Technical Exhibit 27 Tower2 Ground Maintenance Map.pdf

PDF 3 MB Posted

Attached to
Preventive Maintenance (PM), Repair, and Cleaning Service at Army Family Housing, Camp Walker
Solicitation number
W90VN924R0024
Issued by

About this file

This document is a Technical Exhibit that provides a map and details for the ground maintenance requirements at Tower 2 under a federal contract opportunity. The total area to be maintained is 10,000 square meters, which includes 3,000 square meters of policing area and 2,516.59 square meters of grass cutting area. The grass cutting area is located outside of the tower and on the 3rd floor of the parking tower. The document also includes leaf raking and policing requirements. The related federal contract opportunity is Solicitation Number W90VN924R0024 for Preventive Maintenance (PM), Repair, and Cleaning Service at Army Family Housing, Camp Walker, with a closing date of June 28, 2024.

View the file

Other files

File Type Posted
Amendment 0001 to 24R0024.pdf PDF
Technical Exhibit 18 Tower1 Custodial Drawing.pdf PDF
Technical Exhibit 21 Tower1 Elec Drawing 1.pdf PDF
Technical Exhibit 26 Tower2 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 5 Vacant Qtrs Montly Report.docx DOCX document
Attachment-ELIN List for CLIN X022.pdf PDF
Technical Exhibit 53 Tower4 Mech and Plumbing Drawing 3.pdf PDF
Technical Exhibit 14 Contract Descepancy Report (CDR).pdf PDF
Technical Exhibit 33 Tower2 Bed Type Drawing.pdf PDF
Technical Exhibit 25 Tower2 Custodial Drawing.pdf PDF
Technical Exhibit 30 Tower2 Elec Drawing-3.pdf PDF
AFH-Maintenance_Exhibit-list.docx DOCX document
Technical Exhibit 4 Monthly Service Order Report.docx DOCX document
Technical Exhibit 8 COP Check List.docx DOCX document
Technical Exhibit 17 Check Lists.docx DOCX document
RFP-W90VN924R0024.pdf PDF
Technical Exhibit 40 Tower3 Mech and Plumbing Drawing 1.pdf PDF
Technical Exhibit 6 Quality and Standards of Work.docx DOCX document
Technical Exhibit 46 Tower4 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 50 Tower4 Elec Drawing 2.pdf PDF
Technical Exhibit 31 Tower2 Elec Drawing 4.pdf PDF
Technical Exhibit 11 Daily Contract Inspection Report.docx DOCX document
Technical Exhibit 51 Tower4 Mech and Plumbing Drawing 1.pdf PDF
Technical Exhibit 47 Tower4 Exterior Window Cleaning Drawing.pdf PDF
Technical Exhibit 22 Tower1 Elec Drawing-2.pdf PDF
Technical Exhibit 16 COM Monthly Report.xlsx XLSX spreadsheet
Technical Exhibit 20 Tower1 Ground Maintenance Map.pdf PDF
Technical Exhibit 48 Tower4 Ground Maintenance Map.pdf PDF
Technical Exhibit 28 Tower2 Elec Drawing-1.pdf PDF
Technical Exhibit 43 Tower3 Bed Type Drawing.pdf PDF
Technical Exhibit 1 PRS.docx DOCX document
Technical Exhibit 13 Contract Reminder.docx DOCX document
Technical Exhibit 45 Tower4 Custodial Drawing.pdf PDF
Technical Exhibit 3 Scheduled Services.docx DOCX document
Technical Exhibit 52 Tower4 Mech and Plumbing Drawing 2.pdf PDF
Technical Exhibit 2 Deliverables.docx DOCX document
Technical Exhibit 37 Tower3 Ground Maintenance Map.pdf PDF
Technical Exhibit 54 Tower4 Bed Type Drawing.pdf PDF
Technical Exhibit 12 Sample NCIR.docx DOCX document
Technical Exhibit 29 Tower2 Elec Drawing-2.pdf PDF
Technical Exhibit 38 Tower3 Elec Drawing 1.pdf PDF
Technical Exhibit 36 Tower3 Exterior Window Cleaning Drawing 2.pdf PDF
Technical Exhibit 41 Tower3 Mech and Plumbing Drawing 2.pdf PDF
Technical Exhibit 35 Tower3 Exterior Window Cleaning Drawing 1.pdf PDF
Technical Exhibit 44 Custodial Working Schedule.docx DOCX document
Technical Exhibit 23 Tower1 Mech and Plumbing Drawing.pdf PDF
Technical Exhibit 7 COC Check List.xlsx XLSX spreadsheet
Technical Exhibit 49 Tower4 Elec Drawing 1.pdf PDF
Technical Exhibit 34 Tower3 Custodial Drawing.Revised.pdf PDF
Technical Exhibit 42 Tower3 Mech and Plumbing Drawing 3.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

장대호 텍스트박스 TOTAL 10000 m2 ( = 107639 f2)

사각형

Leaf Raking and Policing Area

1273986720.LN

Text Box

TECHNICAL EXHIBIT-27

Tower#2 Ground maintenance Map (1 of 6)

Policing Area : 3000 m2 (=32291.7 ft2)

1273986720.LN

Text Box

Tower#2 Ground maintenance Map (2 of 6)

장대호 텍스트박스 Policing Area :

3000 m2 (=32291.7 ft2)

1273986720.LN

Text Box

Tower#2 Ground maintenance Map (3 of 6)

장대호 텍스트박스 Policing Area :

3000 m2 (=32291.7 ft2)

1273986720.LN

Text Box

Tower#2 Ground maintenance Map (4 of 6)

GRASS CUTTING AREA: OUTSIDDE + 3rd floor in Parking Tower 1866.15+650.44=2516.59m2 (=27088.3 f2)

장대호 사각형

장대호 텍스트박스

GRASS CUTTING AREA

1273986720.LN

Text Box

Tower#2 Ground maintenance Map (5 of 6)

장대호 텍스트박스

GRASS CUTTING AREA

1273986720.LN

Text Box

Tower#2 Ground maintenance Map (6 of 6)

Tower2_Leaf Raking and Policing Area
111
11
22
33
Tower2_Ground mailtenance
1
2

File details come from the government source that posted it. Updated .