TGI_38KB264505T01_c0v0 FY26.pdf
PDF 91 KB Posted
- Attached to
- USS HIGGINS FY26 6J1 SIA FFP
- Solicitation number
- N6264925RA051
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Higgins (DDG-76), dated 03-MAY-2025, focusing on a Tightness & Operational Test for the Potable Water System. The Task Group Instruction (TGI) number is 53311-3-300KTR, with a component type of TT and phase T, associated with project KB2 and system 53311. The document was prepared by Morita Matsuki and approved by Ohta Jason Y. on 01-MAY-2025, with the zone manager listed as Yaginuma Takehide. The primary purpose of this instruction is to conduct a comprehensive test of the potable water system, ensuring its operational integrity and tightness on the naval vessel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA051-0002.pdf | ||
| N6264925RA051-0003.pdf | ||
| TGI_38KB264511A03_c0v0 FY26.pdf | ||
| N6264925RA051-0001.pdf | ||
| TGI_38KB212317A01_c2v2 FY26.pdf | ||
| TGI_38KB264512A01_c0v0 FY26.pdf | ||
| TGI_38KB264511T01_c0v0 FY26.pdf | ||
| TGI_38KB264505A02_c0v0 FY26.pdf | ||
| TGI_38KB212317A01_c2v2.pdf | ||
| TGI_38KB244101A01_c0v0 FY26.pdf | ||
| TGI_38KB264510A01_c0v0 FY26.pdf | ||
| N6264925RA051.pdf | ||
| Att III RFI 25RA051.docx | DOCX document | |
| TGI_38KB264512A01_c0v0.pdf | ||
| TGI_38KB264510A01_c0v0.pdf | ||
| N6264925RA051.pdf | ||
| TGI_38KB264511T01_c0v0.pdf | ||
| Att II Price Proposal Form N6264925RA051.xlsx | XLSX spreadsheet | |
| TGI_38KB264511A03_c0v0.pdf | ||
| Att III RIF 25RA051.docx | DOCX document | |
| TGI_38KB264505A02_c0v0.pdf | ||
| TGI_38KB244101A01_c0v0.pdf | ||
| TGI_38KB264505T01_c0v0.pdf | ||
| Att IV GFP_GFM listings.xlsx | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
03-MAY-2025 1015
20.14.15.2.9020 (September 2024) ICN: 38KB264505 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
SS01L002
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
MORITA, MATSUKI 246.2 3152432332 01-MAY-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 01-MAY-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
SS01-L002
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
645A1105
Tightness & Operational Test for Potable Water System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
03-MAY-2025 1015
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264505 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 53311-3-300KTR POTABLE WATER SYS (T &
OP) - KTR
LAT Y
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KB264505 KEY OP: T01