Attachment_4_-_QASP.pdf

PDF 845 KB Posted

Attached to
Shipboard Multipurpose Device Program (SMDP) Federal contract opportunity
Solicitation number
SP7000-19-R-1001
Issued by
Defense Logistics Agency

About this file

This Quality Assurance Surveillance Plan outlines performance metrics and monitoring procedures for the Shipboard Multipurpose Device Program contract. Key requirements include providing six classes of multifunction devices, one class of black and white and one class of color production devices, and two classes of specialty devices. Related services such as maintenance, parts, supplies, training and technical support are also within scope. Metrics address timely reporting, phase-in periods, personnel provisions, response windows, availability, training schedules and locations, parts shipment timelines, and monthly reporting deadlines. Contractors must submit all required testing plans for approval prior to award. Performance will be monitored using the Contractor Performance Assessment Reporting System along with other past performance records and reports from contracting officers and customers.

Attachment 4 - QASP REVISED

View the file

Other files for this federal contract opportunity

Other files attached to Shipboard Multipurpose Device Program (SMDP), newest first.
File Type Posted
Attachment_2_-_CLIN_List_REVISED_9102019.xlsx XLSX spreadsheet
SP700019R1001-0019.pdf PDF
Attachment_2_-_CLIN_List_REVISED_8292019.xlsx XLSX spreadsheet
SP700019R1001-0018.pdf PDF
Attachment_2_-_CLIN_List_REVISED_82819.xlsx XLSX spreadsheet
SP700019R1001-0017.pdf PDF
Parts,_Supplies_&_Toner_Purchases_List_with_Aggregate_Pricing.xlsx XLSX spreadsheet
Attachment_1_-_SMDP_Performance_Work_Statement_82819.pdf PDF
Questions-Answers_82819_.docx DOCX document
SP700019R1001-0016.pdf PDF
SP700019R1001-0015.pdf PDF
SP700019R1001-0014.pdf PDF
Attachment_7_-_DLA_SMCP_Maintenance.pdf PDF
Attachment_3_-_DD_Form_254_Fillable.pdf PDF
SP700019R1001_SMDP_1449.pdf PDF
Attachment_6_-_DLA_SMCP_Installs.pdf PDF
Attachment_5_-_PWS_Compliance_Form.pdf PDF
Attachment_8_-_DLA_SMCP_Training.pdf PDF
Attachment_4_-_QASP.pdf PDF
Attachment_1_-_Shipboard_PWS_REVISED.pdf PDF
SP700019R1001-0013.pdf PDF
SP700019R1001-0011.pdf PDF
SP700019R1001-0011.pdf PDF
SP700019R1001-0010.pdf PDF
SP700019R1001-0008.pdf PDF
SP700019R1001-0007.pdf PDF
SP700019R1001-0006.pdf PDF
1-SP700019R1001-0005_printed.pdf PDF
Attachment_5_-_PWS_Compliance_Form.pdf PDF
combined_2nd_round_Q&A.pdf PDF
3-SP700019R1001_SMDP_1449_revised_32919.pdf PDF
Attachment_3_-_DD_Form_254_Fillable.pdf PDF
Attachment_2_-_CLIN_List_updated_32919.xlsx XLSX spreadsheet
1-SP700019R1001-0004.pdf PDF
Attachment_1_-_Shipboard_PWS.pdf PDF
Round_1_Q&A.pdf PDF
Round_1_Q&A.pdf PDF
SP700019R1001-0003.pdf PDF
SMDP_PREPROPOSAL_CONFERENCE_SLIDES_v1.pptx PPTX presentation
Attachment_2_-_CLIN_List_updated_22219.xlsx XLSX spreadsheet
SP700019R1001-0002.pdf PDF
SP700019R1001-0001.pdf PDF
SMDP_PRE-PROPOSAL_CONFERENCE.pdf PDF
Attachment_2_-_CLIN_List_updated_2132019.xlsx XLSX spreadsheet
Attachment_2_-_CLIN_List.xlsx XLSX spreadsheet
Attachment_1_-_Shipboard_PWS_(2).pdf PDF
Attachment_3_-_DD_254.pdf PDF
Attachment_4_-_QASP.pdf PDF
Enclosures_A-E.pdf PDF
SP700019R1001_SMDP_1449.pdf PDF
Show all 50

Shipboard Multipurpose Device Program (SMDP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 QASP

QUALITY ASSURANCE SURVEILLANCE PLAN

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the SMDP Performance Work Statement standards that will be included in the contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.

2. AUTHORITY

Authority for issuance of this QASP is provided under FAR 52.212-4(a), Inspection/Acceptance, and FAR 52.212-4(m), Termination for cause, and documentation called for in the contract to be accomplished by the Contracting Officer or his duly authorized representative.

3. SCOPE

The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract

4. GOVERNMENT RESOURCES

The following definitions for Government resources are applicable to this plan:

Contracting Officer – A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.

Contracting Officer’s Representative (COR) – An individual designated in writing by the Contracting Officer to act as the authorized representative to assist in administering a contract.

The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.

5. RESPONSIBILITIES

The Government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer who assures the Contractor receives impartial, fair, and equitable treatment under the contract. The

Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is NOT empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor determines may affect the contract price, terms, or conditions, shall be referred to the Contracting Officer for action.

6. METHODS OF QA SURVEILLANCE

Contractor Performance Assessment Reporting System (CPARS) Requirements:

(a) The Contractor, in performing this contract, will be subject to past performance assessments in accordance with FAR 42.15 and the Contractor Performance Assessment Reporting System (CPARS) Guide at:

http://www.cpars.navy.mil/cparsfiles/pdfs/navycparsmanual/pdf.

All information contained in the assessment may be used by the Government, within the limitations of FAR 42.15, for future source selections in accordance with FAR 15.304 where past performance is an evaluation factor. Assessments will be conducted as prescribed by CPARS guidance.

(b) The contractor will be provided with a copy of the assessment. The contractor will have 30 calendar days to submit comments, additional information, or rebut statements if warranted or desired. The contractor must strictly control access to the assessment while in the contractor’s possession and must ensure that the assessment is never released to persons or entities outside of the contractor’s control. After receipt of Contractor’s comments or expiration of the 30 day comment period, whichever occurs first, and depending on the Contractor’s response, the Government will:

(i) If no comments are received; close the CPARS by the Assessing Official Representative and Reviewing Official.

(ii) If Contractor concurs with the assessment; accept/update and close the CPARS and forward comments to all reviewers.

(iii) If Contractor does not concur with the assessment, coordinate a final response with Reviewing Official, Assessing Official Representative, and Assessing Official.

(iv) Enter the final Government response and close CPARS.

(c) After completion of one of the appropriate actions, the Assessing Official will notify all individuals that the report is complete. The assessment is considered complete when signed by the Assessing or Reviewing Official.

(d) The official responsible for the corporate operating unit being assessed can submit a written request to receive a copy of the completed CPARS assessment. The assessment is not subject to the Disputes clause of the contract, nor is it subject to appeal beyond the review and comment procedures described above and in the CPARS Guide. Refer to:

http://www.cpars.csd.disa.mil/ for details and additional information related to CPARS, CPARS user access (which includes obtaining a PKI certificate), how contract performance assessments are conducted, and how Contractors participate.

The contractor must supply the name, email and phone number of the individual who will be responsible for submitting comments, additional information or rebuttal statements, if warranted, in the spaces below.

PRINT OR TYPE NAME

SIGNATURE

EMAIL ADDRESS AND PHONE NUMBER

7. PERFORMANCE MEASUREMENT

QUALITY ASSURANCE SURVEILLANCE PLAN

1. Upon completion of any action, provide a DLA Document Services Customer Acceptance Form, Enclosure (A) by attaching it to the invoice in Wide Area Workflow (WAWF) and sending both to the designated Contracting Officer’s Representative (COR) within ten (10) calendar days after the action. See Performance Work Statement (PWS) for all details.

PWS reference: 2.3

Acceptable Performance Level (APL): 100% timely

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

2. Phase-in refers to the 30 day period immediately following the contract start date. See PWS for all details.

PWS reference: 3

APL: 100% compliant

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

3. Have sufficient personnel with in 30 days immediately following the contract start date, to work with the customer and DLA Document Services SMDP team for all new equipment ordered under this contract. See PWS for all details.

PWS reference 3.2.

APL: 100% timely

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

4. During normal working hours, the Shipboard Rider shall respond to a trouble call within two

(2) hours of verbal notification on board the home ship. If outside of normal working hours the Shipboard Rider shall respond to a trouble call within eight (8) hours of verbal notification. If parts are required, repair shall occur within eight (8) hours of receipt of part. See PWS for all details.

PWS reference: 6.2.2.

APL: 100% timely & compliant

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

5. The Shipboard Rider shall maintain the availability of SMDP MFDs on the ship. See PWS for all details.

PWS references: 6.2.3., 6.2.4., and 6.2.5.

APL: 100% timely

6. Contractor representatives shall be available to provide training, parts, and service support in 100% of the high traffic port locations within 60 days after contract award. Movement of an OCONUS contractor representative shall be accomplished within 60 days from government request, at which time training, parts, and service support should be available. See PWS for all details.

PWS reference: 7.1

APL: 100% timely

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

7. Satisfactory performance of equipment requires prompt response to requests for technical service. Time limits are imposed for response after receipt of verbal notification of needed service. See PWS for all details.

PWS reference: 7.2

APL: 100% timely & compliant

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

8. The contractor shall ship the replacement parts within 48 hours of the ship’s notification. See PWS for all details

PWS reference: 11.1 and 11.2

APL: 100% timely

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

9. Complete factory parts lists for each SMDP MFD Classes of equipment shall also be furnished to DLA Document Services SMDP Manager 5 business days after the start of the contract Period of Performance. See PWS for all details.

PWS reference: 12.5

APL: 100% timely & compliant

Surveillance Method: Contracting Officer/COR/Customer Feedback

10. Defective Parts. Parts found to be defective shall be returned to the contractor at the address specified by the contractor with an explanation of the defect. When verified as defective, the part shall be replaced without charge within 30 days of receipt. If the contractor does not verify the returned part as defective the contractor shall provide in writing, justifiable reasons for not replacing the part within 30 days to the sender and DLA Document Services SMDP Manager.

PWS reference: 12.9

APL: 100% timely

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

11. Training shall be of two types, Training at the contractor’s Fixed-Sites (see paragraph 16.6 below) and Training at Government furnished Mobile-Sites (see paragraph 16.7 below), and shall be available within 30 days after contract award. See PWS for all details.

PWS reference: 16

APL: 100% timely

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

12. Within 30 days after award the contractor shall provide a 6 month training schedule of dates, times, and locations of classes (updated monthly) to the DLA Document Services SMDP Manager for dissemination to the TYCOMs. See PWS for report requirements.

PWS reference: 16.2

APL: 100% timely

Reporting Tools: CPARS and other Past Performance Records as required

Surveillance Method: Contracting Officer/COR/Customer Feedback

13. The contractor shall provide reports on a monthly basis in Excel readable format to the COR. All reports are due by the 10th of each month. See PWS for all details.

PWS reference: 17.1, 17.2, 17.3, 17.4, 17.5

APL: 100% timely

Surveillance Method: Contracting Officer/COR/Customer Feedback

14. The contractor shall have all contractors required testing plans submitted to NSWC Carderock Division for certification/approval prior to award at no cost to the government. All physical testing shall be completed after award. See PWS for all details.

PWS reference: 18

APL: 100% timely

Reporting Tools: CPARS, CORT Tracking Tool and other Past Performance Records

File details come from the government source that posted it. Updated .