PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(7).xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-P-04LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for a state and local contract opportunity issued by Volusia County, Florida for the Daytona Beach Ocean Center Electrical Switchgear Replacement project (Contract No. C-2014, ITB No. 25-B-##XX). The form requires bidders to list all proposed subcontractors for the electrical switchgear replacement work at the Ocean Center facility. Prime contractors must document the dollar value and percentage of work to be performed by themselves and each subcontractor, with specific disciplines anticipated to include electrical work and potentially HVAC, plumbing, landscaping, and other trades as needed. The form mandates completion and submission as part of the bid package, as failure to do so may result in a non-responsive bid designation. Any subcontractor changes during project execution require prior approval from the County Project Manager.
The form requires bidders to allocate the total bid price across the prime contractor and all subcontractors, with green-shaded cells indicating where dollar values must be entered by the bidder and all other cells calculating automatically. The total work allocation must equal 100 percent across all parties performing work. The County reserves the right to request clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. The Prime Contractor bears responsibility for ensuring all subcontractors hold appropriate licenses. This form also serves to determine local preference eligibility in accordance with the solicitation requirements. The project involves replacing aging high-voltage switchgear equipment to improve electrical system reliability, enhance safety infrastructure, ensure compliance with current electrical codes, and support future facility expansions at the Ocean Center.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| Electrical Contractor | $ - 0 | 0.00% | ||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .