TO 2 CDRLs Exhibit A B Northeast BECOS vf1.docx
DOCX document 15 KB Posted
- Attached to
- BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Northeast Region Federal contract opportunity
- Solicitation number
- FA890320R0011
About this file
This document outlines contract data requirements and deliverables for the Base Realignment and Closure Environmental Construction and Optimization Services Northeast Region contract opportunity. The contractor will be required to provide various scientific and technical reports, site survey reports, production problem reports, OSHA reports, technical data packages in GIS and CADD formats, environmental cleanup plans, environmental health and safety plans, environmental sampling and analysis plans, quality system plans, construction quality plans, analytical data, work plans, project management plans with annual revisions, monthly progress reports, ERPIMS schedules and data packages, presentation materials, conference agendas and minutes. The reports and deliverables will support environmental cleanup and optimization services for projects across the Northeast region as outlined in the contract work statement and will be delivered according to the frequencies specified for each contract data requirement listed.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8903-20-R-0011 TO 2
NORTHEAST REGION
5 DECEMBER 2019
| CDRL |
| Title |
| PWS Paragraphs |
| Frequency |
| A001 |
| SCIENTIFIC AND TECHNICAL REPORTS |
| 1.5, 2.2, 2.3, 2.6.2-2.6.5, 2.9, 2.10, 3.1.2, 3.3.1, 4.1-4.3, 4.5, 4.7, 5.1-5.4, 5.5.2.2, |
5.5.2.4, 5.6, 5.6.1, 6.1-6.2, 6.4-6.6, 6.8, 6.9, 6.11-6.18
TBD
| A002 |
| SITE SURVEY REPORT |
| 5.5.2.4 |
| TBD |
| A003 |
| REPORT, PRODUCTION OR DELIVERY PROBLEMS |
| 2.6.4 |
| As required |
| A004 |
| SCIENTIFIC AND TECHNICAL REPORTS – OSHA REPORTS |
| 2.7 |
| As required |
| A005 |
| TECHNICAL DATA PACKAGE - GIS |
| 3.4 |
| TBD |
| A006 |
| TECHNICAL DATA PACKAGE – CADD |
| 3.4 |
| TBD |
| A007 |
| ENVIRONMENTAL CLEANUP PLAN - PROJECT ACTIVITIES (WP, QAPP, OPTIMIZATION PLANS, etc.) |
| 3.1.1, 3.2.1, 3.3 |
| TBD |
| A008 |
| ENVIRONMENTAL HEALTH AND SAFETY PLAN - QUALITY PROGRAM PLAN - PART 1 |
| 3.2.2, 3.3, 5.6, 5.6.1 |
| TBD |
| A009 |
| ENVIRONMENTAL SAMPLING AND ANALYSIS PLAN - QUALITY PROGRAM PLAN - PART 2 |
| 3.2.3, 3.3 |
| TBD |
| A010 |
| QUALITY SYSTEM PLAN - CONSTRUCTION QUALITY PLAN |
| 3.2.4 |
| TBD |
| A011 |
| TECHNICAL DATA PACKAGE – ANALYTICAL DATA |
| 3.3.3 |
| TBD |
| A011 |
| TECHNICAL AND MANAGEMENT WORK PLAN – WORK PLAN |
| 3.1.1, 3.2.1, 5.1, 5.2, 5.3, 5.4, 5.5.2.2, 5.5.2.4, 6.14, 6.18 |
| TBD |
| B002 |
| MANAGEMENT PLAN - PROJECT MANAGEMENT PLAN |
| 2.2 |
| Initially w/ annual revisions thereafter |
| B003 |
| CONTRACTOR PROGRESS, STATUS AND MANAGEMENT REPORT |
| 2.4 |
| Monthly |
| B004A |
| TECHNICAL DATA PACKAGE – ERPIMS (SCHEDULE) |
| 3.3.4 |
| TBD |
| B004B |
| TECHNICAL DATA PACKAGE – ERPIMS (DATA PACKAGE) |
| 3.3.4 |
| Per B004A and as required |
| B005 |
| PRESENTATION MATERIALS |
| 2.6.1, 2.6.2, 2.6.3 |
| As required |
| B006 |
| CONFERENCE AGENDA |
| 2.6.1, 2.6.2, 2.6.3 |
| As required |
| B007 |
| CONFERENCE MINUTES |
| 2.6.1, 2.6.2, 2.6.3 |
| As required |