Amendment__0012.pdf

PDF 874 KB Posted

Attached to
Shipboard Multipurpose Copier Program Federal contract opportunity
Solicitation number
SP700013R1026
Issued by
Defense Logistics Agency

About this file

Amendment 0012 change of impression numbers in Production CLINs

View the file

Other files for this federal contract opportunity

Other files attached to Shipboard Multipurpose Copier Program, newest first.
File Type Posted
Amendment__0013.pdf PDF
Amendment__0011.pdf PDF
Amendment__10.pdf PDF
Amendment__09.pdf PDF
Amendment__08.pdf PDF
Amendment__07.pdf PDF
Amendment__06.pdf PDF
Amendment__05.pdf PDF
Amendment__04.pdf PDF
Amendment__03.pdf PDF
Amendment__02.pdf PDF
Amendment__01.pdf PDF
SMCP_Solicitation_SP7000-13-R-1026_Revision.pdf PDF
SMCP_Solicitation_SP7000-13-R-1026.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

APS1596

Cross-Out

This amendment is to:

- Incorporate changes to Color and Black & White Production Equipment impression calculations on various CLIN’s

Summary of Changes

When changing the total impressions requirement for the Color and Black and White Production equipment in Amendment 0011 the impressions totals within the related CLINs should have been changed also but were not. This amendment is to incorporate the impression changes within the related CLINs. Below shows the changes made.

Color Production Equipment CLIN “Calculate Total Cost“ impression changes:

CLIN 136 - Class PC - Toner Kits, Cyan - 3 month ship pack Changed from 600,000 impressions to 540,000 impressions

CLIN 137 - Class PC - Toner Kits, Cyan - 6 month ship pack Changed from 1,200,000 impressions to 1,080,000 impressions

CLIN 138 - Class PC - Toner Kits, Magenta - 3 month ship pack Changed from 600,000 impressions to 540,000 impressions

CLIN 139 - Class PC - Toner Kits, Magenta - 6 month ship pack Changed from 1,200,000 impressions to 1,080,000 impressions

CLIN 140 - Class PC - Toner Kits, Yellow - 3 month ship pack Changed from 600,000 impressions to 540,000 impressions

CLIN 141 - Class PC - Toner Kits, Yellow - 6 month ship pack Changed from 1,200,000 impressions to 1,080,000 impressions

CLIN 142 - Class PC - Toner Waste Bottle - 3 month ship pack Changed from 600,000 impressions to 540,000 impressions (B&W remains at 75,000)

CLIN 143 - Class PC - Toner Waste Bottle - 6 month ship pack Changed from 1,200,000 impressions to 1,080,000 impressions (B&W remains at 150,000)

Black & White Production Equipment CLIN “Calculate Total Cost“ impression changes:

CLIN 161 - Class PBW - Toner Kits, Black - 3 month ship pack Changed from 900,000 impressions to 540,000 impressions

CLIN 141 - Class PC - Toner Kits, Black - 6 month ship pack Changed from 1,800,000 impressions to 1,080,000 impressions

CLIN 142 - Class PC - Toner Waste Bottle - 3 month ship pack Changed from 900,000 impressions to 540,000 impressions

CLIN 143 - Class PC - Toner Waste Bottle - 6 month ship pack Changed from 1,800,000 impressions to 1,080,000 impressions

Replace Section B - Page 3 of 48 through Page 12 of 48 of this solicitation with the attached revised Section B Page 3 of 48 through Page 12 of 48.

********************************************** END OF CHANGES******************************************

NAME OF OFFEROR OR CONTRACTOR:

Item NO. QUANTITY UNIT UNIT PRICE AMOUNT

SUPPLIES/SERVICES

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SP700013R1026-0012

SP7000-13-R-1026 Amendment 0012 Page 3 of 48

Shipboard Multipurpose Copier Program

SECTION B: SUPPLIES AND SERVICES

Estimated POP: 01 OCT 13 - 30 SEP 18

CLIN Volume Band Estimated

Units for Evaluation Purposes

Unit Unit Price Total Cost

1 Class 1 Copier/Printer/Fax 730 Each 2 Class 1 - Installation Charge - CONUS 700 Each 3 Class 1 - Installation Charge - OCONUS 30 Each 4 Class 1 - Vibration Mount - Surface Vessels 700 Each 5 Class 1 - Low Profile Hard Mount- Submarine 30 Each 6 Class I - Removal and Disposal Charge 730 Each 7 Class 1 - Prev. Maintenance CONUS - per machine 30 Each 8 Class 1 - Prev. Maintenance OCONUS - per machine 2 Each 9 Class 1 - Toner Kits - 3 month ship pack

Calculate Total Cost for 15,000 Impressions of print 850 Each

10 Class 1 - Toner Kits - 6 month ship pack Calculate Total Cost for 30,000 Impressions of print

330 Each

11 Class 1 - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

50 Each

12 Class 1 - Repair Parts Kits (for 2 copiers) List by Item Name, QTY

25 Each

13 Class 1 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

120 Each

14 Class 1 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

30 Each

15 Class 1 - Additional Unique Tool Kits 10 Each 16 Class 1 - Additional Technical Manuals - Class I 8 Each 17 Class 1 - Contractor's Facility - CONUS-Per Trainee 585 Each 18 Class 1 - Government's Facility - OCONUS-Per Trainee 6 Each 19 Class 1 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

20 Class 1 - Full Services Maintenance. Agreement Per Month 1 Month 21 Class 1C Copier/Printer 62 Each 22 Class 1C - Installation Charge - CONUS 54 Each 23 Class 1C- Installation Charge - OCONUS 8 Each 24 Class 1C - Vibration Mount - Surface Vessels 60 Each 25 Class 1C - Low Profile Hard Mount - Submarine 2 Each 26 Class 1C - Removal and Disposal Charge 62 Each 27 Class 1C - Prev. Maintenance CONUS - per machine 20 Each 28 Class 1C- Prev. Maintenance OCONUS - per machine 2 Each 29 Class 1C- Toner Color Kits- 3 month ship pack

Calculate Total Cost for 15,000 Impressions BW/3,000 Impressions Color 65 Each

30 Class 1C - Toner Color Kits- 6 month ship pack Calculate Total Cost for 30,000 Impressions BW/6,000 Impressions Color

144 Each

31 Class 1C - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

3 Each

32 Class 1C - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

9 Each

33 Class 1C - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

5 Each

34 Class 1C- Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

2 Each

35 Class 1C - Additional Unique Tool Kits 2 Each 36 Class 1C- Additional Technical Manuals 1 Each

SP7000-13-R-1026 Amendment 0012 Page 4 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

37 Class 1C- Contractor's Facility - CONUS Training 13 Each 38 Class 1C - Government's Facility - OCONUS Training 1 Each 39 Class 1C - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

40 Class 1C - Full Services Maintenance. Agreement Per Month 1 Month 41 Class 2 - Copier/Printer 152 Each 42 Class 2 - Installation Charge - CONUS 152 Each 43 Class 2 - Installation Charge - OCONUS 1 Each 44 Class 2 - Vibration Mount - Surface Vessels 152 Each 45 Class 2 - Removal and Disposal Charge 152 Each 46 Class 2 - Prev. Maintenance CONUS - per machine 12 Each 47 Class 2 - Prev. Maintenance OCONUS - per machine 1 Each 48 Class 2 - Toner Kits - 3 month ship pack

Calculate Total Cost for 60,000 Impressions BW 182 Each

49 Class 2 - Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions BW

188 Each

50 Class 2 - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

11 Each

51 Class 2 - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

13 Each

52 Class 2 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

4 Each

53 Class 2 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

1 Each

54 Class 2 - Additional Unique Tool Kits 9 Each 55 Class 2 - Additional Technical Manuals 1 Each 56 Class 2 - Contractor's Facility - CONUS Training 51 Each 57 Class 2 - Government's Facility - OCONUS Training 1 Each 58 Class 2 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

59 Class 2 - Full Services Maintenance. Agreement Per Month 1 Month 60 Class 3 Copier/Printer 706 Each 61 Class 3 - Installation Charge - CONUS 706 Each 62 Class 3 - Installation Charge - OCONUS 1 Each 63 Class 3 - Vibration Mount - Surface Vessels 706 Each 64 Class 3 - Removal and Disposal Charge 706 Each 65 Class 3 - Prev. Maintenance CONUS - per machine 19 Each 66 Class 3 - Prev. Maintenance OCONUS - per machine 1 Each 67 Class 3 - Toner Kits - 3 month ship pack

Calculate Total Cost for 120,000 Impressions BW 418 Each

68 Class 3 - Toner Kits - 6 month ship pack Calculate Total Cost for 240,000 Impressions BW

253 Each

69 Class 3 - Staples - 3 month ship pack 90 Each 70 Class 3 - Staples - 6 month ship pack 67 Each 71 Class 3 - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 11 Each

72 Class 3 - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

34 Each

SP7000-13-R-1026 Amendment 0012 Page 5 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

73 Class 3 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

106 Each

74 Class 3 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

7 Each

75 Class 3 - Additional Unique Tool Kits 5 Each 76 Class 3 - Additional Technical Manuals - Class I 1 Each 77 Class 3 - Contractor's Facility - CONUS Training 248 Each 78 Class 3 - Government's Facility - OCONUS Training 1 Each 79 Class 3 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

80 Class 3 - Full Services Maintenance. Agreement Per Month 1 Month 81 Class 3C - Color Copier/Printer 279 Each 82 Class 3C - Installation Charge - CONUS 279 Each 83 Class 3C - Installation Charge - OCONUS 1 Each 84 Class 3C - Vibration Mount - Surface Vessels 279 Each 85 Class 3C - Removal and Disposal Charge 279 Each 86 Class 3C - Prev. Maintenance CONUS - per machine 1 Each 87 Class 3C - Prev. Maintenance OCONUS - per machine 3 Each 88 Class 3C - Black Toner Kits - 3 month ship pack

Calculate Total Cost for 120,000 Impressions BW 492 Each

89 Class 3C - Black Toner Kits - 6 month ship pack Calculate Total Cost for 240,000 Impressions BW

20 Each

90 Class 3C - Cyan Toner Kits - 3 month ship pack Calculate Total Cost for 60,000 Impressions Color

206 Each

91 Class 3C - Cyan Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions Color

50 Each

92 Class 3C - Magenta Toner Kits - 3 month ship pack Calculate Total Cost for 60,000 Impressions Color

200 Each

93 Class 3C - Magenta Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions Color

46 Each

94 Class 3C - Yellow Toner Kits - 3 month ship pack Calculate Total Cost for 60,000 Impressions Color

203 Each

95 Class 3C - Yellow Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions Color

48 Each

96 Class 3C - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

11 Each

97 Class 3C - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

72 Each

98 Class 3C - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

3 Each

99 Class 3C - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

1 Each

100 Class 3C - Additional Unique Tool Kits 2 Each 101 Class 3C - Additional Technical Manuals - Class IV 1 Each 102 Class 3C - Contractor's Facility - CONUS-Per Trainee 101 Each 103 Class 3C - Government's Facility - OCONUS-Per Trainee 1 Each 104 Class 3C - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

SP7000-13-R-1026 Amendment 0012 Page 6 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

105 Class 3C - Full Services Maintenance. Agreement Per Month 1 Month 106 Class 4 - Copier/Printer 155 Each 107 Class 4 - Installation Charge - CONUS 154 Each 108 Class 4 - Installation Charge - OCONUS 1 Each 109 Class 4 - Vibration Mount - Surface Vessels 155 Each 110 Class 4 - Removal and Disposal Charge 155 Each 111 Class 4 - Prev. Maintenance CONUS - per machine 1 Each 112 Class 4 - Prev. Maintenance OCONUS - per machine 1 Each 113 Class 4 - Toner Kits - 3 month ship pack

Calculate Total Cost for 270,000 Impressions Color 122 Each

114 Class 4 - Toner Kits - 6 month ship pack Calculate Total Cost for 540,000 Impressions Color

45 Each

115 Class 4 - Staples - 3 month ship pack 86 Each 116 Class 4 - Staples - 6 month ship pack 16 Each 117 Class 4 - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 8 Each

118 Class 4 - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

27 Each

119 Class 4 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

13 Each

120 Class 4 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

3 Each

121 Class 4 - Additional Unique Tool Kits 3 Each 122 Class 4 - Additional Technical Manuals - Class 4 1 Each 123 Class 4 - Contractor's Facility - CONUS-Per Trainee 56 Each 124 Class 4 - Government's Facility - OCONUS-Per Trainee 1 Each 125 Class 4 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

126 Class 4 - Full Services Maintenance. Agreement Per Month 1 Month 127 Class Production Color (PC) Copier/Printer 72 Each 128 Class PC - Installation Charge - CONUS 71 Each 129 Class PC - Installation Charge - OCONUS 1 Each 130 Class PC - Vibration Mount - Surface Vessels 72 Each 131 Class PC - Removal and Disposal Charge 72 Each 132 Class PC - Preventative Maintenance. CONUS - per machine 1 Each 133 Class PC - Preventative Maintenance. OCONUS - per machine 1 Each 134 Class PC - Toner Kits, Black - 3 month ship pack

Calculate Total Cost for 75,000 Impressions Black and White 16 Each

135 Class PC - Toner Kits, Black - 6 month ship pack Calculate Total Cost for 150,000 Impressions Black and White

4 Each

136 Class PC - Toner Kits, Cyan - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color

12 Each

137 Class PC - Toner Kits, Cyan - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color

4 Each

138 Class PC - Toner Kits, Magenta - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color

11 Each

139 Class PC - Toner Kits, Magenta - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color

4 Each

140 Class PC - Toner Kits, Yellow - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color

11 Each

SP7000-13-R-1026 Amendment 0012 Page 7 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

141 Class PC - Toner Kits, Yellow - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color

4 Each

142 Class PC - Toner Waste Bottle - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color and 75,000 B&W

9 Each

143 Class PC - Toner Waste Bottle - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color and 150,000 B&W

4 Each

144 Class PC - Staples - 3 month ship pack 8 Each 145 Class PC - Staples - 6 month ship pack 7 Each 146 Class PC - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 3 Each

147 Class PC - Repair Parts Kits (for 3 copier) Provide Parts List and Quantity/Kit

5 Each

148 Class PC - Additional Unique Tool Kits 1 Each 149 Class PC - Additional Technical Manuals - Print Shop CPC 1 Each 150 Class PC - Contractor's Facility - CONUS-Per Trainee 21 Each 151 Class PC - Government's Facility - OCONUS-Per Trainee 2 Each 152 Class PC -Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

153 Class PC - Full Services Maintenance. Agreement Per Month 1 Month 154 Class Production B/W (PWB) Copier/Printer 30 Each 155 Class PBW - Installation Charge - CONUS 29 Each 156 Class PBW - Installation Charge - OCONUS 1 Each 157 Class PBW - Vibration Mount - Surface Vessels 30 Each 158 Class PBW - Removal and Disposal Charge 30 Each 159 Class PBW - Preventative Maintenance. CONUS - per machine 1 Each 160 Class PBW - Preventative Maintenance. OCONUS - per machine 1 Each 161 Class PBW - Toner Kits, Black - 3 month ship pack

Calculate Total Cost for 540,000 impressions 52 Each

162 Class PBW - Toner Kits, Black - 6 month ship pack Calculate Total Cost for 1,080,000 impressions

12 Each

163 Class PBW - Toner Waste Bottle - 3 month ship pack Calculate Total Cost for 540,000 impressions

44 Each

164 Class PBW - Toner Waste Bottle - 6 month ship pack Calculate Total Cost for 1,080,000 impressions

5 Each

165 Class PBW - Staples - 3 month ship pack 45 Each 166 Class PBW - Staples - 6 month ship pack 16 Each 167 Class PBW - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 3 Each

168 Class PBW - Repair Parts Kits (for 2 copier) Provide Parts List and Quantity/Kit

4 Each

169 Class PBW - Additional Unique Tool Kits 1 Each 170 Class PBW - Additional Technical Manuals - Print Shop BW 1 Each 171 Class PBW - Contractor's Facility - CONUS-Per Trainee 20 Each 172 Class PBW - Government's Facility - OCONUS-Per Trainee 1 Each 173 Class PBW - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

174 Class PBW - Full Services Maintenance. Agreement Per Month 1 Month 175 Service Call - CONUS - Regular (up to 1 Hr.) 2134 Each 176 Service Call - CONUS - After Hours (up to 1 Hr.) 22 Each

SP7000-13-R-1026 Amendment 0012 Page 8 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

177 Service Call - CONUS -Weekends & Holidays (up to 1 Hr.) 20 Each 178 Service Call - OCONUS - Regular (up to 1 Hr.) 592 Each 179 Service Call - OCONUS - After Hours (up to 1 Hr.) 28 Each 180 Service Call - OCONUS -Weekends & Holidays (up to 1 Hr.) 20 Each 181 West Coast Rider Monthly Services for Carriers/Amphibs 159 Month 182 East Coast Rider Monthly Services for Carriers/Amphibs 366 Month

OPTION: 5 YEAR MAINTENANCE, SUPPORT, AND SUPPLIES

ESTIMATED POP: 01 OCT 2018 - 30 SEP 2023

183 Class I - Removal and Disposal Charge 730 Each 184 Class 1 - Prev. Maintenance CONUS - per machine 30 Each 185 Class 1 - Prev. Maintenance OCONUS - per machine 2 Each 186 Class 1 - Toner Kits - 3 month ship pack

Calculate Total Cost for 15,000 Impressions of print 850 Each

187 Class 1 - Toner Kits - 6 month ship pack Calculate Total Cost for 30,000 Impressions of print

330 Each

188 Class 1 - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

50 Each

189 Class 1 - Repair Parts Kits (for 2 copiers) List by Item Name and Quantity/Kit

25 Each

190 Class 1 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

120 Each

191 Class 1 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

30 Each

192 Class 1 - Additional Unique Tool Kits 10 Each 193 Class 1 - Additional Technical Manuals - Class I 8 Each 194 Class 1 - Contractor's Facility - CONUS-Per Trainee 585 Each 195 Class 1 - Government's Facility - OCONUS-Per Trainee 6 Each 196 Class 1 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

197 Class 1 - Full Services Maintenance. Agreement Per Month 1 Month 198 Class 1C - Removal and Disposal Charge 62 Each 199 Class 1C - Prev. Maintenance CONUS - per machine 20 Each 200 Class 1C- Prev. Maintenance OCONUS - per machine 2 Each 201 Class 1C- Toner Color Kits- 3 month ship pack

Calculate Total Cost for 15,000 Impressions BW/3,000 Impressions Color 65 Each

202 Class 1C - Toner Color Kits- 6 month ship pack Calculate Total Cost for 30,000 Impressions BW/6,000 Impressions Color

144 Each

203 Class 1C - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

3 Each

204 Class 1C - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

9 Each

205 Class 1C - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

5 Each

206 Class 1C- Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

2 Each

207 Class 1C - Additional Unique Tool Kits 2 Each 208 Class 1C- Additional Technical Manuals 1 Each 209 Class 1C- Contractor's Facility - CONUS Training 13 Each 210 Class 1C - Government's Facility - OCONUS Training 1 Each

SP7000-13-R-1026 Amendment 0012 Page 9 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

211 Class 1C - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

212 Class 1C - Full Services Maintenance. Agreement Per Month 1 Month 213 Class 2 - Removal and Disposal Charge 152 Each 214 Class 2 - Prev. Maintenance CONUS - per machine 12 Each 215 Class 2 - Prev. Maintenance OCONUS - per machine 1 Each 216 Class 2 - Toner Kits- 3 month ship pack

Calculate Total Cost for 60,000 Impressions BW 182 Each

217 Class 2 - Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions BW

188 Each

218 Class 2 - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

11 Each

219 Class 2 - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

13 Each

220 Class 2 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

4 Each

221 Class 2 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

1 Each

222 Class 2 - Additional Unique Tool Kits 9 Each 223 Class 2 - Additional Technical Manuals 1 Each 224 Class 2 - Contractor's Facility - CONUS Training 51 Each 225 Class 2 - Government's Facility - OCONUS Training 1 Each 226 Class 2 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

227 Class 2 - Full Services Maintenance. Agreement Per Month 1 Month 228 Class 3 - Removal and Disposal Charge 706 Each 229 Class 3 - Prev. Maintenance CONUS - per machine 19 Each 230 Class 3 - Prev. Maintenance OCONUS - per machine 1 Each 231 Class 3 - Toner Kits - 3 month ship pack

Calculate Total Cost for 120,000 Impressions BW 418 Each

232 Class 3 - Toner Kits - 6 month ship pack Calculate Total Cost for 240,000 Impressions BW

253 Each

233 Class 3 - Staples - 3 month ship pack 90 Each 234 Class 3 - Staples - 6 month ship pack 67 Each 235 Class 3 - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 11 Each

236 Class 3 - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

34 Each

237 Class 3 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

106 Each

238 Class 3 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

7 Each

239 Class 3 - Additional Unique Tool Kits 5 Each 240 Class 3 - Additional Technical Manuals - Class I 1 Each 241 Class 3 - Contractor's Facility - CONUS Training 248 Each 242 Class 3 - Government's Facility - OCONUS Training 1 Each

SP7000-13-R-1026 Amendment 0012 Page 10 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

243 Class 3 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

244 Class 3 - Full Services Maintenance. Agreement Per Month 1 Month 245 Class 3C - Removal and Disposal Charge 279 Each 246 Class 3C - Prev. Maintenance CONUS - per machine 1 Each 247 Class 3C - Prev. Maintenance OCONUS - per machine 3 Each 248 Class 3C - Black Toner Kits - 3 month ship pack

Calculate Total Cost for 120,000 Impressions B&W 492 Each

249 Class 3C - Black Toner Kits - 6 month ship pack Calculate Total Cost for 240,000 Impressions B&W

20 Each

250 Class 3C - Cyan Toner Kits - 3 month ship pack Calculate Total Cost for 60,000 Impressions Color

206 Each

251 Class 3C - Cyan Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions Color

50 Each

252 Class 3C - Magenta Toner Kits - 3 month ship pack Calculate Total Cost for 60,000 Impressions Color

200 Each

253 Class 3C - Magenta Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions Color

46 Each

254 Class 3C - Yellow Toner Kits - 3 month ship pack Calculate Total Cost for 60,000 Impressions Color

203 Each

255 Class 3C - Yellow Toner Kits - 6 month ship pack Calculate Total Cost for 120,000 Impressions Color

48 Each

256 Class 3C - Repair Parts Kits (for 1 copier) Provide Parts List and Quantity/Kit

11 Each

257 Class 3C - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

72 Each

258 Class 3C - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

3 Each

259 Class 3C - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

1 Each

260 Class 3C - Additional Unique Tool Kits 2 Each 261 Class 3C - Additional Technical Manuals - Class IV 1 Each 262 Class 3C - Contractor's Facility - CONUS-Per Trainee 101 Each 263 Class 3C - Government's Facility - OCONUS-Per Trainee 1 Each 264 Class 3C - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

265 Class 3C - Full Services Maintenance. Agreement Per Month 1 Month 266 Class 4 - Removal and Disposal Charge 155 Each 267 Class 4 - Prev. Maintenance CONUS - per machine 1 Each 268 Class 4 - Prev. Maintenance OCONUS - per machine 1 Each 269 Class 4 - Toner Kits - 3 month ship pack

Calculate Total Cost for 270,000 Impressions 122 Each

270 Class 4 - Toner Kits - 6 month ship pack Calculate Total Cost for 540,000 Impressions

45 Each

271 Class 4 - Staples - 3 month ship pack 86 Each 272 Class 4 - Staples - 6 month ship pack 16 Each 273 Class 4 - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 8 Each

SP7000-13-R-1026 Amendment 0012 Page 11 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

274 Class 4 - Repair Parts Kits (for 2 copiers) Provide Parts List and Quantity/Kit

27 Each

275 Class 4 - Repair Parts Kits (for 5 copiers) Provide Parts List and Quantity/Kit

13 Each

276 Class 4 - Repair Parts Kits (for 10 copiers) Provide Parts List and Quantity/Kit

3 Each

277 Class 4 - Additional Unique Tool Kits 3 Each 278 Class 4 - Additional Technical Manuals - Class 4 1 Each 279 Class 4 - Contractor's Facility - CONUS-Per Trainee 56 Each 280 Class 4 - Government's Facility - OCONUS-Per Trainee 1 Each 281 Class 4 - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

282 Class 4 - Full Services Maintenance. Agreement Per Month 1 Month 283 Class PC - Removal and Disposal Charge 72 Each 284 Class PC - Preventative Maintenance. CONUS - per machine 1 Each 285 Class PC - Preventative Maintenance. OCONUS - per machine 1 Each 286 Class PC - Toner Kits, Black - 3 month ship pack

Calculate Total Cost for 75,000 Impressions B&W 16 Each

287 Class PC - Toner Kits, Black - 6 month ship pack Calculate Total Cost for 150,000 Impressions B&W

4 Each

288 Class PC - Toner Kits, Cyan - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color

12 Each

289 Class PC - Toner Kits, Cyan - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color

4 Each

290 Class PC - Toner Kits, Magenta - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color

11 Each

291 Class PC - Toner Kits, Magenta - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color

4 Each

292 Class PC - Toner Kits, Yellow - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color

11 Each

293 Class PC - Toner Kits, Yellow - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color

4 Each

294 Class PC - Toner Waste Bottle - 3 month ship pack Calculate Total Cost for 540,000 Impressions Color and 75,000 B&W

9 Each

295 Class PC - Toner Waste Bottle - 6 month ship pack Calculate Total Cost for 1,080,000 Impressions Color and 150,000 B&W

4 Each

296 Class PC - Staples - 3 month ship pack 8 Each 297 Class PC - Staples - 6 month ship pack 7 Each 298 Class PC - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 3 Each

299 Class PC - Repair Parts Kits (for 3 copier) Provide Parts List and Quantity/Kit

5 Each

300 Class PC - Additional Unique Tool Kits 1 Each 301 Class PC - Additional Technical Manuals - Print Shop CPC 1 Each 302 Class PC - Contractor's Facility - CONUS-Per Trainee 21 Each 303 Class PC - Government's Facility - OCONUS-Per Trainee 2 Each 304 Class PC -Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

305 Class PC - Full Services Maintenance. Agreement Per Month 1 Month

SP7000-13-R-1026 Amendment 0012 Page 12 of 48

CLIN Volume Band Estimated Units for Evaluation Purposes

Unit Unit Price Total Cost

306 Class PBW - Removal and Disposal Charge 30 Each 307 Class PBW - Preventative Maintenance. CONUS - per machine 1 Each 308 Class PBW - Preventative Maintenance. OCONUS - per machine 1 Each 309 Class PBW - Toner Kits, Black - 3 month ship pack

Calculate Total Cost for 540,000 impressions 52 Each

310 Class PBW - Toner Kits, Black - 6 month ship pack Calculate Total Cost for 1,080,000 impressions

12 Each

311 Class PBW - Toner Waste Bottle - 3 month ship pack Calculate Total Cost for 540,000 impressions

44 Each

312 Class PBW - Toner Waste Bottle - 6 month ship pack Calculate Total Cost for 1,080,000 impressions

5 Each

313 Class PBW - Staples - 3 month ship pack 45 Each 314 Class PBW - Staples - 6 month ship pack 16 Each 315 Class PBW - Repair Parts Kits (for 1 copier)

Provide Parts List and Quantity/Kit 3 Each

316 Class PBW - Repair Parts Kits (for 2 copier) Provide Parts List and Quantity/Kit

4 Each

317 Class PBW - Additional Unique Tool Kits 1 Each 318 Class PBW - Additional Technical Manuals - Print Shop BW 1 Each 319 Class PBW - Contractor's Facility - CONUS-Per Trainee 20 Each 320 Class PBW - Government's Facility - OCONUS-Per Trainee 1 Each 321 Class PBW - Individual Parts Will NOT be evaluated.

Provide Parts List with prices for all non wearable items. Provide a parts list with prices for all wearable parts and their yield or expected lifecycle. Pricing will not exceed Manufactured Retail Price.

N/A N/A N/A N/A

322 Class PBW - Full Services Maintenance. Agreement Per Month 1 Month 323 Service Call - CONUS - Regular (up to 1 Hr.) 2134 Each 324 Service Call - CONUS - After Hours (up to 1 Hr.) 22 Each 325 Service Call - CONUS -Weekends & Holidays (up to 1 Hr.) 20 Each 326 Service Call - OCONUS - Regular (up to 1 Hr.) 592 Each 327 Service Call - OCONUS - After Hours (up to 1 Hr.) 28 Each 328 Service Call - OCONUS -Weekends & Holidays (up to 1 Hr.) 20 Each 329 West Coast Rider Monthly Services for Carriers/Amphibs 159 Month 330 East Coast Rider Monthly Services for Carriers/Amphibs 366 Month

TOTAL:

Amendment 0012
Amendment 0011
Amendment 10
Amendment 02
Amendment 02
Summary of changes to Solicitation SP700013R1026-02
SF1449 REVISED
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
SECTION C-E
52.237-3 Continuity of Services (Jan 1991)
52.246-2 Inspection of Supplies -- Fixed-Price (Aug. 1996)
52.247-34 F.o.b. – Destination (Nov 1991)
52.204-2 -- Security Requirements (Aug. 1996)
52.204-9 -- Personal Identity Verification of Contractor Personnel (Jan 2011)
52.216-1 -- Type of Contract (Apr 1984)
52.216-18 – Ordering (Oct 1995)
52.216-19 -- Order Limitations (Oct 1995)
52.216-22 -- Indefinite Quantity (Oct 1995)
52.228-5 -- Insurance -- Work on a Government Installation (Jan 1997)
52.212-3 -- Offeror Representations and Certifications -- Commercial Items (Dec 2012)
52.222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification (Feb 2009).
52.217-5 -- Evaluation of Options (Jul 1990)
Revised SMCP Procurement Performance Work Statement Amendment 02
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
SP7000-13-R-1026 Soliciatation Replies to Questions received
Replies
Additional Questions
Solicitation SP7000-13-R-1026 Section B - CLINS.pdf
SMCP CLINS
PWS Enclosure B thru E Contractor SMCP Monthly Reports Format.pdf
INSTALLS & DELIVERIES
TRAINING
TECHNICAL SUPPORT SERVICES
RETURNED PARTS CREDIT
Solicitation SP7000-13-R-1026 Section B - CLINS Amend 03.pdf
SMCP CLINS
SF1449 REVISED.pdf
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Revised SMCP Procurement Performance Work Statement Amendment 03.pdf
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
Price Evaluation Sheet SP7000-13-R-1026 Ver 2.pdf
SMCP CLINS
Price Evaluation Sheet SP7000-13-R-1026 Ver 2.pdf
SMCP CLINS
Section B CLIN Structure Ver 3.pdf
SMCP CLINS
Summary of changes to Solicitation SP700013R1026-10
Section B CLIN Structure Ver 4
SMCP CLINS

Response to Questions Set 7

Summary of changes to Solicitation SP700013R1026-0011
SPECIFIC MINIMUM COLOR PRODUCTION REQUIREMENTS FOR PRINT SHOP PERFORMANCE
SPECIFIC MINIMUM B&W PRODUCTION REQUIREMENT FOR PRINT SHOP PERFORMANCE
Amendment 0011.pdf
SF1449 REVISED
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Section B CLIN Structure Ver 4
SMCP CLINS
Section C-E
Amendment 02
Amendment 02
Summary of changes to Solicitation SP700013R1026-02
SF1449 REVISED
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
SECTION C-E
52.237-3 Continuity of Services (Jan 1991)
52.246-2 Inspection of Supplies -- Fixed-Price (Aug. 1996)
52.247-34 F.o.b. – Destination (Nov 1991)
52.204-2 -- Security Requirements (Aug. 1996)
52.204-9 -- Personal Identity Verification of Contractor Personnel (Jan 2011)
52.216-1 -- Type of Contract (Apr 1984)
52.216-18 – Ordering (Oct 1995)
52.216-19 -- Order Limitations (Oct 1995)
52.216-22 -- Indefinite Quantity (Oct 1995)
52.228-5 -- Insurance -- Work on a Government Installation (Jan 1997)
52.212-3 -- Offeror Representations and Certifications -- Commercial Items (Dec 2012)
52.222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification (Feb 2009).
52.217-5 -- Evaluation of Options (Jul 1990)
Revised SMCP Procurement Performance Work Statement Amendment 02
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
SP7000-13-R-1026 Soliciatation Replies to Questions received
Replies
Additional Questions
Solicitation SP7000-13-R-1026 Section B - CLINS.pdf
SMCP CLINS
PWS Enclosure B thru E Contractor SMCP Monthly Reports Format.pdf
INSTALLS & DELIVERIES
TRAINING
TECHNICAL SUPPORT SERVICES
RETURNED PARTS CREDIT
Solicitation SP7000-13-R-1026 Section B - CLINS Amend 03.pdf
SMCP CLINS
SF1449 REVISED.pdf
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Revised SMCP Procurement Performance Work Statement Amendment 03.pdf
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
Section B CLIN Structure Ver 4.pdf
SMCP CLINS
SMCP Procurement Performance Work Statement 5-23-13
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
Enclosure B-E
Amendment 02
Amendment 02
Summary of changes to Solicitation SP700013R1026-02
SF1449 REVISED
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
SECTION C-E
52.237-3 Continuity of Services (Jan 1991)
52.246-2 Inspection of Supplies -- Fixed-Price (Aug. 1996)
52.247-34 F.o.b. – Destination (Nov 1991)
52.204-2 -- Security Requirements (Aug. 1996)
52.204-9 -- Personal Identity Verification of Contractor Personnel (Jan 2011)
52.216-1 -- Type of Contract (Apr 1984)
52.216-18 – Ordering (Oct 1995)
52.216-19 -- Order Limitations (Oct 1995)
52.216-22 -- Indefinite Quantity (Oct 1995)
52.228-5 -- Insurance -- Work on a Government Installation (Jan 1997)
52.212-3 -- Offeror Representations and Certifications -- Commercial Items (Dec 2012)
52.222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification (Feb 2009).
52.217-5 -- Evaluation of Options (Jul 1990)
Revised SMCP Procurement Performance Work Statement Amendment 02
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
SP7000-13-R-1026 Soliciatation Replies to Questions received
Replies
Additional Questions
Solicitation SP7000-13-R-1026 Section B - CLINS.pdf
SMCP CLINS
PWS Enclosure B thru E Contractor SMCP Monthly Reports Format.pdf
INSTALLS & DELIVERIES
TRAINING
TECHNICAL SUPPORT SERVICES
RETURNED PARTS CREDIT
Solicitation SP7000-13-R-1026 Section B - CLINS Amend 03.pdf
SMCP CLINS
SF1449 REVISED.pdf
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Revised SMCP Procurement Performance Work Statement Amendment 03.pdf
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
Section B CLIN Structure Ver 4.pdf
SMCP CLINS
Amendment 11.pdf
SF1449 REVISED
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Section B CLIN Structure Ver 4
SMCP CLINS
Section C-E
Amendment 02
Amendment 02
Summary of changes to Solicitation SP700013R1026-02
SF1449 REVISED
SF1449
Continuation Sheet
FY13
FY14
FY15
FY16
FY17
TCC - All CLINs
TCC - CLIN 1
TCC - CLIN 2
TCC - CLIN 3
TCC - CLIN 4
TCC - CLIN 15
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
Award Continuation Sheet.pdf
FY13
FY14
FY15
FY16
FY17
SECTION C-E
52.237-3 Continuity of Services (Jan 1991)
52.246-2 Inspection of Supplies -- Fixed-Price (Aug. 1996)
52.247-34 F.o.b. – Destination (Nov 1991)
52.204-2 -- Security Requirements (Aug. 1996)
52.204-9 -- Personal Identity Verification of Contractor Personnel (Jan 2011)
52.216-1 -- Type of Contract (Apr 1984)
52.216-18 – Ordering (Oct 1995)
52.216-19 -- Order Limitations (Oct 1995)
52.216-22 -- Indefinite Quantity (Oct 1995)
52.228-5 -- Insurance -- Work on a Government Installation (Jan 1997)
52.212-3 -- Offeror Representations and Certifications -- Commercial Items (Dec 2012)
52.222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification (Feb 2009).
52.217-5 -- Evaluation of Options (Jul 1990)
Revised SMCP Procurement Performance Work Statement Amendment 02
2. GENERAL INFORMATION
3. PHASE-IN and PHASE-OUT
4. SUPPORT CLASSIFICATIONS
5. CONTRACTOR FURNISHED ITEMS/SUPPLIES/SUPPORT SERVICE (CONUS)
6. SHIPBOARD RIDER SUPPORT SERVICES
7. SHORE-BASED CONTRACTOR SUPPORT TECHNICIAN
8. MAINTENANCE/REPAIR RESPONSIBILITIES (NON SHIPBOARD RIDERS)
9. FULL SERVICE MAINTENANCE AGREEMENT
10. PREVENTATIVE MAINTENANCE
11. EQUIPMENT WARRANTY
12. PARTS SUPPORT
14. IMPROVEMENTS
15. UNIQUE TOOLS AND TOOL KITS
16. TRAINING
17. CONTRACTOR PROGRAM REVIEWS AND REPORTS
18. EQUIPMENT TEST REQUIREMENTS
19. NETWORK FUNCTIONALITY & SECURITY REQUIREMENTS
20. EQUIPMENT IDENTIFICATION AND SERVICE LABELS
21. GENERAL MINIMUM REQUIREMENTS FOR COPIER PERFORMANCE
23. SPECIFIC MINIMUM REQUIREMENTS FOR PRINT SHOP PERFORMANCE
24. FEDERAL SPECIFICATIONS OR STANDARDS
25. QUALITY CONTROL PLAN
26. QUALITY ASSURANCE – PERFORMANCE STANDARDS
SP7000-13-R-1026 Soliciatation Replies to Questions received
Replies
Additional Questions
Solicitation SP7000-13-R-1026 Section B - CLINS.pdf
SMCP CLINS

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .