Technical Exhibit 14 Contract Descepancy Report (CDR).pdf
PDF 70 KB Posted
- Attached to
- Preventive Maintenance (PM), Repair, and Cleaning Service at Army Family Housing, Camp Walker
- Solicitation number
- W90VN924R0024
About this file
This document is a Contract Discrepancy Report (CDR) that details a problem or discrepancy that has occurred under a federal contract. The CDR includes information such as the contract number, report number, the contractor and government representative involved, the dates the CDR was prepared, returned by the contractor, and when the action was completed. It describes the specific discrepancy or problem in detail, references the applicable Performance Work Statement (PWS) directive, and requires the contractor to provide a response on the cause, corrective action, and actions to prevent recurrence. The government then evaluates the contractor's response and determines any necessary actions such as reduced payment, cure notice, or show cause. The CDR must be formally closed out with notification to the relevant parties.
The federal contract opportunity referenced is for Preventive Maintenance (PM), Repair, and Cleaning Service at Army Family Housing, Camp Walker, solicitation number W90VN924R0024. The opportunity is being issued by the Department of the Army Materiel Command Army Contracting Command, with a closing date/time of June 28, 2024 at 1:00 PM Korea local time.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO (Contractor and Manager's Name) 4. FROM (Name of QAE)
5. DATES (YYYYMMDD)
a. PREPARED b. RETURNED BY CONTRACTOR c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF CONTRACTING OFFICER
8a. TO (Contracting Officer) b. FROM (Contractor)
9. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable Q.C.
program procedures or new Q.C. procedures. Attach continuation sheet(s) if necessary.)
10. SIGNATURE OF CONTRACTOR REPRESENTATIVE b. DATE (YYYYMMDD)
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary)
12. GOVERNMENT ACTIONS (Reduced payment, cure notice, show cause, other)
13. CLOSE OUT
NAME
(1)
TITLE
(2)
SIGNATURE
(3)
DATE (YYYYMMDD)
(4)
a. CONTRACTOR
NOTIFIED
b. QAE
c. ACO
DD FORM 2772, SEP 1998 REPLACES MT FORM 352-R, WHICH IS OBSOLETE. Adobe Professional 8.0
| ctr_no: |
| rpt_no: |
| to: |
| from: |
| prep_date: |
| ret_date: |
| comp_date: |
| discrep: |
| to_ctr: |
| from_ctr: |
| ctr_resp: |
| rep_date: |
| govt_eval: |
| govt_act: |
| notif_name: |
| notif_title: |
| notif_date: |
| qae_name: |
| qae_title: |
| qae_date: |
| aco_name: |
| aco_title: |
| aco_date: |
| Reset: |
File details come from the government source that posted it. Updated .