortheastLoringCLF004ASB LF Asbestos LandfillAsbestos LandfillMEDEPLTMAnnual cap inspections, mowing, and erosion control as required. LUC inspections. No Five-Year Review required.NoneAnnualInspection included in annual landfill monitoring reportLTMFY99Indefinite
NortheastLoringLF001Landfill 1MEDEPLTMLUC inspections. No Five-Year Review required.NoneAnnualLUC inspections onlyLTMFY12Indefinite
NortheastLoringLF002Landfill 2CERCLALTMUnlined RCRA cap with impermeable cover. Annual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews.NoneAnnualMonitoring period is 30 years, until 2026LTMFY96Indefinite
NortheastLoringLF020Landfill #3Landfill 3CERCLALTMAnnual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews.NoneAnnualMonitoring period is 30 years, until 2029LTMFY99Indefinite
NortheastLoringOT018Fly Ash Disposal SiteFADSMEDEPRA-OAnnual cap inspections, mowing, erosion control as required, LUC inspections. No Five-Year Review required.NoneAnnualInspection included in annual landfill monitoring reportRA-OFY96Indefinite
NortheastLoringCCG006N. Wherry URZ North Wherry Groundwater Use Restriction ZoneNorth Wherry GURZPOLLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspection, sample every five yearsGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY00FY31
NortheastLoringCCG007S. Wherry URZ South Wherry Groundwater Use Restriction ZoneSouth Wherry GURZPOLLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspection, sample every five yearsGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY00FY31
NortheastLoringCCG008Nose Dock URZ Nose Dock Groundwater Use Restriction ZoneNose Dock GURZPOLLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspection, sample every five yearsGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY00FY31
NortheastLoringCCG009S. Flightline URZ South Flightline Groundwater Use Restriction ZoneSouth Flightline GURZPOLLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspection, sample every five yearsGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY00FY31
NortheastLoringCCG010Alert Area URZ Alert Area Groundwater Use Restriction ZoneAlert Area GURZPOLLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspection, sample every five yearsGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY00FY31
NortheastLoringCCG011DRMO URZ DRMO Groundwater Use Restriction ZoneDRMO GURZPOLLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspection, sampler every five yearsGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY00FY31
NortheastLoringCCG012East Base URZ East Base Groundwater Use Restriction ZoneEast Base GURZPOLLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspection, sample every five yearsGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY00FY31
NortheastLoringCCF001Building 6100 URZ BLDG 6100 Use Restriction ZoneBuilding 6100 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspectionGW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.LTMFY93Indefinite
NortheastLoringCCF002Building 6200 URZ GLDG 6200 Use Restriction ZoneBuilding 6200 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspectionLTMFY93Indefinite
NortheastLoringCCF003Building 6700 URZ GLDG 6200 Use Restriction ZoneBuilding 6700 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.NoneAnnual LUC inspectionLTMFY90Indefinite
NortheastPeaseSS013Bulk Fuel Storage Area (BFSA)NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneAnnualPFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TORA-OFY30FY30
NortheastPeaseST081Self-Help ShopNHDESRA-OGroundwater monitoring and rebound monitoring, LUCs and Five-Year ReviewNoneAnnualMay achieve RC prior to end of 2020RA-OFY23FY23
NortheastPeaseSS082Plume 13/14NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneBiennial-Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. Evaluation of methane not included in this TO. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TORA-OFY25FY25
NortheastPeaseSS083Plume 41NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneAnnualPotential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries
Investigation and remediation of PFAS is not included in this TORA-OFY25FY25
NortheastPeaseSS084Pumphouse 2NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneBiennial-Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. Evaluation of methane not included in this TO. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries
Investigation and remediation of PFAS is not included in this TORA-OFY27FY27
NortheastPeaseTU032Building 113CERCLARA-ORA-O of isolation unit (sheet pile), performance monitoring, groundwater monitoring, LUCs and Five-Year ReviewNoneBiennialPerformance monitoring of new ISEB injections may be requiredRA-OFY20Indefinite
NortheastPeaseID039Building 227CERCLARA-OSVE; performance monitoring of ISEB; and groundwater monitoring, LUCs and Five-Year Review1 - SVE SystemBiennialVapor intrusion pathway issue, PRAP/ROD amendment in progress to document SVE installation and will be completed by current contractor. Performance monitoring/system balancing may be required. Additional indoor air patrhway analysis may be needed if building occupiedRA-OFY23Indefinite
NortheastPeaseAB022Burn Area 1CERCLARA-OGroundwater monitoring, decommissioning of AS/SVE, LUCs and Five-Year Review1 - Air Sparge/SVE System (No Longer Required)BiennialLNAPL discovered along with groundwater divide may drive alternate approach; metals issues. Evaluation of additional remedy not included in this TORA-OFY27FY27
NortheastPeaseSS036Building 119CERCLARA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneSemiannualPFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO.RA-OFY30FY30
NortheastPeaseSS049Building 22CERCLARA-OMNA with PRB monitoring; performance monitoring of ISEB, groundwater monitoring, LUCs and Five-Year ReviewNoneAnnualPotential upgradient source (DNAPL in fractured bedrock), four new wells installed to delineate and possibly treat hot-spot in 2019. Evaluation of additional remedy for potential upgradient source not included in this TO, however performance monitoring continuation will be requiredRA-OFY48FY48
NortheastPeaseID073Building 234CERCLARA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneAnnual-Established remedy creating reducing conditions that mobilize arsenic. Evaluation of additional remedy not included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.RA-OFY23FY23
NortheastPeaseDP010Leaded Fuel Tank Sludge AreaCERCLARA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneBiennialBenzene rebound attributed to unknown source. Evaluation of additional remedy not included in this TO.RA-OFY27FY27
NortheastPeaseLF006Landfill 6CERCLALTMAnnual inspections, triennial groundwater monitoring, and Five-Year ReviewNoneTriennialIssues with arsenic due to reducing conditions post LF removal, potentially caused by wetland, geochemical analysis conducted in 2018 to determine if Arsenic issue is not naturally occurring. Evaluation of additional remedy not included in this TO.LTMFY07FY28
NortheastPeaseSS045Old Engine Test Stands (OJETS)CERCLARA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneAnnualManganese remains elevated after completion of remedy and residual reducing conditions difficult to overcome. Evaluation of additional remediation not included in this TORA-OFY27FY27
NortheastPeaseST072Motor PoolNHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneAnnualSite will attain RC for POL contaminants, however reducing conditions remain and arsenic has not achieved cleanup level. New groundwater management zone to be established by current contractorRA-OFY30FY30
NortheastPeaseSS016Building 410CERCLALTMConfirmation sampling to validate contamination has been removed, remove LUC/ICs if UU/UE, LUCs and Five-Year ReviewNoneAnnualPCB release; acceptable for commeercial/industrial use; sampling could result in UU/UE and SCLTMFY95FY28
NortheastPeaseDP009Construction Rubble Dump 1 (CRD-1)NHDESLTMAnnual cap inspections, settlement monitoring every 5 yrs, mowing as needed, and erosion control, LUCs and Five-Year ReviewNoneAnnualLTMFY95Indefinite
NortheastPeaseDP017CRD-2NHDESLTMAnnual cap inspections, annual mowing, erosion control, and surface water and sediment sampling, LUCs and Five-Year ReviewNoneAnnualLTMFY95Indefinite
NortheastPeaseST085Flightline Refueling System (FLRS)NHDESRA-OGroundwater monitoring, LUCs and Five-Year ReviewNoneAnnualMNA not meeting goals. Evaluation of additional remedy not included in this TO.RA-OFY30Indefinite
NortheastPeaseLF005Landfill 5CERCLALTMAnnual cap inspections, settlement monitoring every 5-yrs, annual mowing, erosion control, triennially groundwater monitoring, surface water and sediment sampling, LUCs and Five-Year ReviewNoneAnnual inspections, Triennial GWLTMFY08Indefinite
NortheastPeaseLF001Landfill 1NHDESLTMAnnual cap inspections, mowing as needed, erosion control, triennial groundwater monitoring, surface water and sediment sampling , LUCs and Five-Year ReviewNoneAnnual inspections, Triennial GWLTMFY96Indefinite
NortheastPeaseNot ApplicableZone 2CERCLALTMGroundwater monitoring, LUCs and Five-Year ReviewNoneBiennialIncludes former AB037 monitoring requirements; closure of Zone 2 is dependent on closure of individual sites in Zone 2.LTMTBDIndefinite
NortheastPeaseOU11Brooks and DitchesCERCLALTMSurface water and sediment monitoring, LUCs and Five-Year ReviewNoneNoneLTMTBDTBD
NortheastPlattsburghFT002/Industrial Area Ground-water OUBasewide Groundwater (Includes Fire Training Area and Industrial Area GW)N/ACERCLARA-Oa) Groundwater monitoring, discharge sampling, LUC/IC monitoring, and Five-Year Review

b) Operation of SVE system (VGAC) at Bldg. 2753 (installed late FY09, deactivated in Feb 2014 and reactivated in Feb 2018) w/ deactivation pending regular review of operational condition/sampling results, and annual sub-slab and indoor air sampling.

c) Annual sub-slab and indoor air sampling at New Building C and Bldg. 2766, SVE systems at these two locations have been deactivated and confirmation sampling is in progress ( may require reactivation if rebound occurs). d) Quarterly monitoring and inspections and maintenance including whole house filter changeout, carbon recycling and replacement/changeout on whole home PFOS/PFOA mitigation systems at one location

e) Discharge monitoring and reporting associated with groundwater collection trenches

f) O&M of three passive groundwater collection trenches including cleaning of 10,900 feet of trench and 1,550 ft of discharge piping

g) Ongoing O&M of Aeration pond

3 - Vapor Mitigation Systems (1 Active (B2753); 2 Standby)

1 - Home GAC System

3 - Passive Collection Trenches

1 - Aeration system Every 5th Qtr gw sampling/report Annual Inspections FYR every five years; regular O&M of the aeration pond

B2753: Biweekly O&M Annual indoor air and subslab vapor sampling/report combined w/ other Bldgs

B2766: Annual indoor air and subslab vapor sampling/report combined w/ other Bldgs

New Bldg C: Annual indoor air and subslab vapor sampling/report combined w/ other Bldgs

Quarterly PFOS/PFOA system monitoring/ inspection/maintenance with reporting/notification

Quarterly Outfall discharge sampling/data release with annual water qual & parameters -Runway/Flightline Collection Trench (RFCT) GW Treatment Plant has been deactivated and approved for decommissioning/demolition which is included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.

PFOS/PFOA impacts

Whole home system at Res04 is associated with site FT002RA-OFY84FY84
NortheastPlattsburghFT002PFAS Site
NortheastPlattsburghSS013Munitions Maintenance SquadronN/ACERCLARA-OOzone sparging system operated intermittently through 2014; Soil excavation to remove residual contamination planned in 2018 followed by possible restart of ozone sparge system; groundwater/surface water monitoring, LUC/IC monitoring including general SVI restriction and occupancy restriction for Bldg. 3578, and Five-Year Review.1 - Ozone Sparging System inactiveQuarterly gw/sw monitoring/report

Annual Inspections

FYR every five years-The SVI restriction is based on calculations and not an actual study. Site closure (SC) under current PBR TO is pending. -PFOS/PFOA detected within The Site boundaries Investigation and remediation of PFOS/PFOA is not included in this TO.SCfor GW FY26
NortheastPlattsburghRW042Wash Rack AOCN/Anon-CERCLA managed as petroleum siteRA-OSemiannual groundwater monitoring, LUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review).NoneSemiannual gw sampling/report

Annual Inspections

FYR every five years-LNAPL discovered at site in 2017; results of investigation under current PBR are expected Jun 2021. Modification to the remedy based on the investigation is not included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFOS/PFOA is not included in this TO.RA-OTBD
NortheastPlattsburghCTU234UST-3580Former heating fuel USTNYSDEC R5 Corrective Action (Spills) ProgramRA-OMNA, Groundwater monitoring, LUC/IC inspections and Non-CERCLA Five-Year Review (AF Policy Review)NoneQuarterly gw sampling

Annual report Annual Inspections

FYR every five yearsSite closure (SC) is pending on the current PBR TO.SCFY12FY25
NortheastPlattsburghCTU281UST-2704Former diesel fuel USTNYSDEC R5 Corrective Action (Spills) ProgramRA-OLUC/IC Monitoring and Non-CERCLA Five-Year Review (AF Policy Review)NoneAnnual Inspections
FYR every five yearsInjection completed in 2018. Site closure (SC) is pending on the current PBR TO, but there may be external issues impacting site (i.e. abandoned underground fuel pipeline, and two adjacent fuels sites that were closed out pre base closure ~ 1991)LTMFY31Indefinite
NortheastPlattsburghCTU-294UST-2009Former fuel oil USTNYSDEC R5 Corrective Action (Spills) ProgramRA-OGroundwater monitoring, LUC/IC inspections, and Non-CERCLA Five-Year Review (AF Policy Review)NoneQuarterly GW/soil performance sampling

Annual report Annual Inspections

FYR every five yearsSoil excavation and mixing completed in 2017. Site closure (SC) is pending on the current PBR TO.RA-OFY28FY28
NortheastPlattsburghSS005No-Destructive Inspection (NDI) FacilityN/ACERCLALTMLUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsLTMFY98Indefinite
NortheastPlattsburghSS006Aerospace Ground Equipment (AGE) FacilityN/ACERCLALTMLUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsLTMFY98Indefinite
NortheastPlattsburghSS018Auto Hobby ShopN/ACERCLALTMLUC/IC monitoring (non-residential use), and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsLTMFY13Indefinite
NortheastPlattsburghLF021Former Landfill (56-59)N/ACERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewNoneAnnual Inspect./report

Biennial gw sampling/report GW sampling every 5 years/report

FYR every five yearsLTMFY97Indefinite
NortheastPlattsburghLF022Former Landfill (59-66)(D-3, D-7)CERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewNoneAnnual Inspect./report

Biennial gw sampling/report GW sampling every 5 years/report

FYR every five yearsLTMFY95Indefinite
NortheastPlattsburghLF023Former Landfill (66-81)(D-4)CERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas monitoring, and groundwater monitoring including baseline and routine events LUC/IC monitoring, and Five-Year Review.NoneAnnual Inspect./report

Annual gas sampling Annual routine gw sampling/report Every 5 years baseline gw sampling/report GW/sw sampling every 5 years/report

FYR every five yearsSite is governed by a Source Control Record of Decision and a Groundwater Operable Unit Record of DecisionLTMFY95Indefinite
NortheastPlattsburghLF024Former C & D LandfillN/ACERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewNoneAnnual Inspect./report

Biennial gw sampling/report GW sampling every 5 years/report

FYR every five yearsLTMFY97Indefinite
NortheastPlattsburghSS028Building 508 Open Storage AreaN/ACERCLALTMLUC/IC (non-residential use) monitoring and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsSoil investigation/excavation planned. SVI issues may require additional LUC/ICs at the site. Site closure (SC) under current PBR is pending.LTMFY21Indefinite
NortheastPlattsburghSS031Central Heat PlantN/ANYSDEC R5 Corrective Action (Spills) ProgramLTMLUC/IC Monitoring and Non-CERCLA Five-Year Review (AF Policy Review)NoneAnnual Inspections
FYR every five yearsPetroleum only site; Site closure (SC) under current PBR TO is pending w/ contamination discovered at site boundary near rails; if SC is not achieved, LUC/ICs including SVI restriction may be required.LTMFY21Indefinite
NortheastPlattsburghCWM127OTH-3505-1Construction Debris AreaRCRALTMLUC/IC Inspections and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsLTMFY21Indefinite
NortheastPlattsburghCSA283OTH-3210-2D&H NurseryRCRALTMLUC/IC Inspections and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsLTMFY21Indefinite
NortheastPlattsburghCDA286OTH-1700Area R Trash DumpRCRALTMLUC/IC Inspections and Five-Year ReviewNoneAnnual Inspections
FYR every five yearsDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsLTMFY21Indefinite

FA8903-20-R-0011

Attachment 1 Northeast Region 5 December 2019

&P of &N