This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Higgins (DDG-76), specifically addressing a deck covering replacement project in the Signal Shelter (04-158-1-Q). The work involves removing and replacing 47 square feet of existing chemical-resistant flooring with a new chemical-resistant flooring system, specified as MIL-PRF-32584, Type IV, in Navy blue color with white flakes. An additional 59 square feet of deck plating, including vertical structural surfaces, will also be addressed.
The project is scheduled to start on 14 October 2025 and complete by 26 December 2025. The Southwest Regional Maintenance Center (SRF-JRMC) will provide supporting services including crane and rigging, utility services (electrical, air, water, steam), and safety/quality assurance inspections. A potential asbestos hazard is noted, and the work will follow specific requirements outlined in referenced documents. The job is planned by Code 231A with a Work Integration Manager from Code 333, and is associated with Job Control Number NN01-0986.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA051-0002.pdf | ||
| N6264925RA051-0003.pdf | ||
| TGI_38KB264511A03_c0v0 FY26.pdf | ||
| N6264925RA051-0001.pdf | ||
| TGI_38KB212317A01_c2v2 FY26.pdf | ||
| TGI_38KB264511T01_c0v0 FY26.pdf | ||
| TGI_38KB264505A02_c0v0 FY26.pdf | ||
| TGI_38KB212317A01_c2v2.pdf | ||
| TGI_38KB264505T01_c0v0 FY26.pdf | ||
| TGI_38KB244101A01_c0v0 FY26.pdf | ||
| TGI_38KB264510A01_c0v0 FY26.pdf | ||
| N6264925RA051.pdf | ||
| Att III RFI 25RA051.docx | DOCX document | |
| TGI_38KB264512A01_c0v0.pdf | ||
| TGI_38KB264510A01_c0v0.pdf | ||
| N6264925RA051.pdf | ||
| TGI_38KB264511T01_c0v0.pdf | ||
| Att II Price Proposal Form N6264925RA051.xlsx | XLSX spreadsheet | |
| TGI_38KB264511A03_c0v0.pdf | ||
| Att III RIF 25RA051.docx | DOCX document | |
| TGI_38KB264505A02_c0v0.pdf | ||
| TGI_38KB244101A01_c0v0.pdf | ||
| TGI_38KB264505T01_c0v0.pdf | ||
| Att IV GFP_GFM listings.xlsx | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
28-APR-2025 0933
20.14.15.2.9020 (September 2024) ICN: 38KB264512 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 04-158-1-Q DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 67111
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 04-158-1-Q
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
NN010986
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KANO, DAISUKE 231A 3152430098 14-APR-2025
APPROVED BY: CODE: PHONE: DATE:
NANBA, RYOUSUKE 231A 3152436141 16-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
NN01-0986
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 04-158-1-Q 04 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
645A1112
1. SCOPE/PURPOSE:
1.1 Title: Deck Covering in 04-158-1-Q; replace
1.2 Location of Work:
1.2.1 Signal Shelter (04-158-1-Q)
1.3 Identification:
1.3.1 Quantity (47 SF), Chemical-Resistant Floorings System [Existing]
1.3.2 Quantity (47 SF), Chemical-Resistant Floorings System
Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flakes
1.3.3 Quantity (59 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-
TGI Short Form
28-APR-2025 0933
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264512 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 04-158-1-Q DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 67111
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 04-158-1-Q
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
resistant floorings system level
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date: 14/OCT/2025
1.7 Contractor work completion date: 26/DEC/2025
2. PROCEDURE:
2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.
2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.2 Notes:
2.2.1 Planner: Code 231A D. Kano, 243-0098
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN NN01-0986 is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38KB264512S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbols.
28-APR-2025 0933
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264512 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 04-158-1-Q DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 67111
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 04-158-1-Q
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KB264512 KEY OP: A01
File details come from the government source that posted it. Updated .