TGI_38KB264505T01_c0v0 FY26.pdf

PDF 91 KB Posted

Attached to
USS HIGGINS FY26 6J1 SIA FFP
Solicitation number
N6264925RA051
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Higgins (DDG-76), dated 03-MAY-2025, focusing on a Tightness & Operational Test for the Potable Water System. The Task Group Instruction (TGI) number is 53311-3-300KTR, with a component type of TT and phase T, associated with project KB2 and system 53311. The document was prepared by Morita Matsuki and approved by Ohta Jason Y. on 01-MAY-2025, with the zone manager listed as Yaginuma Takehide. The primary purpose of this instruction is to conduct a comprehensive test of the potable water system, ensuring its operational integrity and tightness on the naval vessel.

View the file

Other files

File Type Posted
N6264925RA051-0002.pdf PDF
N6264925RA051-0003.pdf PDF
TGI_38KB264511A03_c0v0 FY26.pdf PDF
N6264925RA051-0001.pdf PDF
TGI_38KB212317A01_c2v2 FY26.pdf PDF
TGI_38KB264512A01_c0v0 FY26.pdf PDF
TGI_38KB264511T01_c0v0 FY26.pdf PDF
TGI_38KB264505A02_c0v0 FY26.pdf PDF
TGI_38KB212317A01_c2v2.pdf PDF
TGI_38KB244101A01_c0v0 FY26.pdf PDF
TGI_38KB264510A01_c0v0 FY26.pdf PDF
N6264925RA051.pdf PDF
Att III RFI 25RA051.docx DOCX document
TGI_38KB264512A01_c0v0.pdf PDF
TGI_38KB264510A01_c0v0.pdf PDF
N6264925RA051.pdf PDF
TGI_38KB264511T01_c0v0.pdf PDF
Att II Price Proposal Form N6264925RA051.xlsx XLSX spreadsheet
TGI_38KB264511A03_c0v0.pdf PDF
Att III RIF 25RA051.docx DOCX document
TGI_38KB264505A02_c0v0.pdf PDF
TGI_38KB244101A01_c0v0.pdf PDF
TGI_38KB264505T01_c0v0.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-MAY-2025 1015

20.14.15.2.9020 (September 2024) ICN: 38KB264505 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 53311

CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

SS01L002

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

MORITA, MATSUKI 246.2 3152432332 01-MAY-2025

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 01-MAY-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

SS01-L002

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

645A1105

Tightness & Operational Test for Potable Water System - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-MAY-2025 1015

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264505 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 53311

CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 53311-3-300KTR POTABLE WATER SYS (T &

OP) - KTR

LAT Y

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KB264505 KEY OP: T01

File details come from the government source that posted it. Updated .