TGI_38KB264505A02_c0v0 FY26.pdf
PDF 208 KB Posted
- Attached to
- USS HIGGINS FY26 6J1 SIA FFP
- Solicitation number
- N6264925RA051
About this file
This is a Task Group Instruction (TGI) for the USS Higgins (DDG-76) detailing a deck covering replacement project scheduled for October through December 2025. The specific work involves replacing 729 square feet of chemical-resistant flooring in the 1-78-01-L passage, with a Navy blue color coat and white flakes, and includes work on 840 square feet of deck plating. The project requires disconnecting and reconnecting potable water piping, removing existing flooring, and installing new chemical-resistant flooring per military specifications MIL-PRF-32584 Type IV.
The document includes a comprehensive material list with multiple items such as pipe insulation (K-FLEX ECO brand), adhesives, and sealing compounds. SRF-JRMC (Ship Repair Facility, Japan Maintenance Activity) will provide government-furnished materials and services including crane and rigging, utility services, and quality assurance inspections. The work is noted to have a potential asbestos hazard, with specific requirements for chlorination and bacteriological testing of water systems. The contractor work is set to start on 14 October 2025 and complete by 26 December 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA051-0002.pdf | ||
| N6264925RA051-0003.pdf | ||
| TGI_38KB264511A03_c0v0 FY26.pdf | ||
| N6264925RA051-0001.pdf | ||
| TGI_38KB212317A01_c2v2 FY26.pdf | ||
| TGI_38KB264512A01_c0v0 FY26.pdf | ||
| TGI_38KB264511T01_c0v0 FY26.pdf | ||
| TGI_38KB212317A01_c2v2.pdf | ||
| TGI_38KB264505T01_c0v0 FY26.pdf | ||
| TGI_38KB244101A01_c0v0 FY26.pdf | ||
| TGI_38KB264510A01_c0v0 FY26.pdf | ||
| N6264925RA051.pdf | ||
| Att III RFI 25RA051.docx | DOCX document | |
| TGI_38KB264512A01_c0v0.pdf | ||
| TGI_38KB264510A01_c0v0.pdf | ||
| N6264925RA051.pdf | ||
| TGI_38KB264511T01_c0v0.pdf | ||
| Att II Price Proposal Form N6264925RA051.xlsx | XLSX spreadsheet | |
| TGI_38KB264511A03_c0v0.pdf | ||
| Att III RIF 25RA051.docx | DOCX document | |
| TGI_38KB264505A02_c0v0.pdf | ||
| TGI_38KB244101A01_c0v0.pdf | ||
| TGI_38KB264505T01_c0v0.pdf | ||
| Att IV GFP_GFM listings.xlsx | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
28-APR-2025 0923
20.14.15.2.9020 (September 2024) ICN: 38KB264505 KeyOp: A02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DC 1-78-01-L AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-78-01-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 6
SS01L002
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KANO, DAISUKE 231A 3152430098 14-APR-2025
APPROVED BY: CODE: PHONE: DATE:
NANBA, RYOUSUKE 231A 3152436141 16-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
SS01-L002
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
645A1105
1. SCOPE/PURPOSE:
1.1 Title: Deck Covering in 1-78-01-L; replace
1.2 Location of Work:
1.2.1 Passage (1-78-01-L)
1.3 Identification:
1.3.1 Quantity (One EA), Union Joint of Cold Potable Water System for Drinking Fountain Size: 3/8 Inch IPS Material: Bronze Specification: MIL-F-1183 Remarks: See Sheet 11A (DETAIL 11A-20A and TABLE 11A-19D-5) of Ref. No. 3 and Sheet 3D11 (Zone 6-C) and Sheet
4A12 (ELEVATION 4A12-7F) of Ref. No. 4 for details
TGI Short Form
28-APR-2025 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264505 KeyOp: A02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DC 1-78-01-L AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-78-01-L
FOUO Pg 2 of 6
CU PHASE DESCRIPTION (Cont.)
1.3.2 Quantity (729 SF), Chemical-Resistant Floorings System [Existing]
1.3.3 Quantity (729 SF), Chemical-Resistant Floorings System
Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flakes
1.3.4 Quantity (840 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-resistant floorings system level
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date: 14/OCT/2025
1.7 Contractor work completion date: 26/DEC/2025
2. PROCEDURE:
2.1 Disconnect mechanically and reconnect each union joint of cold potable water piping for drinking fountain listed in 1.3.1 for supporting deck work, using Ref. No. 3 and Ref. No. 4 for guidance.
2.1.1 Accomplish the requirements of 009-87 of Ref. No. One for each potable water piping.
2.1.1.1 Accomplish the requirements of 009-09 of Ref. No. One for chlorination and bacteriological tests. Analysis and testing conducted by a qualified Japanese laboratory (accredited by ISO 17025 or equal) are authorized by the SUPERVISOR.
2.1.1.2 Record results of chlorination and bacteriological tests on a Laboratory Analysis Record(s) and DD Form 686, and submit one legible copy, in hard copy or approved transferrable media, of completed record(s) and form(s) to the
SUPERVISOR.
2.2 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.2 and installation of each new equipment listed in 1.3.3.
2.2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.4. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.3 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.4 Notes:
2.4.1 Planner: Code 231A D. Kano, 243-0098
Planner: Code 233 Y. Shinohara, 080-9350-1451 Planner: Code 234 M. Hosoda, 243-4572 Planner: Code 234 H. Shinmei, 243-2371
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
28-APR-2025 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264505 KeyOp: A02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DC 1-78-01-L AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-78-01-L
FOUO Pg 3 of 6
CU PHASE DESCRIPTION (Cont.)
2.4.3 JCN SS01-L002 is related to this TGI.
2.5 Government Furnished Material (GFM):
2.5.1 SRF-JRMC will provide GFM listed in the Material List.
2.6 SRF-JRMC will provide the following service work: (TGI No. 38KB264505S03)
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbols.
28-APR-2025 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264505 KeyOp: A02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DC 1-78-01-L AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-78-01-L
FOUO Pg 4 of 6
OTHER SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II.
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 533-6218486 POTABLE WATER SYSTEM
DIAGRAM
R Y 11A
4 DWG 505-6219841 INSTL MCHRY & PP MN DK
PORT FR 78 TO 126
Y Y 3D 11, 4A1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M INSULATI, MATERIAL ORDER
FOR X57
ORIGINATOR C231A D. KANO
243-0098
9Q 5640 013713263 NA 4 N 51055020 4/SH
002 M ADHESIVE, MATERIAL ORDER
FOR X57
ORIGINATOR C231A D. KANO
243-0098
9B 8040 005508835 NA 4 Y 51055024 2/GL
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KB264505 KEY OP: A02
28-APR-2025 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264505 KeyOp: A02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DC 1-78-01-L AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-78-01-L
FOUO Pg 5 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
003 M SEALING, MATERIAL ORDER
FOR X57
ORIGINATOR C231A D. KANO
243-0098
9B 8030 001742588 NA 4 Y 51055027 4/GL
400 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION
COMPLIANCE:EB 4013,
FOR SIZE: 1/2" IPS,
SIZE: 7/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
9B 5640 LL4783092 NA 4 N 51017442 3/EA
401 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 1-1/4" IPS,
SIZE: 1-5/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
9B 5640 LL4783095 NA 4 N 51017443 3/EA
402 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 1-1/2” IPS,
SIZE: 2-1/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
9B 5640 LL9607843 NA 4 N 51017444 3/EA
403 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 3" IPS,
SIZE: 3-1/2"ID X 3/4" THK X 6 FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
DO NOT CROSS NSN: 5640-01-
607-0098(SIMC: X3),
9B 5640 LL9607846 NA 4 N 51017445 2/EA
28-APR-2025 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264505 KeyOp: A02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DC 1-78-01-L AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-78-01-L
FOUO Pg 6 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
404 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR 5" IPS,
SIZE: 5-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
9B 5640 LL9607849 NA 4 N 51017446 3/EA
405 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 6" IPS,
SIZE: 6-5/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
9B 5640 LL9607850 NA 4 N 51017448 2/EA
406 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
9B 5640 LL9607851 NA 4 N 51017449 2/EA
407 M INSULATION, INSULATION,
FLAT SHEET,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
SIZE: 36" W X 48" L X 3/4" THK,
MATL: NON-HALOGEN,
9B 5640 LL9607854 NA 4 N 51017450 4/SH
408 M ADHESIVE, ADHESIVE FOR
CLOTH
9B 8040 002738708 NA 4 Y 51015122 2/GL
409 M ADHESIVE, ADHESIVE FOR
INSULATION
9B 8040 008419773 NA 4 Y 51015126 4/PT
410 M SEALING COMPOUND, VAPOR
BARRIER
9B 8030 001742588 NA 4 Y 51015129 2/GL
File details come from the government source that posted it. Updated .