SXHT 16-1028 Atch1 SOW.pdf

PDF 255 KB Posted

Attached to
REPAIR, RENOVATE PMEL
Solicitation number
FA252126B0001
Issued by

About this file

Statement of Work for PMEL Facility Renovation

This Statement of Work (SOW) outlines a federal construction project (Project No. SXHT 16-1028) for the repair and renovation of a Precision Measurement Equipment Laboratory (PMEL) located in Building 981. The contractor must provide all labor, equipment, and materials necessary to repair and construct the PMEL facility in compliance with Air Force Criteria for PMEL Design and Construction document FC 4-218-01F. The primary scope includes replacing all air handling units (AHU) and associated control systems as identified through design analysis, and establishing HVAC Emergency Shut-off capabilities in accordance with UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, Standard 18. All work must comply with State of Florida Building Codes and Wing Facility Excellence guidelines.

The government estimate for this project is $3,616,102.00 with a period of performance of 365 calendar days. This is a fixed-scope construction project requiring coordination with federal facilities standards and antiterrorism requirements for HVAC systems.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROJECT NO: SXHT 16-1028

PROJECT TITLE: REPAIR, RENOVATE PMEL, BLDG 981

DESCRIPTION OF WORK:

Work to be performed under this project consists of providing all labor, equipment, and materials to repair and construct a Precision Measurement Equipment Laboratory (PMEL) that meets the Air Force Criteria for PMEL Design and Construction document FC 4-218-01F. Replace all air handling units (AHU) and associated control systems identified by design analysis in PMEL facility, building

981. Establish HVAC Emergency Shut-off per UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, Standard 18 (HVAC Shutoff). All work shall comply with State of Florida Building Codes and Wing Facility Excellence guidelines.

GOVERNMENT ESTIMATE: $3,616,102.00

PERIOD OF PERFORMANCE: 365 calendar days