TGI_38KB244101A01_c0v0 FY26.pdf

PDF 175 KB Posted

Attached to
USS HIGGINS FY26 6J1 SIA FFP
Solicitation number
N6264925RA051
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Higgins (DDG-76), specifically focused on preserving the exterior surface of an Antenna Platform for Antenna 3-30B. The work is located on the 05 Level Weather, between Frames 160 and 168 on the Port side, covering 45 square feet. The contractor work is scheduled to start on 14/OCT/2025 and complete by 26/DEC/2025.

The TGI details specific procedural requirements, including accomplishing the requirements of document 009-32 and associated references. SRF-JRMC will provide supporting services including crane and rigging, utility services (electrical, water, steam), safety inspections, gas-free inspections, and quality assurance inspections. The document references two standard item documents: NAVSEA Standard Items and Local Standard Items for FY-25. No specific materials are listed in the material list section of the document.

View the file

Other files

File Type Posted
N6264925RA051-0002.pdf PDF
N6264925RA051-0003.pdf PDF
TGI_38KB264511A03_c0v0 FY26.pdf PDF
N6264925RA051-0001.pdf PDF
TGI_38KB212317A01_c2v2 FY26.pdf PDF
TGI_38KB264512A01_c0v0 FY26.pdf PDF
TGI_38KB264511T01_c0v0 FY26.pdf PDF
TGI_38KB264505A02_c0v0 FY26.pdf PDF
TGI_38KB212317A01_c2v2.pdf PDF
TGI_38KB264505T01_c0v0 FY26.pdf PDF
TGI_38KB264510A01_c0v0 FY26.pdf PDF
N6264925RA051.pdf PDF
Att III RFI 25RA051.docx DOCX document
TGI_38KB264512A01_c0v0.pdf PDF
TGI_38KB264510A01_c0v0.pdf PDF
N6264925RA051.pdf PDF
TGI_38KB264511T01_c0v0.pdf PDF
Att II Price Proposal Form N6264925RA051.xlsx XLSX spreadsheet
TGI_38KB264511A03_c0v0.pdf PDF
Att III RIF 25RA051.docx DOCX document
TGI_38KB264505A02_c0v0.pdf PDF
TGI_38KB244101A01_c0v0.pdf PDF
TGI_38KB264505T01_c0v0.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

28-APR-2025 0917

20.14.15.2.9020 (September 2024) ICN: 38KB244101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05LVL & ABV EXTERIOR MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 15611

CU PHASE TITLE: F/O – PRESERVE EXTERIOR SURFACE OF ANTENNA PLATFORM FOR ANTENNA 3-30B

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

CSE12160

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKANASHI, TATSUNORI 231A 3152436238 04-APR-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 07-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CSE1-2160

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 05 &ABV WEATHER U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

441A7101

1. SCOPE/PURPOSE:

1.1 Title: Exterior Surface of Antenna Platform for Antenna 3-30B; preserve

1.2 Location of Work:

1.2.1 05 Level Weather, Frames between 160 and 168, Port

1.3 Identification:

1.3.1 Quantity (45 SF), Exterior Surface of Antenna Platform for Antenna 3-30B

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 14/OCT/2025

TGI Short Form

28-APR-2025 0917

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB244101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05LVL & ABV EXTERIOR MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 15611

CU PHASE TITLE: F/O – PRESERVE EXTERIOR SURFACE OF ANTENNA PLATFORM FOR ANTENNA 3-30B

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.7 Contractor work completion date: 26/DEC/2025

2. PROCEDURE:

2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) One, for each area listed in 1.3.1.

2.2 Notes:

2.2.1 Planner: Code 231A T. Takanashi, 243-6238

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN CSE1-2160 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KB244101S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

28-APR-2025 0917

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB244101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05LVL & ABV EXTERIOR MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 15611

CU PHASE TITLE: F/O – PRESERVE EXTERIOR SURFACE OF ANTENNA PLATFORM FOR ANTENNA 3-30B

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KB244101 KEY OP: A01

File details come from the government source that posted it. Updated .