This is Bid Amendment #5 to the Enhanced Digital Driver's License (EDDL) and Central Issuance procurement (Bid Solicitation #25DPP01124 T2466) issued by the State of New Jersey Department of the Treasury, Division of Purchase and Property. The amendment extends the quote submission deadline from September 17, 2025 to October 8, 2025 at 2:00 p.m. Eastern Time and provides answers to 195 electronic bidder questions, attendee lists from the February 25, 2025 optional site visit and February 27, 2025 optional pre-quote conference, and four new exhibits detailing network architecture diagrams, EDDL locations, service level agreements, and current vendor-supplied hardware specifications. The procurement seeks a comprehensive cloud-based solution to develop, implement, and operate an enhanced digital driver's license system that processes approximately 1.5 million licenses and 1 million change requests annually across 46 Agency and Regional Service Center locations and 360 Image Capture Stations. Key deliverables include an Image Capture Application with Image Retrieval System, Central Issuance and Over-the-Counter Card Issuance System, Central Image Repository, and Image Management System supporting both centralized and decentralized card production. The base contract term is seven years with three optional one-year extensions, and the contractor must provide a $5,000,000 performance security bond.

Pricing must be submitted on the State-Supplied Price Sheet as firm-fixed costs with no CPI adjustments; estimated annual volumes include 2.8 million centrally printed credentials, 140,000 over-the-counter cards, and initial procurement of 400 Image Capture Application workstations with 10 percent spare inventory, all new equipment with hardware refreshes anticipated at years four and seven based on manufacturer recommendations not exceeding five-year cycles. The procurement includes a Small Business Subcontracting Set-Aside requirement with a 25 percent good faith effort goal for subcontracting with certified small businesses, though no specific target percentages apply to individual subcategories; bidders must make good faith efforts and may accept specialized services that preclude additional small business subcontracting. All card manufacturing, including card bodies and New Jersey-specific security features, must be performed within the United States. The State will provide existing workstations (Dell OptiPlex 7000 Micro units), Microsoft Dynamics 365 Commerce licenses, physical backdrops, temporary credential printers, receipt printers, cash drawers, and HP M611 printers; contractors must supply new signature pads, cameras, uninterrupted power supplies, over-the-counter card printers, and complete software and integration services. Payment terms follow New Jersey's 60-day standard with 10 percent retainage released upon satisfactory performance certification by the State Contract Manager, and retainage does not apply to third-party delivery costs or card inventory line items.

View the file

Other files

File Type Posted
T2466 Revised Bid Solicitation 7.29.25.pdf PDF
T2466 Revised Bid Solicitation 9.5.25~2.docx DOCX document
T2466 Bid Amendment 3 6.11.25.docx DOCX document
T2466 Revised Bid Solicitation 5.8.25~1.pdf PDF
T2466 Bid Amendment 8 10.21.25~2.docx DOCX document
T2466 Bid Amendment 7 10.14.25.docx DOCX document
T2466 Revised Bid Solicitation 2.18.25.pdf PDF
Exhibit A - EDDL Network Architecture Diagrams~4.pdf PDF
T2466 Bid Amendment 4 7.29.25.pdf PDF
T2466 Revised Bid Solicitation 6.11.25.pdf PDF
Attachment 1- State of New Jersey Standard Terms and Conditions 2.8.2024.pdf PDF
State-of-New-Jersey_Third-Party-Information-Security-Questionnaire_NDA_2024.pdf PDF
Exhibit C - EDDL SLAs~4.docx DOCX document
T2466 Bid Amendment 2 5.8.25~1.pdf PDF
Attachment 2- Standard Procurement Forms Packet.pdf PDF
Attachment 3- T2466 Revised State-Supplied Price Sheet 10.21.25.xlsx XLSX spreadsheet
T2466 Bid Amendment 6 9.25.25.docx DOCX document
T2466 Revised Bid Solicitation 10.14.25.docx DOCX document
Exhibit D - Current Vendor Supplied Hardware~3.docx DOCX document
Attachment 3- State Supplied Price Sheet - EDDL 2.11.25.xlsx XLSX spreadsheet
T2466 Revised Bid Solicitation 9.25.25~1.docx DOCX document
Exhibit B - EDDL Locations~4.docx DOCX document
T2466 Bid Amendment 1 2.18.25~6.docx DOCX document
T2466 Optional PreQuote Conference PowerPoint~1.pptx PPTX presentation
T2466 Bid Solicitation 2.11.25~2.pdf PDF
T2466 Revised Optional Pre-Quote Conference PowerPoint 2.18.25.pptx PPTX presentation
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHILIP D. MURPHY

Governor State of New Jersey

DEPARTMENT OF THE TREASURY

DIVISION OF PURCHASE AND PROPERTY

PROCUREMENT BUREAU

33 WEST STATE STREET

P. O. BOX 230

TRENTON, NEW JERSEY 08625-0230

ELIZABETH MAHER MUOIO

State Treasurer

TAHESHA L. WAY

Lt. Governor

AMY F. DAVIS, ESQ.

Acting Director https://www.njstart.gov

9/5/2025

To:All Interested Bidders
Re:Bid Solicitation # 25DPP01124

T2466- Enhanced Digital Driver’s License

Current Quote Submission Due Date: September 17, 2025 (2:00 p.m. Eastern Time)
REVISED Quote Submission Due Date: October 8, 2025 (2:00 p.m. Eastern Time)

Bid Amendment #5

The following constitutes Bid Amendment #5 to the above referenced Bid Solicitation:

· Answers to electronic Bidder questions submitted during the first Electronic Question and Answer period;

· The Quote Submission Due Date has been extended from Wednesday, September 17, 2025 to Wednesday, October 8, 2025;

· A list of attendees who attended the Optional Site Visit held on February 25, 2025;

· A list of attendees who attended the Optional Pre-Quote Conference held on February 27, 2025;

· New exhibits attached to the attachments tab:

· Exhibit A – T2466 EDDL Network Architecture Diagrams;

· Exhibit B – T2466 EDDL Locations;

· Exhibit C – T2466 EDDL SLAs; and

· Exhibit D- T2466 Current Vendor Supplied Hardware.

· A revised Bid Solicitation entitled, “T2466 Revised Bid Solicitation 9.5.25.”

· Please note that for all additions, deletions, clarifications, and modifications to the Bid Solicitation, Bidders should refer to the Revised Bid Solicitation entitled, “T2466 Revised Bid Solicitation 9.5.25” and attached to the Bid Solicitation Attachments Tab in NJSTART. Revised Sections include

· Bid Solicitation, Cover Page, Due Date for 2nd Round Electronic Questions and Quote Opening Date;

· Bid Solicitation, Table of Contents, Sections 5.7 and 5.8;

· Bid Solicitation, Table of Contents, Exhibits A through D;

· Bid Solicitation Section 1.1, title changed from “Purpose, and Intent and Background” to “Purpose and Intent;”

· Bid Solicitation Section 3.19;

· Bid Solicitation Section 3.26;

· Bid Solicitation Section 3.27;

· Bid Solicitation Section 4.3.3; and

· Bid Solicitation Section 4.5.1.

· A revised State-Supplied Price Sheet, entitled, “Attachment 3- T2466 Revised State-Supplied Price Sheet 9.5.25;” and

· A second electronic Question and Answer period has been opened until 2:00 p.m. Eastern Time on September 12, 2025. Questions that will be considered will be limited only to subject matter related to the following:

· The revisions to the Revised Bid Solicitation Sections listed above. Refer to “T2466 Revised Bid Solicitation 9.5.25;”

· The revised State-Supplied Price Sheet entitled, “Attachment 3 – T2466 Revised State-Supplied Price Sheet 9.5.25;” and

· The new exhibits attached to the attachments tab and listed above.

It is the sole responsibility of the Bidder to be knowledgeable of all of the additions, deletions, clarifications, and modifications to the Bid Solicitation and/or the New Jersey Standard Terms and Conditions relative to this Bid Solicitation as set forth in all Bid Amendments.

All other instructions, terms, and conditions of the Bid Solicitation shall remain the same.

Bid Solicitation #25DPP01124 Enhanced Digital Driver’s License

Answers to Questions

Where applicable, each question references the appropriate Bid Solicitation section.

Note: Some questions may have been paraphrased in the interest of readability and clarity.

Question #
Bid Solicitation

Section Reference Question (Bolded) and Answer

1.
PDF Documents
Q: When trying to open a Portable Document Format (PDF), I am receiving an error message and am unable to access the PDF. How should I proceed?

A: It is recommended that users utilize Microsoft Edge to view PDFs. Certain PDF forms cannot be opened in the Chrome or Firefox built in PDF viewers that are enabled by default. If using Chrome or Firefox it is recommended that the file is downloaded instead by clicking the download button in the upper right-hand corner of the browser after an error message is received. An alternative option is to disable the built in PDF viewers in Chrome or Firefox.

2.
Quote Submission
Q: Should I check that I have properly completed and attached all of the required documents with my submitted Quote?

A: Yes. Prior to the Quote Opening Deadline, a Bidder should review the documents comprising the submitted Quote to ensure that all of the required documents have been completed and attached. Oftentimes a Quote is deemed non-responsive because a Bidder fails to attach a required form or attaches a blank form. To review a submitted a Quote, a Bidder should log into NJSTART and review each document attached to the Quote submission. Instructions on how to review a submitted Quote can be found in the Quick Reference Guide entitled How to Review a Submitted Quote, which is available on the NJSTART Vendor Support Page under Vendor Reference Guides.

3.
Quote Submission
Q: Please confirm a Bidder may deliver a hardcopy quote instead of submitting a response electronically.

A: Please be advised that all Quotes shall be submitted electronically through NJSTART.

4.
Exceptions
Q: Will the State allow Bidders to take exception to any of the Standard Terms and Conditions?

A: No, the State will not allow Bidders to take exception to any of the Standard Terms and Condition. Terms and conditions on publicly bid procurements must be consistent for all potential Bidders, and cannot be based on a single vendor’s terms.

5.
MBE Company
Q: Can you please post a list of the companies that were at the pre-quote conference, as we would like to see if we can partner with one of them.

A: This Amendment includes the list of attendees for both the Pre-Quote Conference and the Optional Site Visit for review. Please see Bid Amendment Pages 40 and 41 for the list of attendees.

6.
Optional Site Visit
Q: RFP schedule says 2/25/2024. Please confirm that the date is actually 2/25/2025.

A: The State confirms that the Optional Site Visit was scheduled for February 25, 2025.

7.
Optional Site Visit
Q: Do vendors need to sign up for this visit or just show up at the location, date and time?

A: Bidders do not need to sign up for the Optional Site Visit.

Q: What are any instructions needed for contact on the day of this visit?

A: There are no special instructions needed for the day of the Optional Site Visit.

8.
Optional Site Visit
Q: Is there a limit to the number of people that can attend from each vendor?

A: There is no restriction on the number of attendees from each firm for the Optional Site Visit.

9.
Bid Solicitation - Table of Contents
Q: In the Table of Contents, between Sections 5.7 and 5.8 it states “NOT APPLICABLE TO THIS PROCUREMENT”. Is that statement applicable to the Sections immediately following that statement? Those sections include 5.8 Liquidated Damages, 5.9 Retainage, 5.10 Electronic Payments and 5.11 Procurement Efficiency Program. Do Sections 5.8 through 5.11 apply to this procurement?

A: This was a formatting error in the Table of Contents. The phrase "NOT APPLICABLE TO THIS PROCUREMENT" only applies to Section 5.7, Authorized Dealers and/or Distributors, and Section 5.8, Liquidated Damages. The Table of Contents has been corrected in the revised Bid Solicitation entitled "T2466 Revised Bid Solicitation 9.5.25."

10.
Bid Solicitation, Section Solicitation –Cover Page & Sections 1.1 - Purpose, and Intent and Background
Q: (3.8) The solicitation cover states: “SET-ASIDES Small Business Set-Aside For Goods and Services (3 boxes are checked) and Section 1.1 states: “This procurement is a Small Business Subcontracting Set-Aside.” However, Section 3.8 states: “3.8 SMALL BUSINESS SET-ASIDE CONTRACTS Not applicable to this procurement” Question: Please clarify if a small business set-aside (for subcontracting only) is required.

A: The Bid Solicitation Cover page indicates that this Contract is a Small Business Subcontracting Set-Aside for Categories 1, 2, and 3. Therefore, Section 3.8, Small Business Set-Aside Contracts, is not applicable as the full Contract is not a Small Business Set-Aside. Please see Bid Solicitation Section 3.13.8.1, Small-Business Subcontracting Set-Aside Contract, for more information on subcontracting set-asides goals.

Q: If a small business subcontracting set-aside is required, please provide the set-aside amount, and if it is a target (goal) amount or a fixed (hard requirement) amount.

A: There is no target or fixed amount. Bidders must make a good faith effort to subcontract with a certified small business. Please see Bid Solicitation Section 3.13.8.1, Small Business Subcontracting Set-Aside Contract, for more information.

11.
Bid Solicitation, Section 1.1 - Purpose, and Intent and Background
Q: RFP states: "Additionally, the awarded Contractor must sustain all current EDDL System capabilities, efficiency, security enhancements, manufacturing, production, and distribution at present MVC operational levels while development, testing, and implementation of the new System is conducted and the System is replaced in its entirety.” Question: We assume operating the incumbent's system is not within scope. Please confirm.

A: The State confirms that the Contractor operating the incumbent’s system is not within the scope of this Solicitation.

Q: If the State expects the contract awardee to operate the incumbent's system, please specify how this will be accomplished.

A: The State does not anticipate a need for the contract awardee to operate the incumbent contractor’s system.

12.
Bid Solicitation, Section - 1.1 Purpose, and Intent and Background
Q: The RFP states: "… the awarded Contractor must sustain all current EDDL System capabilities, efficiency, security enhancements, manufacturing, production, and distribution at present MVC operational levels while development, testing, and implementation of the new System is conducted, and the System is replaced in its entirety.” Is the State looking for assurances from the Contractor that the current operation will not be negatively impacted while the new system is being developed or is the State requesting the Contractor to take over the management and operation of the current, existing system, which will have been provided by another Contractor if a new Contractor is being selected?

A: The current operation must continue uninterrupted while the new system is being developed and transitioned to. The contract awardee will not be simply taking over management and operation of the current system.

13.
Bid Solicitation, Section 1.2.1 - Current Program Background
Q: Can the State please provide physical address for all 46 Agency and regional Service Center Locations?

A: Bidders are instructed to carefully review the enclosed Agency location link: NJ Motor Vehicle Commission | Facility Locations

Q: Also, please identify which locations are Over-the-Counter (OTC) print locations.

A: Bidders are advised that final OTC print locations are not available at this time and may be subject to change before, during, and after deployment of any new Contractor provided system resulting from this Solicitation.

14.
Bid Solicitation, Section 1.2.1 - Current Program Background
Q: The RFP states “Due to a necessary 2020 security change, NJ driver licenses are no longer printed in person. NJ State driver’s licenses renewed online or at an Agency location are centrally processed, issued, printed, and mailed to the license holder” Throughout the RFP, in areas such as 4.1.1 D, on Page 17, and 4.3 on Page 19, Over the Counter (OTC) printing capabilities are required of the Contractor. In Section 4.9.2, on Page 29, it states that OTC needs to be made available at 23 MVC locations. The price sheet also requires the Contractor to provide pricing on 140,000 credentials per year that will be issued OTC. If the security change mandates that no driver licenses are printed in person, is there a requirement for OTC production capabilities?

A: Yes, OTC printing capabilities are required and the Contractor must provide such production capability as specified within the Bid Solicitation.

Q: If there is a requirement, can the State provide confirmation that 23 locations and 140,000 credentials per year are accurate numbers?

A: Please see the response to Question #13. Additionally, 140,000 is an estimated quantity and may be subject to change before, during, and after Contract award.

Q: If there is a variation, can the State please update the State-Supplied Price Sheet with the updated number?

A: As stated in Bid Solicitation Section 3.26, State-Supplied Price Sheet Instructions, “where the State-Supplied Price Sheet includes an estimate quantity column, Bidders are advised that estimated quantities may vary throughout the Contract term resulting from this Bid Solicitation. There is no guaranteed minimum or maximum volume for these price lines.” Bidders must fill out the State-Supplied Price Sheet following the instructions in Section 3.26.

15.
Bid Solicitation, Section 1.2.1 - Current Program Background
Q: The RFP states, “An average of 1.5 million licenses are issued annually. Approximately 1 million change requests are also processed each year.” Can the State provide details on the meaning of “change requests” and how they impact the overall volume?

A: Change requests are made up of transactions such as duplicates, upgrades, downgrades, and changes to the biographical data on the license such as name, address, date of birth, etc.

16.
Bid Solicitation, Section 1.2.1 - Current Program Background
Q: What is the difference between Agency and Regional Service Center sites and how they operate?

A: With exception to the Trenton Regional Service Center (TRSC), which is the only Regional Service Center authorized to issue New Jersey State Drivers Licenses, NJMVC Regional Service Centers do not process standard driver license transactions.

Regional Centers are typically responsible for driver history tasks, such a suspensions, restorations, and other services that effect a customer’s driving or registration rights.

17.
Bid Solicitation, Section 1.2.1 - Current Program Background
Q: Please provide a diagram (or equivalent technical specification) for how these current systems operate in conjunction with the Digital Driver’s License System -- Management Operations System, Department of Corrections System, and System that is utilized by New Jersey State Police

A: A visualization of the how current systems operate in conjunction with the Digital Driver’s License System is now attached to the Bid Solicitation as Exhibit A– EDDL Network Architecture Diagrams.

18.
Bid Solicitation, Section 1.2.1 - Current Program Background
Q: "NJ State driver’s licenses renewed online or at an Agency location are centrally processed, issued, printed, and mailed to the license holder." QUESTION: Is MVC moving to full CI with only an OTC receipt being issued in person?

A: Yes - MVC has a hybrid model with the bulk of transactions done centrally with the exception of the OTC printing as specified within the Bid Solicitation.

19.
Bid Solicitation, Section 1.2.1 Current Program Background and Attachment 3 – State-Supplied Price Sheet
Q: The price sheet supplied estimated volumes of 2.8 million issuances per year, plus 140,000 OTC. However, in section 1.2.1 Current Program Background, paragraph 3 states that an average of 1.5 million licenses, plus 1 million change requests are issued annually. QUESTION: So all bidders are estimating from the same card quantity, can the State please explain the significant difference in annual card volume and adjust the price sheet as necessary?

A: The total estimated card volume is approximately 2.8 million per year, which includes 1.5 million new or reissued licenses, 1 million change requests, and an additional 150,000 OTC issuances. The estimated quantity on Price Line #10 has been revised on the revised State-Supplied Price Sheet dated 9.5.25 to reflect 2,500,000.

20.
Bid Solicitation, Section 2.1 - Electronic Question and Answer Period
Q: Will the State consider providing a second round of vendor questions, after the State provides answers, to ensure complete understanding of the requirements and terms?

A: Answers to the Q & A will be posted via Bid Amendment pursuant to Bid Solicitation Section 2.3 Bid Amendments. The State reserves the right, in its sole discretion, to provide one or more rounds of Q & A.

21.
Bid Solicitation, Section 3.12 - Quote Content
Q: The Quote should be submitted with the attachments organized in the following manner: • Forms • Technical Quote • State-Supplied Price Sheet • State of New Jersey Security Due Diligence Third Party Information Security Questionnaire • Oral Presentation Materials Question: Please advise where the response to Section 4. Scope of Work should be placed within the bidders Quote Response. Should it be its own attachment?

A: A Bidder’s response to Section 4, Scope of Work, would be included within the Bidder’s Technical Quote. Please see Bid Solicitation Sections 3.14 – 3.25 for more information on what must or should be included within the Bidder’s Technical Quote.

22.
Bid Solicitation, Section 3.13.6 - Service Performance within the United States
Q: Please confirm that the card blanks (prior to personalization) containing NJ specific security features must be manufactured within the United States.

A: The Card Stock itself may fall outside the requirements of Bid Section 3.13.6 however the process of attaching “NJ Specific Security Features” would need to comply with the requirements.

23.
Bid Solicitation, Section 3.13.8.1 –

Small Business Subcontracting Set-Aside Contract Q: Can the State kindly clarify the specific percentage goal for SBE spend?

A: Pursuant to the information on the Division of Revenue and Enterprise Services web site: The small business set-aside program was established with the goal of awarding 25 percent of state and purchase order dollars to small businesses. Please see the response to Question #10.

24.
Bid Solicitation, Section 3.13.8.1 - Small Business Subcontracting Set-Aside Contract
Q: Will the State accept any SBE (MBE, VBE, WBE) utilization or there are specific targets for each of those categories?

A: The State will accept any Small Business Enterprise (SBE) registered with the State of New Jersey – Division of Revenue and Enterprise Services.

25.
Bid Solicitation, Section 3.13.8.1 -Small Business Subcontracting Set-Aside Contract
Q: Can the State kindly share evaluation criteria related to SBE compliance and good faith effort?

A: Any Bidder planning to subcontract must submit a Subcontractor Utilization Plan and follow the steps outlined in Section 3.13.8.1, Subsections A through E, of the revised Bid Solicitation entitled, "T2466 Revised Bid Solicitation 9.5.25." There is no specific evaluation criteria related to SBE compliance and good faith effort. The Bidder should include the level of detail it determines necessary for evaluation.

26.
Bid Solicitation, Section 3.13.8.1 -Small Business Subcontracting Set-Aside Contract
Q: If the bidder has identified an eligible NJ small business for subcontracting, however only a portion of the set-aside (25%) can be met due to the specialized nature of the products or services. Are best efforts to identify more NJ small businesses still required even though the set aside % available will not increase?

A: The set aside requires only that a Bidder show its best efforts to retain an eligible small business for subcontracting. If the nature of the service / products preclude such a selection than the Bidder can so state.

27.
Bid Solicitation, Section 3.13.8.1 - Small Business Set-Aside Contracts
Q: This section states “Not applicable to this procurement” whereas section 3.13.8.1 provides details on the SBE utilization. Pls. Confirm if Section 3.13.8.1 is applicable for this solicitation.

A: Section 3.8 is marked as "Not applicable to this procurement" because this contract is not a full Small Business Set Aside. However, Section 3.13.8.1 is applicable, as there is a Subcontracting Only Set-Aside available for Small Business Enterprises (SBEs).

28.
Bid Solicitation, Section 3.14 -Technical Quote
Q: The Bidder’s detailed approach and methodology (Work Product) proposed for each core component and/or key element, including...(C) Its technical assessment and report on the current MVC EDDL system. Question: Please confirm that the solicitation deliverable is the bidder’s methodology and approach to perform the assessment?

A: Yes, the solicitation deliverable includes the Bidder's methodology and approach to performing the technical assessment and report on the current MVC EDDL system.

29.
Bid Solicitation, Section 3.14 - Technical Quote
Q: The Bidder’s detailed approach and methodology (Work Product) proposed for each core component and/or key element, including...(C) Its technical assessment and report on the current MVC EDDL system. Question: Please confirm that the actual assessment and report deliverable will be done after award?

A: The Optional Pre-Quote Site Visit, Optional Pre-Quote Conference, and information provided within this Bid Solicitation should provide enough of an overview for each Bidder to prepare a draft report of its observations for submittal to the State in response to this Bid Solicitation. Each Bidder’s Quote is expected to present and highlight its system capabilities and identify a “best fit” suitability between its proposed system and the needs of the State detailed within the subject Bid Solicitation.

30.
Bid Solicitation, Section 3.14 - Technical Quote
Q: The Bidder’s detailed approach and methodology (Work Product) proposed for each core component and/or key element, including...(C) Its technical assessment and report on the current MVC EDDL system. Question: If the assessment and report are to be submitted with the bidder’s solicitation response, what additional supporting documentation will MVC provide to bidders to fulfill this requirement?

A: Please see the response to Question #29.

31.
Bid Solicitation, Section 3.14 - Technical Quote
Q: The Bidder’s detailed approach and methodology (Work Product) proposed for each core component and/or key element, including...(F) Its LAN/WAN network configuration review plan and recommended modifications. Question: Please confirm that the solicitation deliverable is the bidder’s methodology and approach to perform the network configuration review?

A: Yes, the solicitation deliverable includes the Bidder's methodology and approach to performing the LAN/WAN network configuration review and recommending modifications.

32.
Bid Solicitation, Section 3.14 - Technical Quote
Q: The Bidder’s detailed approach and methodology (Work Product) proposed for each core component and/or key element, including... (F) Its LAN/WAN network configuration review plan and recommended modifications. Question: Please confirm that the actual network configuration review plan and recommended modifications deliverable will be due after award?

A: Yes, the actual network configuration review plan and recommended modifications deliverable will be due after Contract award. A draft plan is required with the Technical Quote.

33.
Bid Solicitation, Section 3.14 - Technical Quote
Q: The Bidder’s detailed approach and methodology (Work Product) proposed for each core component and/or key element, including... (F)Its LAN/WAN network configuration review plan and recommended modifications. Question: If the network configuration review and recommended modifications are to be submitted with bidders’ solicitation response, what additional supporting documentation will MVC provide to bidders to fulfil this requirement?

A: Please see the response to Question #29.

34.
Bid Solicitation, Section 3.18 -Mobilization Plan
Q: Please confirm that the expected outcome at the end of the mobilization plan is the start of the execution of the implementation phase of the contract?

A: Yes, the implementation phase would follow mobilization.

35.
Bid Solicitation, Section 3.18 -Mobilization Plan
Q: The RFP states: “Each Bidder shall include as part of its Quote a mobilization plan, beginning with the date of notification of Contract award and lasting no longer than 13 weeks.” Given that the period between notification of award to contract signature is unknown, especially given any potential protests that could arise, will the State reconsider the wording to “…beginning with the date of Contract Signature”?

A: . The language in in Bid Solicitation, Section 3.18 -Mobilization Plan requires that the Bidders submit – with its Quote – such a Mobilization Plan. The Plan will last no longer than 13 weeks. Any Protest Period will not be calculated in this 13 week period.

36.
Bid Solicitation, Section 3.18 -Mobilization Plan
Q: (PDF page 16 / 62) Please confirm the 13-week mobilization period is in addition to and precedes the 180-day overall delivery timeframe.

A: Yes, NJMVC anticipates the preceding 13-week mobilization period is in addition to the revised 365-day overall delivery timeline listed in the Bid Solicitation, Section 3.19 (C), Additional Plans.

37.
Bid Solicitation, Section 3.18 -Mobilization Plan
Q: (PDF page 16 / 62) Please clarify what is meant by mobilization period of the contract to be completed within 13 weeks of Contract Award. Is this meant to be have completed all program planning and completion of the baseline Execution plan for actual Design/Development and Implementation?

A: Please see the response to Question #36.

38.
Bid Solicitation, Section 3.18 -Mobilization Plan
Q: (PDF page 16 / 62) Please identify the associated deliverable item(s) to be submitted as evidence of completion of each task and/or subtask to successfully complete the 13-week Mobilization Period (i.e.) all final approved Program Management Plans.

A: Section 3.18A identifies the key deliverable item as “A detailed timetable for the mobilization period of 13 weeks.” The Bidder should deliver this timetable and address each action and individual personnel responsible for completing each step of the Mobilization Plan during its 13-week duration. The State advises Bidders to identify each task it intends to perform along with its respective start and completion date.

39.
Bid Solicitation, Section 3.18 -Mobilization Plan and Section 3.19 -Additional Plans
Q: (PDF pages 16-17) In order to reduce risk to the State that may be introduced with an implementation timeline that is too accelerated, would the State be willing to have a deep dive with each vendor to discuss dependencies and requirements gathering? This process would assist in reducing risk and ensuring a more appropriately designed deployment timeline.

A: No, the State will meet with the awarded Contractor after Contract award, but will not conduct any meetings with Bidders prior to Quote opening and/or Contract award. Bidders must submit their draft plans based off the information provided within the Bid Solicitation. Additionally, please see the response to Question #36.

40.
Bid Solicitation, Section 3.19 -Additional Plans
Q: Under “C”, the RFP states: “The implementation plan: The Bidder must describe its plans for system roll-out including System Pilot Testing and full deployment, beginning with the Contract effective date and lasting no longer than 180 days;” Can the State please provide a timeline schedule expectation from Contract Signature through full deployment?

A: The State expects the Bidder to propose the Contract Schedule per Section 3.17, Contract Schedule, including the mobilization and implementation periods. The States expectation is, and Bidders are advised to submit a commercially reasonable contract schedule using MS Project or equivalent project management tool which as a Contractor it can fully support and deliver each completed task to the State on time with no measurable deviation

41.
Bid Solicitation, Section 3.19 -Additional Plans & Section 4.1.1 - General Requirements
Q: Text: H. Project Management Plan (PMP) Text: C. The Project Management Appendix link is http://www.nj.gov/it/docs/vendors/ProjectManagementAppendix.pdf; Question: Please confirm which set of requirements the Vendor should use to draft its Project Management Plan.

A: Bidders are advised to review the PMP requirements and specifications detailed within this Solicitation. In addition, Bidders are also advised to model the recommended Project Management Guidelines which can be found in the enclosed link: http://www.nj.gov/it/docs/vendors/ProjectManagementAppendix.pdf. For more information, please see the preceding State’s response to Question #40 as well.

42.
Bid Solicitation, Section 3.19 - Additional Plans
Q: (3.19.C., PDF page 16 / 62) Given the significant scope, the 180-day time frame provides the incumbent with an unfair advantage. Would the State consider extending the overall Implementation to 12 months?

A: The State has accepted the proposed modification and has revised the current Bid Solicitation. Under Section 3.19C, Bidders are specifically required to “describe its plans for system roll-out, including System Pilot Testing and full deployment, beginning with the Contract effective date and lasting no longer than 365 days;”

43.
Bid Solicitation, Section 3.19 - Additional Plans
Q: (C) Implementation Plan: The Bidder must describe its plans for system roll-out including System Pilot Testing and full deployment, beginning with the Contract effective date and lasting no longer than 180 days. Question: Please clarify if this is 180 calendar days or 180 business days.

A: Please see the response to Question #42.

44.
Bid Solicitation, Section 3.19 – Additional Plans
Q: (C) With the complexity of the deployment project, could the State consider extending the deployment period to a total of twelve months, inclusive of 13-week mobilization period?

A: Please see the response to Question #42.

45.
Bid Solicitation, Section 3.19 – Additional Plans
Q: (H.3.a, Existing hardware) Can the State please detail the specifications (memory, storage, processor) of the existing workstations beyond simply their model number?

A: The specifications for the existing workstations are as follows:

· Model: Dell OptiPlex 7000 Micro

· CPU: 35W Intel i7-12700T (12 cores)

· Memory: 16GB DDR4

· Storage: 512GB NVMe SSD

· Display Ports: 2 DPs

46.
Bid Solicitation, Section 3.23 - Resumes
Q: (D) With respect to each similar Contract, the name and address of each reference together with a person to contact for a reference check and a telephone number. Question: Can the MVC confirm that individual project references are not required for key personnel who were not customer-facing or involved and that internal references for these individuals would be acceptable?

A: The State cannot speak to specific information the Bidder intends to include with its Quote. Bidders should include the level of detail it deems necessary for evaluation of its Quote.

Q: If not, what alternative reference information can be provided to meet the proposal requirement for similar project experience?

A: The Bidder should provide the level of detail it deems necessary for Quote evaluation.

47.
Bid Solicitation, Section 3.27 - Oral Presentation
Q: To help vendors properly prepare the materials can MVC provide an estimate of the amount of time that will be allotted for Oral presentations?

A: Oral presentations will be limited to 45 minutes each, with an additional 15 minute question and answer period where the Bidder may be asked to clarify certain aspects of its proposed EDDL application. Please see the revised Bid Solicitation entitled, “T2466 Revised Bid Solicitation 9.5.25.”

48.
Bid Solicitation, Section 3.27 - Oral Presentation
Q: Will live demonstrations of equipment be allowed or required as part of the Oral Presentations?

A: Yes, a live demonstration of any product or service detailed in the Bidder’s written proposal is allowed during the Oral Presentation, provided the Bidder includes screenshots of the demonstration in its Quote. However, if certain capabilities or features are not specified in the Bidder’s written proposal, they cannot be introduced during the Oral Presentation or Live Demonstration.

49.
Bid Solicitation, Section 3.27 - Oral Presentation
Q: Is the expectation that Oral Presentations will be in person or remote?

A: The State will coordinate with Bidders invited to give an oral presentation. Presentations may be virtual or in person.

50.
Bid Solicitation, Section 3.27 - Oral Presentation
Q: Would the State consider Oral Presentation Materials to be delivered after solicitation submission and one week prior to the Oral Presentation date, instead of with bidders’ response? This will allow bidders to fully focus on answering the Technical & SOW requirements of the EDDL & Central Issuance Solicitation.

A: Pursuant to this section, During the Oral Presentation, Bidders may only present materials and information that were provided in its Quote. No supplemental information outside of the material submitted with the Quote shall be provided during oral presentations.

51.
Bid Solicitation, Section 3.27 - Oral Presentation
Q: Under “B.e”, can the State please confirm the quantity and card types of card stock and security features that are to be presented?

A: Please see Section 4.5.3 in the Bid Solicitation for card stock types and quantities. Security features will not be made available for this Bid Solicitation. Please see the revised Bid Solicitation Section 3.27 in the Revised Bid Solicitation entitled, “T2466 Revised Bid Solicitation 9.5.25.”

52.
Bid Solicitation, Section 3.27 - Oral Presentation
Q: (3.27.A, PDF page 19 / 62) Will vendors be allowed to demonstrate equipment and software in a live demo during the oral presentation?

A: Please see the response to Question #47.

53.
Bid Solicitation, Section 3.27 - Oral Presentation
Q: (3.27.B.e., PDF page 19 / 62) The Bidder should include in its Quote the presentation materials it intends to present to the State if selected to make an oral presentation - Card stock and security features. QUESTIONS: Can the State provide guidance on the number of samples cards required and if a set of different card types are required?

A: Please see the response to Question #48.

Q: Please also confirm that all sample cards are required at the time of the submittal of the proposal.

A: Sample cards will be required as part of the Oral Presentation for all Quote submissions that are deemed Responsive. The Division of Purchase and Property will request these samples prior to the Oral Presentation.

Q: If required at time of submittal, please provide details of how/where to submit the samples.

A: Quotes must be submitted through NJSTART. However, all card samples will be requested prior to the Oral Presentation. Requested card samples may be mailed or dropped off at the 9th Floor Reception Desk at the Division of Purchase and Property at the address listed below:

Department of Treasury Division of Purchase and Property 33 W State Street – 9th Floor Trenton, NJ 08608

Please note: The Bidder is responsible for ensuring that all requested card samples arrive within 48 hours upon written request from the State.

Please see the revised Bid Solicitation Section 3.27 in the Revised Bid Solicitation entitled, “T2466 Revised Bid Solicitation 9.5.25” for more information.

54.
Bid Solicitation, Section 4 - Scope of Work
Q: Please confirm which parts of the Scope of Work Section require a detailed answer.

A: Sample cards will be required as part of the Oral Presentation for all Quote submissions that are deemed Responsive. The Division of Purchase and Property will request these samples prior to the Oral Presentation.

Q: Do only the sections labeled "REQUIREMENT” require a detailed answer as the other sections seem to be an overview of the current solution.

A: Quotes must be submitted through NJSTART. However, card samples shall be requested prior to the Oral Presentation. Requested card samples may be mailed or dropped off at the 9th Floor Reception Desk at the address listed below:

Department of Treasury Division of Purchase and Property 33 W. State Street- 9th Floor Trenton, NJ 08608

Please note: The Bidder is responsible for ensuring that all requested card samples arrive within 48 hours upon written request from the State.

Please see the revised Bid Solicitation Section 3.27 in the Revised Bid Solicitation entitled, “T2466 Revised Bid Solicitation 9.5.25” for more information.

55.
Bid Solicitation, Section 4 - Scope of Work
Q: (beginning on PDF page 21 / 62) Please provide an overall system architectural diagram of the current system.

A: The Bidder is advised to carefully review Exhibit “A” posted in NJSTART under the “Attachment Tab.”

56.
Bid Solicitation, Section 4 - Scope of Work
Q: (beginning on PDF page 21 / 62) Please provide the service ticket response time and repair time service level agreement for field support.

A: The Bidder is advised to carefully review Exhibit “C” posted in NJSTART under the “Attachment Tab.”

57.
Bid Solicitation, Section 4 - Scope of Work, Section 4.1 -Overview of Scope of Work & Section - 6.28 System Development and Acquisition
Q: Text: (4.1.A.1) Develop, implement, and deliver: (1) User Acceptance Testing (UAT) and development environments, backup, recovery systems, and disaster recovery plans; Text: (6.28.B) Separation of development, testing, and operational environments; Question: Will there be a separate shared development within MVC that we will have for interface development for UAT?

A: Yes, and the Contractor should be prepared to provide these subject environments. Bidders are also advised to review Section 3.19 of this Solicitation.

58.
Bid Solicitation, Section 4 - Scope of Work, 4.1.1 - General Requirements
Q: (C-Attachment) The Project Management Appendix… Question: Please confirm if this document requires a detailed response that is to be submitted with the bidders’ response, or is this document for reference ONLY at this time?

A: Bidders are advised the Project Management Appendix link is provided for reference.

59.
Bid Solicitation, Section 4.1.1 - General Requirements
Q: The Contractor shall assess and scope the existing Garden State Network (GSN) and develop its system to function successfully and efficiently within NJMVC network limitations to prevent any potential, probable, and/or actual network latency issues. Question: Please clarify that the assessment and scoping of the GSN is due post award?

A: Yes, the assessment and scoping of the Garden State Network (GSN) will be due after Contract Award.

60.
Bid Solicitation, Section 4.1.1 - General Requirements
Q: (C) In the Facility Management Plan Requirements section of the Project Management Appendix, the State highlights that: “the contractor will be required to provide a fully functional and operational facility for the Project… [and] will house the entire Project Team including NJ State Project staff, Contractor staff, and any other Project Contractors.” Can the State please elaborate on how many NJ State employees will be working out of this facility and what the facility requirements the Contractor must provide?

A: The State finds Bidder Question #60 has no material impact on the Bidder/Contractor’s ability to provide accurate pricing or a viable, competitive proposal and price quote in response to this Solicitation. This Bid Solicitation and any resulting contract states and requires the Contractor to provide a Central Print Facility (CPF) not a test facility. The Commission does not anticipate any need for MVC employees to be assigned to, or working in, the Contractor-provided CPF. Bidders are advised the State has an existing lab/ testing facility and will provide access and use authorization to the awarded Contractor to create the new environment.

61.
Bid Solicitation, Section 4.1.1 - General Requirements
Q: (E.1) Could the State expand on under what circumstances would the CPF be required to move to a MVC designated facility, and the expected process that change would follow.

A: Legislative mandates may at some future date, require the Contractor to relocate and house the CPF at its operations at a new, mutually agreed upon secure location identified by MVC within the State of NJ. However, at this time such requirements are not yet mandated by the State.

62.
Bid Solicitation, Section 4.1.1 - General Requirements
Q: (D.1) For OTC Card Issuance locations, will a safe be provided by the State at each such office for secure storage of OTC printing materials or will the Contractor be required to provide this?

A: Yes, the State will provide a safe for secure storage of printing materials. Access will be limited to authorized designated personnel only.

63.
Bid Solicitation, Section 4.1. – Overview of Scope of Work
Q: (A.2) Under the Scope of Work Section, the RFP states, “All image and signature migrations from the existing Central Image Repository (CIR) to the new cloud-based platform.” Can the State please provide volume of image and signature records currently stored in its current system as well as an expected growth of additional images and signatures per year based on previous year’s growth metrics.

A: Currently, there are approximately 20 million records stored in the existing system. However, the MVC does not have estimates for future growth in the number of records.

64.
Bid Solicitation, Section 4.2 - Current Processes
Q: The RFP states, "The Contractor shall maintain the following current processes while developing and implementing the enhanced cloud-based EDDL system. The Contractor must utilize existing MVC hardware (PDF page 22 / 62) During initial implementation. Hardware specifications are detailed in Section 4.2.1. Any transition from the incumbent to another Contractor must be seamless with no interruption of daily operations or any EDDL-related services currently provided by MVC". QUESTION: Please specify the existing MVC hardware the Contractor must utilize, and confirm it is not the incumbent provided hardware, which this contract will replace.

A: Bidders are advised the Contractor is not required to replace MVC-owned hardware. Existing MVC workstation and related equipment consists of approximately 350 Dell Optiplex 7000 Micro, 35W CPU i7-12700T (12 Cores), 16GB DDR4, 512GB NVMe SSD, 2 DPs. Roughly the same number of Ingenico Credit Card readers, Honeywell Barcode Readers, EPSON TM-6000IV receipt printers, HP cash drawers, and HP M611 printers.

65.
Bid Solicitation, Section 4.2 - Current Processes
Q: The Contractor must utilize existing MVC hardware during initial implementation. Question: Please provide some additional details about the Workstation PC; the key details are CPU type and speed, RAM, Disk Type and Current Operating system version.

A: The workstation PCs that the Contractor must utilize during the initial implementation are Dell Optiplex 7000 Micro units with the following specifications:

35W CPU i7-12700T (12 Cores), 16GB DDR4, 512GB NVMe SSD, 2 Display Ports.

66.
Bid Solicitation, Section 4.2 - Current Processes
Q: The Contractor must utilize existing MVC hardware during initial implementation. Hardware specifications are detailed in Section 4.2.1... Question: For how long will the existing hardware be used?

A: The existing hardware will be used only during the transition period.

67.
Bid Solicitation, Section 4.2 - Current Processes
Q: The Contractor must utilize existing MVC hardware during initial implementation. Hardware specifications are detailed in Section 4.2.1... Question: Will the vendor be responsible for OS upgrades on the existing PCs?

A: No, the awarded Contractor will not be responsible for operating system upgrades on the existing PCs.

68.
Bid Solicitation, Section 4.2 - Current Processes
Q: The Contractor must utilize existing MVC hardware during initial implementation. Hardware specifications are detailed in Section 4.2.1 Question: Is it required that vendors SW be compatible will ALL existing hardware?

A: Yes, the awarded Contractor's software must be compatible with all existing hardware, except for the existing OTC Workstation.

69.
Bid Solicitation, Section 4.2 - Current Processes
Q: Text: The Contractor must utilize existing MVC hardware during initial implementation. Hardware specifications are detailed in Section 4.2.1... Question: Does the existing OTC printer hardware also need to be used?

A: No, the existing OTC printer hardware does not need to be used.

70.
Bid Solicitation, Section 4.2 - Current Processes
Q: (PDF page 22 / 62) Please confirm that during the implementation phase the current and new systems will operate in parallel and separate from each other until the legacy ICA workstations are replaced by the new ICA workstations.

A: Yes, during the implementation phase, the current and new systems will operate in parallel and separately until the legacy ICA workstations are replaced by the new ICA workstations.

71.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS)
Q: (4.2.1.A., PDF pg. 22 / 62) and Attachment 3 (line 7/row25) Please confirm that the State requires one each of the following named hardware items or a technically equivalent alternative item -- A. Hardware (workstation): DELL 7000 Micro Form Factor (MFF) and 7000 Small Form Factor (SFF), Epson TM-H6000IV printers, HP Standard Duty Cash Drawers (QT457AA), Ingenico ISC Touch 250 readers, and Ingenico Lane 5000 and Lane 7000 readers or newer.

A: The State requires these specific hardware items, However, t the Bidder/Contractor is not required to provide the hardware or the equivalent. In the event the Bidder/Contractor is unwilling or unable to provide such items to MVC, The Commission reserves the right to purchase, and the Contractor must integrate and provide full functionality of all said equipment within its EDDL system on behalf of NJMVC. The Contractor must then secure written approval and operational acceptance of all equipment, its full integration and related function within the Contractor provided EDDL from the NJMVC SCM.

72.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS)
Q: (4.2.1.A., PDF pg. 22 / 62) and Attachment 3 (line 7/row25) Does the State require a camera with each workstation, in addition to the items listed in 4.2.1.A?

A: Yes, the State requires a camera with each workstation, in addition to the items listed in section 4.2.1.A.

73.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS)
Q: (PDF page 22 / 62) ICA consists of all equipment required to electronically capture, temporarily store, and securely transmit the applicant’s digitized image, signature, voter registrations, organ donor designations, and necessary biographic information to the CIR. Currently, a minimum of two (2) ICA stations are located within each MVC Agency site. ICA stations utilize IBM SurePos consisting of the following hardware and software components: for Temporary Documents. QUESTION: Can the State provide the hardware currently used for de-centralized over-the-counter Card Issuance System (OTCCIS) related to OTC printing?

A: The Bidder is advised to carefully review Exhibit “D” and note existing equipment is end of life and will not be utilized with this contract.

74.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS)
Q: (PDF page 22 / 62) To avoid bidder scope misunderstandings, can the State clarify the specific hardware components bidders are expected to quote as well as quantities?

A: Bidders are advised to provide both a unit cost per item as well as an aggregate total cost for the full quantity of each hardware component proposed.

75.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS)
Q: (PDF page 22 / 62) Does the state provide the Microsoft Dynamics 365 Commerce software licenses for this contract?

A: Yes, the State provides the Microsoft Dynamics 365 Commerce software licenses for this contract.

76.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS) and Attachment 3 - Price Sheet
Q: (PDF page 22 / 62) Please confirm that all of the hardware listed in Section 4.2.1. of the Statement of Work must be included in Priceline 7 of Attachment 3 including POS workstation PC, temporary DL/ID printer, receipt printer, cash drawer, and a POS/signature capture device.

A: Bidders are advised to review the State’s preceding answer to Question #75. The Contractor must provide new Signature Pads, Cameras and UPS. All other equipment will be provided by the State.

77.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS)
Q: (A) Could the State confirm that it will provide the required workstations for each ICA and maintains them and their administration.

A: Yes, the State will provide and maintain the required computer workstations for each ICA. However, the Contractor must provide new Signature Pads, Cameras, Uninterrupted Power Supply Units (UPS) and Over-the-Counter (OTC) printers where needed in addition to providing all necessary support for its application.

78.
Bid Solicitation, Section 4.2.1 - Image Capture Application (ICA) with Image Retrieval System (IRS)
Q: (A) With the State maintain the ICA workstations software image, could a list of installed packages be provided.

A: The State currently has the following software installed: Adobe Acrobat Reader DC, Microsoft Dynamics 365, G-Link Pro 860, G-Link 7.1, Google Chrome, Mocha, Microsoft Edge, and Dynamsoft scanner drivers. Bidders are advised that this is not an inclusive list. Applications may change based on the ongoing technical needs of the State during the Contract term.

79.
Bid Solicitation, Section 4.3 - Image Capture Application (ICA) With Image Retrieval System (IRS) Requirements
Q: (4.3.D., PDF page 23 / 62) Must the new DL/ID issuance solution integrate directly with the existing Point-of-Sale (POS) hardware/software at MVC agencies? If yes, please clarify technical standards, APIs, or protocols required.

A: The POS system is a stand-alone application where integration is not required.