TGI_38KB244101A01_c0v0.pdf
PDF 174 KB Posted
- Attached to
- USS HIGGINS FY26 6J1 SIA FFP
- Solicitation number
- N6264925RA051
About this file
This document is a Task Group Instruction (TGI) for preservation work on the USS Higgins (DDG-76), specifically focusing on preserving the exterior surface of the Antenna Platform for Antenna 3-30B. The work is located on the 05 Level Weather, Frames between 160 and 168, Port side, covering 45 square feet. The contractor work is scheduled to start on 25 August 2025 and complete by 15 October 2025.
The TGI outlines detailed procedures, including accomplishing requirements of reference document 009-32, and specifies that SRF-JRMC will provide supporting services such as crane and rigging, utility services (electrical, water, steam), and safety/quality assurance inspections. Key personnel include T. Takanashi (Planner, Code 231A) and T. Yaginuma (Work Integration Manager, Code 333). The job is associated with Job Control Number (JCN) CSE1-2160 and has no government-furnished material required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA051-0002.pdf | ||
| N6264925RA051-0003.pdf | ||
| TGI_38KB264511A03_c0v0 FY26.pdf | ||
| N6264925RA051-0001.pdf | ||
| TGI_38KB212317A01_c2v2 FY26.pdf | ||
| TGI_38KB264512A01_c0v0 FY26.pdf | ||
| TGI_38KB264511T01_c0v0 FY26.pdf | ||
| TGI_38KB264505A02_c0v0 FY26.pdf | ||
| TGI_38KB212317A01_c2v2.pdf | ||
| TGI_38KB264505T01_c0v0 FY26.pdf | ||
| TGI_38KB244101A01_c0v0 FY26.pdf | ||
| TGI_38KB264510A01_c0v0 FY26.pdf | ||
| N6264925RA051.pdf | ||
| Att III RFI 25RA051.docx | DOCX document | |
| TGI_38KB264512A01_c0v0.pdf | ||
| TGI_38KB264510A01_c0v0.pdf | ||
| N6264925RA051.pdf | ||
| TGI_38KB264511T01_c0v0.pdf | ||
| Att II Price Proposal Form N6264925RA051.xlsx | XLSX spreadsheet | |
| TGI_38KB264511A03_c0v0.pdf | ||
| Att III RIF 25RA051.docx | DOCX document | |
| TGI_38KB264505A02_c0v0.pdf | ||
| TGI_38KB264505T01_c0v0.pdf | ||
| Att IV GFP_GFM listings.xlsx | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
28-APR-2025 0917
20.14.15.2.9020 (September 2024) ICN: 38KB244101 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05LVL & ABV EXTERIOR MS A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 15611
CU PHASE TITLE: F/O – PRESERVE EXTERIOR SURFACE OF ANTENNA PLATFORM FOR ANTENNA 3-30B
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
CSE12160
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAKANASHI, TATSUNORI 231A 3152436238 04-APR-2025
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 07-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CSE1-2160
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 05 &ABV WEATHER U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
441A7101
1. SCOPE/PURPOSE:
1.1 Title: Exterior Surface of Antenna Platform for Antenna 3-30B; preserve
1.2 Location of Work:
1.2.1 05 Level Weather, Frames between 160 and 168, Port
1.3 Identification:
1.3.1 Quantity (45 SF), Exterior Surface of Antenna Platform for Antenna 3-30B
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 25/AUG/2025
TGI Short Form
28-APR-2025 0917
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB244101 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05LVL & ABV EXTERIOR MS A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 15611
CU PHASE TITLE: F/O – PRESERVE EXTERIOR SURFACE OF ANTENNA PLATFORM FOR ANTENNA 3-30B
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.7 Contractor work completion date: 15/OCT/2025
2. PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) One, for each area listed in 1.3.1.
2.2 Notes:
2.2.1 Planner: Code 231A T. Takanashi, 243-6238
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN CSE1-2160 is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38KB244101S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
28-APR-2025 0917
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB244101 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05LVL & ABV EXTERIOR MS A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 15611
CU PHASE TITLE: F/O – PRESERVE EXTERIOR SURFACE OF ANTENNA PLATFORM FOR ANTENNA 3-30B
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KB244101 KEY OP: A01