This Task Group Instruction (TGI) details a deck covering replacement project for the USS HIGGINS (DDG-76) at Yokosuka Naval Base, Japan. The work involves replacing 73 square feet of wear-resistant deck tile covering in passage 04-154-1-L, with a specific color of American Cherry (LT1519), and includes associated potable water piping work. The project requires disconnecting and reconnecting water piping, removing existing deck covering, and installing new deck tile that meets MIL-PRF-32170, Class One specifications.

The contract is scheduled for execution from August 25, 2025, to October 15, 2025, with the SRF-JRMC providing government-furnished materials and services including crane rigging, utility services, safety inspections, and quality assurance. The work involves potential asbestos hazards and requires specific adhesives and insulation materials, with chlorination and bacteriological testing to be performed by a qualified Japanese laboratory. The total deck area for modification is 81 square feet, including vertical structural surfaces.

View the file

Other files

File Type Posted
N6264925RA051-0002.pdf PDF
N6264925RA051-0003.pdf PDF
TGI_38KB264511A03_c0v0 FY26.pdf PDF
N6264925RA051-0001.pdf PDF
TGI_38KB212317A01_c2v2 FY26.pdf PDF
TGI_38KB264512A01_c0v0 FY26.pdf PDF
TGI_38KB264511T01_c0v0 FY26.pdf PDF
TGI_38KB264505A02_c0v0 FY26.pdf PDF
TGI_38KB212317A01_c2v2.pdf PDF
TGI_38KB264505T01_c0v0 FY26.pdf PDF
TGI_38KB244101A01_c0v0 FY26.pdf PDF
TGI_38KB264510A01_c0v0 FY26.pdf PDF
N6264925RA051.pdf PDF
Att III RFI 25RA051.docx DOCX document
TGI_38KB264512A01_c0v0.pdf PDF
TGI_38KB264510A01_c0v0.pdf PDF
N6264925RA051.pdf PDF
TGI_38KB264511T01_c0v0.pdf PDF
Att II Price Proposal Form N6264925RA051.xlsx XLSX spreadsheet
Att III RIF 25RA051.docx DOCX document
TGI_38KB264505A02_c0v0.pdf PDF
TGI_38KB244101A01_c0v0.pdf PDF
TGI_38KB264505T01_c0v0.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

28-APR-2025 0932

20.14.15.2.9020 (September 2024) ICN: 38KB264511 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE PWAY TILE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - REPLACE DECK COVERING IN 04-154-1-L

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

NN010978

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NAKAGAWA, DAICHI 231A 3152430969 16-APR-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 16-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

NN01-0978

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

645A1111

1. SCOPE/PURPOSE:

1.1 Title: Deck Covering in 04-154-1-L; replace

1.2 Location of Work:

1.2.1 Passage (04-154-1-L)

1.3 Identification:

1.3.1 Quantity (One AY), Potable Water Piping for Drinking Fountain, from union joint of valve CPW-V-362 (FWC/V0645)

Size: 3/8 Inch IPS (0.675 Inch OD x 0.065 Inch WT) Material: Cu-Ni 90-10 Specification: MIL-T-16420 Remarks: See Sheet 3B11 (Zone 5-D) and Sheet 4A9 (SECTION 4A9-1B) of Ref. No. 3 for details.

TGI Short Form

28-APR-2025 0932

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264511 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE PWAY TILE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - REPLACE DECK COVERING IN 04-154-1-L

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (73 SF), Wear Resistant Deck Tile Covering System [Existing]

1.3.3 Quantity (73 SF), Wear Resistant Deck Tile

Specification: MIL-PRF-32170, Class One Color: American Cherry, LT1519

1.3.4 Quantity (81 SF in Total), Deck Plating, including vertical structural surface up to height of One inch from complete wear resistant deck tile covering system level

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date: 25/AUG/2025

1.7 Contractor work completion date: 15/OCT/2025

2. PROCEDURE:

2.1 Disconnect mechanically and reconnect each potable water piping listed in 1.3.1 for supporting of preservation work, using Ref. No. 3 for guidance.

2.1.1 Accomplish the requirements of 009-87 of Ref. No. One for each potable water piping.

2.1.1.1 Accomplish the requirements of 009-09 of Ref. No. One for chlorination and bacteriological tests. Analysis and testing conducted by a qualified Japanese laboratory (accredited by ISO 17025 or equal) are authorized by the SUPERVISOR.

2.1.1.2 Record results of chlorination and bacteriological tests on a Laboratory Analysis Record(s) and DD Form 686, and submit one legible copy, in hard copy or approved transferrable media, of completed record(s) and form(s) to the

SUPERVISOR.

2.2 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment B, for removal of each existing equipment listed in 1.3.2 and installation of each new equipment listed in 1.3.3.

2.2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.4. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.

2.3 Notes:

2.3.1 Planner: Code 231A D. Nakagawa, 243-0969

Planner: Code 233 S. Ogawa, 090-6170-8579 Planner: Code 234 H. Mochizuki, 070-7787-2003

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 JCN NN01-0978 is related to this TGI.

28-APR-2025 0932

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264511 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE PWAY TILE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - REPLACE DECK COVERING IN 04-154-1-L

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38KB264511S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

28-APR-2025 0932

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264511 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE PWAY TILE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - REPLACE DECK COVERING IN 04-154-1-L

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 505-6566326 INSTL MCHRY & PP 04 LEVEL

FR 150 TO FR 185

U Y 3B1

1, 4A9

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

400 M ADHESIVE, ADHESIVE FOR

PLASTIC TUBE

ORDERED FOR KTR

ORIG: C234 H. MOCHIZUKI 070-

7787-2003

9B 8040 008419773 NA 4 Y 50945340 2/PT

401 M ADHESIVE, ADHESIVE FOR

CLOTH

ORDERED FOR KTR

ORIG: C234 H. MOCHIZUKI 070-

7787-2003

9B 8040 002738708 NA 4 Y 50945341 1/GL

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KB264511 KEY OP: A03

28-APR-2025 0932

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264511 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE PWAY TILE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - REPLACE DECK COVERING IN 04-154-1-L

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

402 M INSULATI, BRAND: K-FLEX

ECO,

SPECIFICATION COMPLIANCE:

EB 4013,

FOR SIZE: 3/8" IPS,

SIZE: 5/8" ID X 3/4" THK X 6FT

LG,

UI: EA/6 FT (ONE

CONTINUOUS LENGTH

REQUIRED),

ORDERED FOR KTR

ORIG: C234 H. MOCHIZUKI 070-

7787-2003

9B 5640 LL9607841 NA 4 N 50807450 2/EA