Exhibit C - EDDL SLAs~4.docx

DOCX document 14 KB Posted

Attached to
T2466 - ENHANCED DIGITAL DRIVERS LICENSE (EDDL) AND CENTRAL ISSUANCE
Solicitation number
25DPP01124
Issued by
Mercer County, New Jersey

About this file

This is an Exhibit C Service Level Agreements document for the Enhanced Digital Driver's License (EDDL) system being procured by the State of New Jersey Motor Vehicle Commission through the Department of Treasury's Division of Purchase and Property. The EDDL System must maintain availability during all NJMVC operational hours and other required times, excluding scheduled maintenance windows. The service level agreements are structured into three impact levels with specific response and resolution timeframes: Level 3 (non-production testing issues) requires a contractor response within two hours and troubleshooting session within three hours, with resolution required within seven business days; Level 2 (serious production or non-production issues) mandates a 30-minute response and one-hour troubleshooting session, with one business day resolution; and Level 1 (production downtime preventing EDDL transactions) requires a 15-minute response and immediate troubleshooting session during all hours with one-hour resolution. Hardware issues are classified as Level 1, requiring replacement or repair within one hour of contact.

The contractor must provide 24/7 monitoring for cloud connection issues causing downtime until resolution is achieved. All response and resolution timeframes may be modified only with written approval from the State Contract Manager (SCM). These service level agreements establish mandatory performance standards that the contractor must meet to maintain system reliability and operational continuity for the approximately 1.5 million licenses and 1 million change requests processed annually across 46 Agency and Regional Service Center locations and 360 Image Capture Stations in New Jersey.

View the file

Other files

File Type Posted
T2466 Revised Bid Solicitation 7.29.25.pdf PDF
T2466 Revised Bid Solicitation 9.5.25~2.docx DOCX document
T2466 Bid Amendment 3 6.11.25.docx DOCX document
T2466 Revised Bid Solicitation 5.8.25~1.pdf PDF
T2466 Bid Amendment 8 10.21.25~2.docx DOCX document
T2466 Bid Amendment 7 10.14.25.docx DOCX document
T2466 Revised Bid Solicitation 2.18.25.pdf PDF
Exhibit A - EDDL Network Architecture Diagrams~4.pdf PDF
T2466 Bid Amendment 4 7.29.25.pdf PDF
T2466 Revised Bid Solicitation 6.11.25.pdf PDF
Attachment 1- State of New Jersey Standard Terms and Conditions 2.8.2024.pdf PDF
State-of-New-Jersey_Third-Party-Information-Security-Questionnaire_NDA_2024.pdf PDF
T2466 Bid Amendment 2 5.8.25~1.pdf PDF
Attachment 2- Standard Procurement Forms Packet.pdf PDF
Attachment 3- T2466 Revised State-Supplied Price Sheet 10.21.25.xlsx XLSX spreadsheet
T2466 Bid Amendment 6 9.25.25.docx DOCX document
T2466 Revised Bid Solicitation 10.14.25.docx DOCX document
Exhibit D - Current Vendor Supplied Hardware~3.docx DOCX document
Attachment 3- State Supplied Price Sheet - EDDL 2.11.25.xlsx XLSX spreadsheet
T2466 Revised Bid Solicitation 9.25.25~1.docx DOCX document
Exhibit B - EDDL Locations~4.docx DOCX document
T2466 Bid Amendment 1 2.18.25~6.docx DOCX document
T2466 Bid Amendment 5 9.5.25~1.docx DOCX document
T2466 Optional PreQuote Conference PowerPoint~1.pptx PPTX presentation
T2466 Bid Solicitation 2.11.25~2.pdf PDF
T2466 Revised Optional Pre-Quote Conference PowerPoint 2.18.25.pptx PPTX presentation
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EDDL SERVICE LEVEL AGREEMENTS

The EDDL System must be available for use during all NJMVC operational hours and any other times when the system may be required for related system operations excluding any agreed upon maintenance windows, unless otherwise instructed by the SCM.

The EDDL System must adhere to the following Levels of Production impact:

Level 3 – a non-production issue that impacts testing (UAT or Development environment) in a meaningful way. Testing is impacted, but not halted. A response from the Contractor after initial NJMVC contact must be in two (2) hours or less. The Contractor is required to provide a troubleshooting session within three (3) hours of initial NJMVC contact, unless otherwise approved by NJMVC. Resolution is required within seven (7) Business Days, unless otherwise approved by the SCM in writing.

Level 2 – a production or non-production issue that impacts the environment in a serious way. The system still functions, but there are serious disruptions to business and/or testing. A response from the Contractor after initial NJMVC contact must be in 30 minutes or less. The Contractor is required to provide a troubleshooting session within one (1) hour of initial NJMVC contact, unless otherwise instructed by the SCM. Resolution is required within one (1) Business Day, unless otherwise approved by the SCM in writing.

Level 1 – production downtime, where business halts and Agencies are unable to process EDDL transactions. A response from the Contractor after initial NJMVC contact must be in 15 minutes or less during Business and non-business hours/Days. The Contractor shall provide a troubleshooting session within 15 minutes of NJMVC contact, unless otherwise instructed by the SCM. Resolution must be provided within one (1) hour, unless otherwise instructed by the SCM in writing. Contact and resolution may be required after business hours or on weekends. Downtime caused by cloud connection issues shall require 24/7 monitoring by the Contractor until issue resolution.

Hardware issues are considered Level 1. The Contractor must replace and/or repair faulty and/or nonoperational hardware within one (1) hour of NJMVC contact, unless otherwise instructed by the SCM.

File details come from the government source that posted it. Updated .