TE 17B Attachment - SOW Example for 31-100 persons project.pdf

PDF 302 KB Posted

Attached to
Internal Revenue Service (IRS), Office of Facilities Management/Security Services (FMSS), Logistics Services RFP No. 2032H8-23-R-00004
Solicitation number
2032H8-23-R-00004
Issued by

About this file

This statement of work outlines logistics services required to support a relocation project for the Internal Revenue Service. The contractor will provide labor, equipment, and supervision to dismantle and reinstall furniture at two IRS locations, transport items to an off-site warehouse, and make post-move adjustments. The project involves moving 31 employees from one building to another in two phases from March 2023 through July 2023. Services include preparing the new location by moving workstations and storage units, then relocating employees' desks, files, and other items. The contractor must verify quantities, inspect sites, and submit an inventory. Insurance documentation and security protocols are also specified.

The related solicitation is for ongoing logistics support services for the IRS, including warehousing, transportation, repairs and work order processing to support approximately 88,000 employees across 500 offices. Services must provide automated inventory management, reliable support for IRS operations, flexibility to adapt to changing needs, timely delivery of property, and cost effectiveness. The contract will be awarded under FAR Part 15 procedures with NAICS code 493110 and a $34 million size standard. The incumbent contract is also cited.

View the file

Other files

File Type Posted
Government Responses to Follow-up Questions for RFP No. 2032H8-23-R-00004 - Amendment 0005.xlsx XLSX spreadsheet
II_2 - RFP No. 2032H8-23-R-00004 - Amendment 00005 SF30.pdf PDF
II_2 - RFP Attachment J-8 - Past Performance Questionnaire - 6-20-23.docx DOCX document
II_2 - RFP No. 2032H8-23-R-00004 - Amendment 00004 - Signed SF30.pdf PDF
Government Responses to Additional Questions for RFP No. 2032H8-23-R-00004.xlsx XLSX spreadsheet
II_2 - RFP No. 2032H8-23-R-00004 - Amendment 00003 SF30 - 6-15-2023.pdf PDF
II_2 J3 - Brookhaven 2015-4157 - 6-9-23.pdf PDF
II_2 - RFP Attachment J-12 - Contractor Onboarding Job Aid for Post-Award Orientation Meeting.docx DOCX document
II_2 J3 - Atlanta 2015-4471 - 6-9-23.pdf PDF
II_2 - RFP Attachment J-11 - Contractor Employee On-Boarding Requirements.docx DOCX document
II_2 - RFP Attachment J-8 - Past Performance Questionnaire - 6-9-23.docx DOCX document
II_2 J3 - Andover 2015-4049.pdf 6-9-23.pdf PDF
II_2 J3 - Main IR and New Carrollton 2015-4281 - 6-9-23.pdf PDF
TE 01 Campus Radius Maps - Amendment 00002.zip ZIP file
II_2 J3 - Philadelphia 2015-4233 - 6-9-23.pdf PDF
II_2 - RFP Attachment J-3 - Department of Labor Wage Determinations - Amendment 0002.docx DOCX document
II_2 - RFP No. 2032H8-23-R-00004 - Amendment 00002 Signed SF30.pdf PDF
Government Responses to Contractor Questions for RFP No. 2032H8-23-R-00004 - FMSS Logistics Services.xlsx XLSX spreadsheet
II_2 J3 - Martinsburg 2015-4297 - 6-9-23.pdf PDF
II_2 - RFP No. 2032H8-23-R-00004 - Amendment 00001 - Signed SF30.pdf PDF
II_1 - RFP Attachment J-10 - AMIS Security Controls.pdf PDF
TE 11 Government Furnished Property and Equipment.docx DOCX document
TE 09 ERC Call Types Descriptions and Cycle Times.docx DOCX document
TE 14 Decision Based Receiving Example.xlsx XLSX spreadsheet
II_1 - RFP Attachment J-6 - Acronyms.pdf PDF
J-5 WD for Andover 2015-4049.pdf PDF
TE 06 Transportation Workload.xlsx XLSX spreadsheet
TE 17A Attachment - SOW Example for 16-30 persons project.pdf PDF
TE 13 UNICOR Locations for IT Disposal.docx DOCX document
II_1 - RFP Attachment J-9 - Compliance Matrix.docx DOCX document
J-5 WD for Martinsburg 2015-4297.pdf PDF
J-5 WD for Atlanta 2015-4471.pdf PDF
J-5 WD for Covington 2015-4719.pdf PDF
II_1 - RFP Attachment J-7 - Definitions.pdf PDF
TE 07 Campus Workload.docx DOCX document
J-5 WD for Fresno 2015-5609.pdf PDF
TE 04 Volumes of Property Stored in Warehouse.xls XLS spreadsheet
J-5 WD for Austin 2015-5215.pdf PDF
TE 17 Real Estate Project Work.docx DOCX document
TE 03 Warehouse Workload Table landscape.docx DOCX document
TE 12 Government Furnished Facilities.rtf RTF text file
J-5 WD for Detroit 2015-4839.pdf PDF
II_1 - RFP Attachment J-4A - Small Business Participation (Commitment Proposal).docx DOCX document
J-5 WD for Main IR and New Carrollton 2015-4281.pdf PDF
TE 02 IRS Building List FFP CPFF.xlsx XLSX spreadsheet
II_1 - RFP Attachment J-1 - Section B CLIN Scenarios and Sample Costs Breakdown.docx DOCX document
II_1 - RFP Attachment J-2 - Grand Total Summary Schedule.xlsx XLSX spreadsheet
II_1 - RFP Attachment J-4B - Subcontracting Plan (SF 1019A).docx DOCX document
J-5 WD for Memphis 2015-4673.pdf PDF
II_1 - RFP Attachment 1 - QASP for FMSS Logistics Services.docx DOCX document
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOVE SERVICES STATEMENT OF WORK

Project Title: FRE-CA7333 CA-NEW Acq RentRedux Project Number: FRE2220505

Internal Revenue Service Fresno Internal Revenue Service FMSS Project POCs – Kings Canyon Pavillon (KCP) - Celia Smoljan; Northpointe (NP) Greg Smith and Irene Cruz

SCOPE OF WORK

DATE:

PROJECT TITLE: FRE-CA7333 CA-NEW Acq RentRedux

PROJECT LOCATIONS:

Kings Canyon Pavilion – 4967 E. Kings Canyon, Fresno/CA 93727 Northpointe – 3211 S. Northpointe Dr., Fresno/CA 93725

Warehouse – 5425 E Home Ave. # 107/108, Fresno, CA 93727

PROJECT SUMMARY:

Fresno FMSS staff will release Lease CA7333, Kings Canyon Pavilion on 07/31/2023. FMSS’ intent is to relocate (31) SBSE Civil Enforcement Advice & Support Operations (CEASO) employees and their equipment into existing workstations at CA7226, Northpointe (NP). Consolidation of current NP Business groups, SBSE Exam & SBSE Collection is necessary to accommodate the relocated CEASO employees.

Period of Performance (POP) is , 202 , through 21, 2023

GENERAL SCOPE OF WORK

1. REQUIREMENTS

Contractor is responsible for verification of all work and inventory included in this scope of work (SOW) and all required for quotes. Visually verify the types and quantities of items to be moved, disassembled, and dismounted prior to submitting a proposal. Verify what specialty skills, tools, equipment, supplies, and protection are necessary to ensure all items are delivered in the same condition they were in before the move.

Contractor to provide all labor, supplies, packing materials, equipment and supervision needed to de-install and relocate all items identified in this SOW. All work shall be performed in a workmanlike, efficient, safe, and secure manner, with care taken to protect existing building conditions and work that may still be in place.

Project Number: FRE2220505

2. SITE INSPECTION

The contractor is required to inspect the site prior to submitting a proposal. Failure to inspect the premises will not constitute grounds for a claim after the contract is awarded. Coordinate with the Project Manager for access. Field-verify existing and proposed conditions, all quantities included in this scope of work and all dimensions critical to proper completion of the work.

The Contractor and the contractor’s on-site supervisor/team leader shall visit the sites for a pre-move meeting 10 days after award and 1 week prior to project commencement to clarify any questions.

3. SCHEDULE

Move services shall be conducted in 2 phases. Proposed dates and times for services are as follows (subject to change):

Phase 1: 3, 2023, through 10, 2023 – Prepare Northpointe site for CEASO move. .

Phase 2: 17, 2023, through 21, 2023 – Move 30 CEASO employees with their furniture and equipment from KCP to NP. Task 2 work to be performed on weekends.

Tasks #3 and #4 to be performed to during normal working hours, 7:30am-4:00pm.

Phase 1 – CEASO - NorthPointe (NP) Move Preparation - through 3 All TASKS to

Contractor shall at (NP):

Provide a certified electrician to disconnect 4 power pole electrical whips from workstations terminating at ceiling (top of the power poles).

Remove all data lines from the indicated 1 workstations, terminating 17 of them on the top of the corresponding power poles.

Relocate one power pole and 4 data cables to 4 reinstalled workstations as indicated on the supplied drawing.

Add duplex outlet to existing power pole that is in front of workstations 1531 and 1532.

Remove 1 wall mounted electrical whip and replace with a quadplex electric outlet.

Contractor shall at (NP):

Provide a certified Herman Miller (HM) furniture installer to Disassemble 1 Herman Miller AO2 workstations.

Separate and inventory components by size and type, identifying powered and non-powered panels, Prepare all for shipment to storage2 using pallets, Gaylord boxes, and shrink wrap.

Project Title: FRE-CA7333 CA- Project Number: FRE2

Display outside of each pallet/box a label showing an identification number and its inventory.

Submit inventory to Project Manager (PM) in Excel format at completion of this phase task.

Transport to the warehouse during business hours.

Contractor shall at (NP):

Disassemble ( O.96 and (1) W.48 HAWORTH UNIGROUP workstations.

Separate components by type, palletize, shrink wrap, and store on-site as indicated on floorplan.

Contractor shall at (NP):

Prepare ( ) 4-DR file cabinets for shipment to storage using pallets, shrink wrap and strapping.

Label each pallet with an identification number and its inventory.

Submit inventory to Project Manager (PM) in Excel format at completion of this phase task.

Transport to the warehouse for storage during business hours.

Contractor shall at (NP):

Relocate and install 4 of the disassembled HM workstations as indicated on the supplied drawing.

Contractor shall at (NP):

Disassemble (1) HAWORTH UNIGROUP, 32’x10’ storage room.

Separate and inventory components by size and type, identifying powered and non-powered panels, Prepare all for shipment to storage using pallets, Gaylord boxes and shrink wrap.

Display outside of each pallet/box a label showing an identification number and its inventory.

Submit inventory to Project Manager (PM) in Excel format at completion of this phase task.

Transport to the warehouse during business hours.

Contractor shall at (NP):

Disassemble (1) HAWORTH UNIGROUP O.96 workstation and 2 touchdown workstations.

Reinstall onsite the O.96 workstation inside FMSS/IT room #124 as indicated on floor plan.

Project Title: FRE-CA7333 Project Number: FRE222

v) Inventory and prepare the 2 touchdown workstations for shipment and transport to the warehouse.

Phase 2- CEASO - Kings Canyon Pavilion (KCP) move to (NP) - /17/23 through /2023

Phase 2: TASK 2 to be performed on weekends.

Tasks 3 and 4 to be performed during business hours (7: 0-4:30pm).

Contractor Shall at (KCP):

Shrink wrap and transport 62 U-Line wire shelving mobile carts with their files from the KCP location to the NorthPointe (NP) location and place as indicated on drawing.

IRS will number all mobile shelving units to correspond to the numbers on the Northpointe floorplan for placement at the (NP) location.

Contractor shall at (KCP):

Transport ( ) 6’x4’ tables, ( ) 4 tier cabinets and approximately (150) boxes and e-crates and all miscellaneous tagged items such as, carts, chairs, foot stools, white boards, printers, IT equipment, etc., to NP location and place as indicated on floorplan.

Work to be performed after hours (after 4:30pm) and/or on the weekend.

Contractor Shall at KCP:

Disassemble HAWORTH UNIGROUP workstations.

Separate and inventory panels by size, notating if powered or non-powered.

Separate and inventory all other systems components by size and type, work surfaces, overheads, tack boards, etc.

Prepare for shipment by palletizing and shrink wrapping for storage.

Label each pallet/box with an identification number and its inventory.

Submit inventory to Project Manager (PM) in Excel format at completion of this phase.

Transport to the warehouse for storage.

Work to be performed during business hours, 7: 0am-4:00pm.

Post Move Adjustments - Contractor shall at (NP):

Provide labor and equipment on 2/ /2023 following the Phase 2 CEASO move to correct punch list items, make ergonomic and other minor adjustments.

Pick up and remove all boxes used by employees after the move and plug in electrical cords as needed.

Provide a minimum of two laborers for four hours (8 hours), with an option to add time on an hourly basis.

Work to be performed during business hours, 7:30am-4:00pm.

Project Number: FRE2220505

GENERAL INFORMATION:

BUILDING CONDITIONS

The King’s Canyon Pavilion does not have a delivery dock. All items pick-up at KCP must be delivered through main entrance to front of building or through back door. All items would need to be loaded in to truck by lift gate or by ramp.

The Northpointe building will have 2 docks with electric ramps dedicated for the move services.

Trucks delivering items from KCP must have bed of truck approximately 6’ above the ground to be able to access the adjustable lift gate in the dock.

Warehouse has one delivery dock. Deliveries to the warehouse must be coordinated with the IRS POC.

SPECIAL INSTRUCTIONS

Provide a copy of your company’s Certificate of Insurance with your proposal After hours work will take place on the weekends, 6:00 a.m. to 6:00 p.m.

Business hours work will take place Monday through Friday, 6:00 a.m. to 6:00 p.m.

Workday shall not exceed 12 hours (8-hour workday + 4 hours overtime); any workday beyond the scheduled timeframe must be requested through the Project Manager at least 48 hours in advance Protect all existing work in place: walls, floors, doors, hardware, trim and furnishings. Remove materials after job completion. Field-verify the paths of travel and the protective materials required during site inspection. Any damage caused by the contractor to any government property will be restored to its original condition at the contractor’s expense.

SECURITY

Contractor employees must always carry picture ID when working on the IRS premises.

The vendor shall provide a list of all employees that will be on the site, including truck drivers, to the IRS COTR listed on this order within 3 business days prior to first installation date.

Possession and/or use of firearms, alcoholic beverages, or drugs on Government premises are prohibited.

Vehicles, persons, and property entering Government property are subject to search.

The Contractor will observe all emergency evacuation requirements while on the job.

Project Number: FRE2220505

7. BID REQUIREMENTS

Each proposal must include a pricing summary and/or worksheet with a pricing breakdown as follows:

a) Specify the days and hours needed for each phase of work, as described above, and include the cost for each phase

b) Itemize additional labor costs for after-hour services, if any.

c) Itemize minimum and hourly costs to provide labor on site the day after the CEASO move to correct punch list items and make ergonomic and other minor adjustments

d) Provide a copy of your company’s Certificate of Insurance with your proposal.

File details come from the government source that posted it. Updated .