This document is a checklist for the Change of Occupancy Painting (COP) service, which is part of the Preventive Maintenance (PM), Repair, and Cleaning Service at Army Family Housing, Camp Walker contract opportunity. The checklist outlines the requirements for complete interior painting, including criteria for surface preparation, paint application, cleaning, and restoration. The key requirements include achieving complete hiding, having a clean and uniform surface, ensuring doors and windows operate freely, replacing all light bulbs, and performing final cleanup and restoration.

The related federal contract opportunity is Solicitation Number W90VN924R0024, issued by the Department of the Army Materiel Command Army Contracting Command. The solicitation is for Preventive Maintenance (PM), Repair, and Cleaning Service at Army Family Housing, Camp Walker, with a closing date of June 28, 2024, at 1:00 PM (Korea Local Date & Time).

View the file

Other files

File Type Posted
Amendment 0001 to 24R0024.pdf PDF
Technical Exhibit 18 Tower1 Custodial Drawing.pdf PDF
Technical Exhibit 21 Tower1 Elec Drawing 1.pdf PDF
Technical Exhibit 26 Tower2 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 5 Vacant Qtrs Montly Report.docx DOCX document
Technical Exhibit 27 Tower2 Ground Maintenance Map.pdf PDF
Attachment-ELIN List for CLIN X022.pdf PDF
Technical Exhibit 53 Tower4 Mech and Plumbing Drawing 3.pdf PDF
Technical Exhibit 14 Contract Descepancy Report (CDR).pdf PDF
Technical Exhibit 33 Tower2 Bed Type Drawing.pdf PDF
Technical Exhibit 25 Tower2 Custodial Drawing.pdf PDF
Technical Exhibit 30 Tower2 Elec Drawing-3.pdf PDF
AFH-Maintenance_Exhibit-list.docx DOCX document
Technical Exhibit 4 Monthly Service Order Report.docx DOCX document
Technical Exhibit 17 Check Lists.docx DOCX document
RFP-W90VN924R0024.pdf PDF
Technical Exhibit 40 Tower3 Mech and Plumbing Drawing 1.pdf PDF
Technical Exhibit 6 Quality and Standards of Work.docx DOCX document
Technical Exhibit 46 Tower4 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 50 Tower4 Elec Drawing 2.pdf PDF
Technical Exhibit 31 Tower2 Elec Drawing 4.pdf PDF
Technical Exhibit 11 Daily Contract Inspection Report.docx DOCX document
Technical Exhibit 51 Tower4 Mech and Plumbing Drawing 1.pdf PDF
Technical Exhibit 47 Tower4 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 22 Tower1 Elec Drawing-2.pdf PDF
Technical Exhibit 16 COM Monthly Report.xlsx XLSX spreadsheet
Technical Exhibit 20 Tower1 Ground Maintenance Map.pdf PDF
Technical Exhibit 48 Tower4 Ground Maintenance Map.pdf PDF
Technical Exhibit 28 Tower2 Elec Drawing-1.pdf PDF
Technical Exhibit 43 Tower3 Bed Type Drawing.pdf PDF
Technical Exhibit 1 PRS.docx DOCX document
Technical Exhibit 13 Contract Reminder.docx DOCX document
Technical Exhibit 45 Tower4 Custodial Drawing.pdf PDF
Technical Exhibit 3 Scheduled Services.docx DOCX document
Technical Exhibit 52 Tower4 Mech and Plumbing Drawing 2.pdf PDF
Technical Exhibit 2 Deliverables.docx DOCX document
Technical Exhibit 37 Tower3 Ground Maintenance Map.pdf PDF
Technical Exhibit 54 Tower4 Bed Type Drawing.pdf PDF
Technical Exhibit 12 Sample NCIR.docx DOCX document
Technical Exhibit 29 Tower2 Elec Drawing-2.pdf PDF
Technical Exhibit 38 Tower3 Elec Drawing 1.pdf PDF
Technical Exhibit 36 Tower3 Exterior Window Cleaning Drawing 2.pdf PDF
Technical Exhibit 41 Tower3 Mech and Plumbing Drawing 2.pdf PDF
Technical Exhibit 35 Tower3 Exterior Window Cleaning Drawing 1.pdf PDF
Technical Exhibit 44 Custodial Working Schedule.docx DOCX document
Technical Exhibit 23 Tower1 Mech and Plumbing Drawing.pdf PDF
Technical Exhibit 7 COC Check List.xlsx XLSX spreadsheet
Technical Exhibit 49 Tower4 Elec Drawing 1.pdf PDF
Technical Exhibit 34 Tower3 Custodial Drawing.Revised.pdf PDF
Technical Exhibit 42 Tower3 Mech and Plumbing Drawing 3.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHIBIT 8

Change of Occupancy Painting (COP): Complete Interior Painting Checklists

Quarters No. Tower No. Date In

Required Additional Time Work Yes No Date Out

Contractor's Signature

(Comment on Additional Work in the Remarks Section)

Checklist Item Item Description

1. Complete hiding is achieved.

2.Surface
a. Clean and non-chalking.
b. No runs or paint edges.
c. No peeling or non-adhesion.
d. Uniform in texture, color and reflectance.
e. Dry to touch.
f. Repairs and patches are finished.
g. Overspray, previous paint, etc., removed from appliances, rubber, glass, electrical fixtures, switch plates, receptacles, covers, screens, hardware andwindow runners.

3. Clean interior window glass.

4. Doors and windows operate freely.

5. Natural, stained and re-varnished finish are uniform in color and reflectance.

6. All light bulbs installed and working.

7. Cleanup and restoration.

Remarks: