TGI_38KB212317A01_c2v2 FY26.pdf

PDF 144 KB Posted

Attached to
USS HIGGINS FY26 6J1 SIA FFP
Solicitation number
N6264925RA051
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Higgins (DDG-76), dated 15-JUL-2025, focusing on preserving handrails for an inclined ladder in the Access Trunk (3-116-1-T). The task involves removing two steel handrails, applying haze gray powder coating according to specified requirements, and reinstalling them. The contractor work is scheduled from 14-OCT-2025 to 26-DEC-2025.

SRF-JRMC will provide supporting services including crane and rigging, utility services (electrical, low pressure air, water, and steam), and safety and quality assurance inspections. Key personnel include D. Kano (Planner, Code 231A) and T. Yaginuma (Work Integration Manager, Code 333). The job is associated with JCN OT01-2353 and references include NAVSEA Standard Items, Local Standard Items, and a drawing for Inclined Ladders Arrangement & Details.

View the file

Other files

File Type Posted
N6264925RA051-0002.pdf PDF
N6264925RA051-0003.pdf PDF
TGI_38KB264511A03_c0v0 FY26.pdf PDF
N6264925RA051-0001.pdf PDF
TGI_38KB264512A01_c0v0 FY26.pdf PDF
TGI_38KB264511T01_c0v0 FY26.pdf PDF
TGI_38KB264505A02_c0v0 FY26.pdf PDF
TGI_38KB212317A01_c2v2.pdf PDF
TGI_38KB264505T01_c0v0 FY26.pdf PDF
TGI_38KB244101A01_c0v0 FY26.pdf PDF
TGI_38KB264510A01_c0v0 FY26.pdf PDF
N6264925RA051.pdf PDF
Att III RFI 25RA051.docx DOCX document
TGI_38KB264512A01_c0v0.pdf PDF
TGI_38KB264510A01_c0v0.pdf PDF
N6264925RA051.pdf PDF
TGI_38KB264511T01_c0v0.pdf PDF
Att II Price Proposal Form N6264925RA051.xlsx XLSX spreadsheet
TGI_38KB264511A03_c0v0.pdf PDF
Att III RIF 25RA051.docx DOCX document
TGI_38KB264505A02_c0v0.pdf PDF
TGI_38KB244101A01_c0v0.pdf PDF
TGI_38KB264505T01_c0v0.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

15-JUL-2025 1705

20.14.15.2.9020 (September 2024) ICN: 38KB212317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: HANDRAIL 3-116-1-T AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - PRESERVE HANDRAIL OF INCLINED LADDER FOR 3-116-1-T

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

OT012353

PREPARING ACTIVITY: STATUS: APP WORKING STATUS: PKG

PREPARED BY: CODE: PHONE: DATE:

KANO, DAISUKE 231A 3152430098 05-JUN-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 15-JUL-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

OT01-2353

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

KONDO, SHINYA

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A2117

1 SCOPE/PURPOSE:

1.1 Title: Handrail of Inclined Ladder for 3-116-1-T; preserve

1.2 Location of Work:

1.2.1 Access Trunk (3-116-1-T)

1.3 Identification:

1.3.1 Quantity (2 EA), Handrail of Inclined Ladder for 3-116-1-T Material: Steel

1.4 Security Classification: None.

1.5 Initial Condition: None.

TGI Short Form

15-JUL-2025 1705

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB212317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: HANDRAIL 3-116-1-T AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - PRESERVE HANDRAIL OF INCLINED LADDER FOR 3-116-1-T

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.6 Contractor work start date: 14/OCT/2025

1.7 Contractor work completion date: 26/DEC/2025

2. PROCEDURE:

2.1 Remove each handrail listed in 1.3.1, using Ref. No. 3 for guidance.

2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 5, Line(s) 23, for each handrail listed in 1.3.1. The color of powder coating must be haze gray.

2.3 Reinstall each handrail listed in 1.3.1 in accordance with Ref. No. 3.

2.4 Notes:

2.4.1 Planner: Code 231A D. Kano, 243-0098

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 JCN OT01-2353 is related to this TGI.

2.5 Government Furnished Material (GFM): None.

2.6 SRF-JRMC will provide the following service work: (TGI No. 38KB212317S02)

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service, electrical.

2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA inspection for (G) symbols.

15-JUL-2025 1705

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB212317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: HANDRAIL 3-116-1-T AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2

CU PHASE TITLE: F/O - PRESERVE HANDRAIL OF INCLINED LADDER FOR 3-116-1-T

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 8100-1266-

INCLINED LADDERS

ARRANGEMENT & DETAILS

AD Y 3,5,

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KB212317 KEY OP: A01

File details come from the government source that posted it. Updated .