This document is a Nonconformance Inspection Report (NCIR) related to a federal contract for the Change of Occupancy Cleaning and Painting of Army Family Housing (AFH) at USAG Daegu.

The key details are:

  • The report number is 00001, issued under Contract W91QVN-00-P-0000, Delivery Order 0001 for the Unit #Tower #1 at USAG Daegu.
  • The report identifies nonconformance conditions that the contractor, Korean Construction Co. Ltd, must repair by 14 Sep 19 per the contract specifications.
  • The contractor must correct the identified issues and return the completed NCIR form to the DPW Housing Facilities Management Branch at USAG Humphreys, Building 309.
  • Upon completion, the Contracting Officer's Representative (COR) will review and provide comments on the report.

The related federal contract opportunity is for Preventive Maintenance (PM), Repair, and Cleaning Service at Army Family Housing, Camp Walker, with a solicitation number of W90VN924R0024. The solicitation closes on 28 Jun 2024.

View the file

Other files

File Type Posted
Amendment 0001 to 24R0024.pdf PDF
Technical Exhibit 18 Tower1 Custodial Drawing.pdf PDF
Technical Exhibit 21 Tower1 Elec Drawing 1.pdf PDF
Technical Exhibit 26 Tower2 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 5 Vacant Qtrs Montly Report.docx DOCX document
Technical Exhibit 27 Tower2 Ground Maintenance Map.pdf PDF
Attachment-ELIN List for CLIN X022.pdf PDF
Technical Exhibit 53 Tower4 Mech and Plumbing Drawing 3.pdf PDF
Technical Exhibit 14 Contract Descepancy Report (CDR).pdf PDF
Technical Exhibit 33 Tower2 Bed Type Drawing.pdf PDF
Technical Exhibit 25 Tower2 Custodial Drawing.pdf PDF
Technical Exhibit 30 Tower2 Elec Drawing-3.pdf PDF
AFH-Maintenance_Exhibit-list.docx DOCX document
Technical Exhibit 4 Monthly Service Order Report.docx DOCX document
Technical Exhibit 8 COP Check List.docx DOCX document
Technical Exhibit 17 Check Lists.docx DOCX document
RFP-W90VN924R0024.pdf PDF
Technical Exhibit 40 Tower3 Mech and Plumbing Drawing 1.pdf PDF
Technical Exhibit 6 Quality and Standards of Work.docx DOCX document
Technical Exhibit 46 Tower4 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 50 Tower4 Elec Drawing 2.pdf PDF
Technical Exhibit 31 Tower2 Elec Drawing 4.pdf PDF
Technical Exhibit 11 Daily Contract Inspection Report.docx DOCX document
Technical Exhibit 51 Tower4 Mech and Plumbing Drawing 1.pdf PDF
Technical Exhibit 47 Tower4 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 22 Tower1 Elec Drawing-2.pdf PDF
Technical Exhibit 16 COM Monthly Report.xlsx XLSX spreadsheet
Technical Exhibit 20 Tower1 Ground Maintenance Map.pdf PDF
Technical Exhibit 48 Tower4 Ground Maintenance Map.pdf PDF
Technical Exhibit 28 Tower2 Elec Drawing-1.pdf PDF
Technical Exhibit 43 Tower3 Bed Type Drawing.pdf PDF
Technical Exhibit 1 PRS.docx DOCX document
Technical Exhibit 13 Contract Reminder.docx DOCX document
Technical Exhibit 45 Tower4 Custodial Drawing.pdf PDF
Technical Exhibit 3 Scheduled Services.docx DOCX document
Technical Exhibit 52 Tower4 Mech and Plumbing Drawing 2.pdf PDF
Technical Exhibit 2 Deliverables.docx DOCX document
Technical Exhibit 37 Tower3 Ground Maintenance Map.pdf PDF
Technical Exhibit 54 Tower4 Bed Type Drawing.pdf PDF
Technical Exhibit 29 Tower2 Elec Drawing-2.pdf PDF
Technical Exhibit 38 Tower3 Elec Drawing 1.pdf PDF
Technical Exhibit 36 Tower3 Exterior Window Cleaning Drawing 2.pdf PDF
Technical Exhibit 41 Tower3 Mech and Plumbing Drawing 2.pdf PDF
Technical Exhibit 35 Tower3 Exterior Window Cleaning Drawing 1.pdf PDF
Technical Exhibit 44 Custodial Working Schedule.docx DOCX document
Technical Exhibit 23 Tower1 Mech and Plumbing Drawing.pdf PDF
Technical Exhibit 7 COC Check List.xlsx XLSX spreadsheet
Technical Exhibit 49 Tower4 Elec Drawing 1.pdf PDF
Technical Exhibit 34 Tower3 Custodial Drawing.Revised.pdf PDF
Technical Exhibit 42 Tower3 Mech and Plumbing Drawing 3.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NONCONFORMANCE INSPECTION REPORT (SEE INSTRUCTIONS ON REVERSE)

PAGE____1____OF___1__PAGES

1. REPORT NUMBER

00001

2. CONTRACT NUMBER
3. DELIVERY ORDER NUMBER
4. BUILDING/FACILITY NUMBER
5. CONTRACT NAME
6. CONTRACTOR
W91QVN-00-P-0000
0001
UNIT#

Tower#1

Change of Occupancy Cleaning and Painting of (AFH), USAG Daegu
Korean Construction Co. Ltd
7. SPECIFICATION NUMBER
8. SERVICE ORDER NUMBER
9. LOCATION

COP/COC

N/A USAG Daegu DPW, Housing Div

10. DESCRIPTION OF NONCONFORMANCE CONDITION(S) OR ITEM(S)

(Reference the specifications, page, para, drawing number, as applicable)

14. CONTRACTOR CORRECTIVE ACTION

(Identify date/time of completion; initial each item)

11.

This nonconformance report is issued to you on ________13 Sep 19_________. Contractor to repair Non-conformance items identified in “10”. Return this form to Family Housing, Facilities Management

15. CONTRACTOR REPRESENTATIVE (QC) SIGN AND DATE

Branch, DPW Housing, Building 309.

18/19. INSPECTOR’S SIGNATURE
DATE
by ____14 Sep 19_____________per contract specifications, page no.__234____, para no.____2b(1)_____.
Follow up Inspection

20. COR COMMENTS

12. INSPECTED BY

DATE/TIME
13. TYPE OF INSPECTION

17. REVIEWED BY

DATE
16. DATE/TIME RETURNED
21. COR’S SIGNATURE
DATE

INSTRUCTIONS FOR COMPLETING NONCONFORMANCE INSPECTION REPORT

INSPECTOR’S INSTRUCTIONS (when issuing Nonconformance Report to contractor).

BLOCK 1-9-Fill out all information in these blocks. Mark N/A in blocks which do not apply.
BLOCK 10-Identify and list all nonconformance conditions of inspection. If additional sheets are needed use another Nonconformance Inspection Report and identify as next page. Reference the paragraph (para), page, and drawing number to the nonconformance condition, if applicable. Record any additional remarks pertinent to your inspection.
BLOCK 11-Fill in the date and time you issued the Nonconformance Report to the contractor. Indicate the date and time the contractor has to repair the nonconformance conditions and to return the report to the Housing, Facilities Management Branch. Reference the contact specifications page and paragraph number as it applies to time limit for repairing and/or re-performing service.
BLOCK 12-Sign and date the report.
BLOCK 13-Identify the type of inspection (i.e., Final, Re-Inspection, Change of Occupancy Cleaning (COC), Flooring, Change of Occupancy Painting (COP) etc.

CONTRACTOR’S INSTRUCTIONS (when correcting nonconformance items).

BLOCK 14-Correct nonconformance items. Indicate the date and time that each item/condition listed in Block 10 was corrected. Remark on any condition related to the repair such as extenuating circumstances which may prevent you from performing the corrective action.
BLOCK 15-Contractor Q.C. representative sign and date after the repairs are made. Return the completed report to the Housing, Facilities Management Branch, within the time frame identified in the referenced contract specifications. The Housing, Facilities Management Branch is located at USAG Humphreys, Building 309, telephone (DSN) 753-5798.

INSPECTOR’S INSTRUCTIONS (when receiving Nonconformance Report from contractor).

BLOCK 16-Identify the date and time the contractor returned the form or when the form was received at DPW Housing, Facilities Management Branch.
BLOCK 17-This block is for supervisory review after the form is returned from contractor.

INSPECTOR’S INSTRUCTIONS

BLOCK 18-Perform follow up inspection on rejected items. Indicate date and time of re-inspection (if applicable). Comment on any circumstances. If no follow up inspection is made, indicate not re-inspected.
BLOCK 19-Sign and date. Forward to the COR.

COR’S INSTRUCTIONS

BLOCK 20-Review this report. Add or attach comments. Coordinate input with Contracting Office if required.
BLOCK 21-Sign and date the report. Forward this copy to 411th, CSB, Humphrey’s office, Contract Administrator if required.