This is a WebAIM Short Form Task Group Instruction (TGI) for the USS Higgins (DDG-76) dated 15-JUL-2025, focused on preserving handrails for an inclined ladder in the Access Trunk (3-116-1-T). The specific task involves removing two steel handrails, powder coating them haze gray according to referenced guidelines, and reinstalling them. The contractor work is scheduled from 14-OCT-2025 to 26-DEC-2025.
The document outlines detailed procedures for the handrail preservation, including removal guidance from Drawing 8100-1266-0222, coating requirements, and reinstallation instructions. SRF-JRMC will provide supporting services including crane and rigging, utility services (electrical, air, water, steam), and safety/QA inspections. Key personnel include D. Kano (Planner, Code 231A) and T. Yaginuma (Work Integration Manager, Code 333), with the job identified by JCN OT01-2353.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA051-0002.pdf | ||
| N6264925RA051-0003.pdf | ||
| TGI_38KB264511A03_c0v0 FY26.pdf | ||
| N6264925RA051-0001.pdf | ||
| TGI_38KB212317A01_c2v2 FY26.pdf | ||
| TGI_38KB264512A01_c0v0 FY26.pdf | ||
| TGI_38KB264511T01_c0v0 FY26.pdf | ||
| TGI_38KB264505A02_c0v0 FY26.pdf | ||
| TGI_38KB264505T01_c0v0 FY26.pdf | ||
| TGI_38KB244101A01_c0v0 FY26.pdf | ||
| TGI_38KB264510A01_c0v0 FY26.pdf | ||
| N6264925RA051.pdf | ||
| Att III RFI 25RA051.docx | DOCX document | |
| TGI_38KB264512A01_c0v0.pdf | ||
| TGI_38KB264510A01_c0v0.pdf | ||
| N6264925RA051.pdf | ||
| TGI_38KB264511T01_c0v0.pdf | ||
| Att II Price Proposal Form N6264925RA051.xlsx | XLSX spreadsheet | |
| TGI_38KB264511A03_c0v0.pdf | ||
| Att III RIF 25RA051.docx | DOCX document | |
| TGI_38KB264505A02_c0v0.pdf | ||
| TGI_38KB244101A01_c0v0.pdf | ||
| TGI_38KB264505T01_c0v0.pdf | ||
| Att IV GFP_GFM listings.xlsx | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
15-JUL-2025 1705
20.14.15.2.9020 (September 2024) ICN: 38KB212317 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: HANDRAIL 3-116-1-T AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: F/O - PRESERVE HANDRAIL OF INCLINED LADDER FOR 3-116-1-T
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
OT012353
PREPARING ACTIVITY: STATUS: APP WORKING STATUS: PKG
PREPARED BY: CODE: PHONE: DATE:
KANO, DAISUKE 231A 3152430098 05-JUN-2025
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 15-JUL-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
OT01-2353
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
KONDO, SHINYA
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A2117
1 SCOPE/PURPOSE:
1.1 Title: Handrail of Inclined Ladder for 3-116-1-T; preserve
1.2 Location of Work:
1.2.1 Access Trunk (3-116-1-T)
1.3 Identification:
1.3.1 Quantity (2 EA), Handrail of Inclined Ladder for 3-116-1-T Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition: None.
TGI Short Form
15-JUL-2025 1705
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB212317 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: HANDRAIL 3-116-1-T AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: F/O - PRESERVE HANDRAIL OF INCLINED LADDER FOR 3-116-1-T
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.6 Contractor work start date: 14/OCT/2025
1.7 Contractor work completion date: 26/DEC/2025
2. PROCEDURE:
2.1 Remove each handrail listed in 1.3.1, using Ref. No. 3 for guidance.
2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 5, Line(s) 23, for each handrail listed in 1.3.1. The color of powder coating must be haze gray.
2.3 Reinstall each handrail listed in 1.3.1 in accordance with Ref. No. 3.
2.4 Notes:
2.4.1 Planner: Code 231A D. Kano, 243-0098
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 JCN OT01-2353 is related to this TGI.
2.5 Government Furnished Material (GFM): None.
2.6 SRF-JRMC will provide the following service work: (TGI No. 38KB212317S02)
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbols.
15-JUL-2025 1705
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB212317 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: HANDRAIL 3-116-1-T AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2
CU PHASE TITLE: F/O - PRESERVE HANDRAIL OF INCLINED LADDER FOR 3-116-1-T
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 8100-1266-
INCLINED LADDERS
ARRANGEMENT & DETAILS
AD Y 3,5,
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KB212317 KEY OP: A01