This solicitation is for a full conversion of the boiler system at Building 27 of the Defense Supply Center in Columbus, Ohio. The existing steam boiler system will be removed and a new hot water boiler system installed. The work includes all demolition, repair work, and installation required. The contract value is between $1,000,000 and $5,000,000. This is a 100% small business set aside issued by the Defense Logistics Agency. The period of performance is 540 calendar days from the notice to proceed. A mandatory site visit will be held on June 30, 2021, and questions about the solicitation are due by July 1, 2021. Responses are required to include a signed SF1442, bid form, bid bond, past performance information, a contract management plan, and resumes. A single award firm fixed price contract will be made to the responsible offeror with acceptable past performance submitting the lowest evaluated price proposal meeting the solicitation requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_SP470221R00180001.pdf | ||
| Updated Attachment 10 - Bid Form.pdf | ||
| Attachment 12 - Drawings 4-582.pdf | ||
| RFIs for SP4702-21-R-0018.pdf | ||
| Final Bldg 27 ACM Survey.pdf | ||
| Updated Solicitation SP4702-21-R-0018.pdf | ||
| Updated Attachment 2 - SOW and Complete Specs.pdf | ||
| Attachment 4 - CAC Procedures.pdf | ||
| Attachment 7 - DSCC Excavation Permit.pdf | ||
| Attachment 2 - SOW and Complete Specs.pdf | ||
| Attachment 6 - ENG Form 93.pdf | ||
| Attachment 8 - ENG Form 4025-R.pdf | ||
| Attachment 9 - Contractor Access Badge Request Form.xlsx | XLSX spreadsheet | |
| Attachment 11 - Submittal Register.xlsx | XLSX spreadsheet | |
| Solicitation SP4702-21-R-0018.pdf | ||
| Attachment 1 - Clauses and Evaluation Criteria.pdf | ||
| Attachment 3 - Drawing Package.pdf | ||
| Attachment 5 - Wage Rate Determination OH20210078.pdf | ||
| Attachment 10 - Bid Form.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARS
Environmental Inc.
LIMITED ASBESTOS-
CONTAINING MATERIAL
REVIEW – BUILDING #27
Defense Supply Center Columbus 3990 East Broad Street Columbus, OH 43213
CONTRACT # W912QR-11D-0022
TASK ORDER # 0001
PREPARED FOR
US Army Corps of Engineers – Louisville District 600 Dr. Martin Luther King, Jr. Place Louisville, Kentucky 40202
And:
Defense Logistics Agency Defense Supply Center – Columbus 3990 East Broad Street Columbus, Ohio 43213
PREPARED BY
PARS Environmental, Inc.
500 Horizon Drive, Suite 540 Robbinsville, New Jersey 08691 609-890-7277 609-890-9116 (fax)
PARS PROJECT NO. 773-24a
OCTOBER 2012
PARS
Limited Asbestos-Containing Material Review
Building # 27 October 2012
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 APPLICABLE REGULATIONS
3.0 ASBESTOS SURVEY RATIONALE AND REQUIREMENTS
4.0 BUILDING RECONNAISSANCE
5.0 FINDINGS
6.0 SURVEY ESTIMATE
7.0 CONCLUSIONS
8.0 LIMITATIONS
9.0 RELIANCE
APPENDIX A
Site Photographs
APPENDIX B
Available Historical Asbestos Survey Data i
PARS Limited Asbestos-Containing Material Review Building # 27 October 2012
1.0 INTRODUCTION
PARS Environmental, Inc. (PARS), under contract to the US Army Corps of Engineers (USACE), Louisville District, has prepared this Historical Asbestos Report Review and Site Reconnaissance Report for the Defense Logistics Agency, Defense Supply Center-Columbus (DLA-DSCC), Building #27, located at 3990 East Broad Street, Columbus, Ohio.
The purpose was to review historical asbestos reports and determine the presence of suspect ACM or confirmed ACM in the building, summarize our findings and propose any additional services needed to determine the work necessary to comply with current National Emission Standards for Hazardous Air Pollutions (NESHAP), Occupational Safety and Health Administration (OSHA), Ohio Department of Health (ODH), Ohio Environmental Protection Agency (OEPA), and Department of Transportation (DOT) regulations prior to the renovation or demolition of the subject buildings.
Specifically, PARS provided the following services:
• Onsite review of historical asbestos reports available for each building.
• Conduct a reconnaissance of accessible areas of each building for the presence of suspect
ACM (sampling was not included in this SOW).
• Evaluate the completeness and validity of the historical asbestos survey information and data in the respective asbestos reports, as it pertains to current regulations, to what was observed during the building reconnaissance.
• Summarized the findings of the evaluation of the current site conditions in the building, and identify what information and/or data are needed to comply with the current applicable regulations regarding ACM management during renovation or demolition of the building.
The subject building encompasses approximately 139,000 square feet and is a one-story mixed-use building. The building is steel-framed with brick exterior. There are, effectively, two roofs on this building. The original built-up arched roof was enclosed and covered with another pitched built-up roof and membrane. A layer of blown-in fibrous insulation covers the enclosed original built-up arched roof. The interior finishes consist of numerous finishes including carpet, vinyl floor tile, ceiling tile, and drywall with joint compound. The structure is primarily heated with a natural gas boiler and supplemental heat is provided by forced-air, natural gas furnaces.
Photographs from the May 18, 2012 site reconnaissance are included in Appendix A.
2.0 APPLICABLE REGULATIONS
The following asbestos-related regulations are potentially applicable during future renovation or demolition of the subject structure.
Occupational Safety and Health Administration’s (OSHA) Asbestos General Industry Standard
(29 CFR 1910.1001)
OSHA’s Asbestos in Construction Standard (29 CFR 1926.1101)
U.S. Environmental Protection Agency’s (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) (40 CFR 61 subpart M)
U.S. Department of Transportation’s (DOT) Emergency Response Communication Standards
(49 CFR 171)
DOT’s Emergency Response Information (49 CFR 172, Subpart G)
Ohio Department of Health’s (ODH) Asbestos Hazard Abatement Rules (OAC 3701-34)
Ohio Environmental Protection Agency’s (OEPA) Asbestos Emissions Control
OAC 3745-20
3.0 ASBESTOS SURVEY RATIONALE AND REQUIREMENTS
According to NESHAP, OEPA and ODH regulations, an owner or operator of a facility must thoroughly inspect a facility for the presence, type, quantity and condition of ACM where demolition or renovation activities will occur. ACM is any material that contains more than one percent asbestos.
The U.S. EPA and OSHA requires the use of Asbestos Hazard Emergency Response Act (AHERA) sampling protocols for building surveys to ensure a thorough survey of the facility is conducted.
PARS used these sampling protocols and requirements, in part, to determine the completeness and/or validity of previous asbestos assessments conducted on this building.
http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div8&view=text&node=29:6.1.1.1.1.1.1.2&idno=29 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div8&view=text&node=29:6.1.1.1.1.1.1.2&idno=29 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div8&view=text&node=29:8.1.1.1.1.26.25.2&idno=29 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div6&view=text&node=40:8.0.1.1.1.13&idno=40 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div6&view=text&node=40:8.0.1.1.1.13&idno=40 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Title49/49cfr171_main_02.tpl http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Title49/49cfr171_main_02.tpl http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&sid=3579d9bd7cb58870fc402a65e98f3317&rgn=div6&view=text&node=49:2.1.1.3.8.7&idno=49 http://www.odh.ohio.gov/rules/final/f3701-34.aspx http://www.epa.ohio.gov/dapc/regs/3745_20.aspx http://www.epa.ohio.gov/dapc/regs/3745_20.aspx
4.0 BUILDING RECONNAISSANCE
Prior to performing the building reconnaissance, available historical asbestos reports and records were provided for review of Building #27. The documents are included in Appendix A. The contents of the historical asbestos reports were compared to the findings of the building reconnaissance to determine what, if any, additional assessment is necessary to comply with current applicable regulations for renovation and/or demolition.
During the review, suspected ACM were grouped into homogeneous areas. A homogeneous area contains material that is uniform in color and texture.
Wade C. Morris, Ohio-Certified Asbestos Hazard Evaluation Specialist (No. ES35408), conducted the site reconnaissance on May 18, 2012, and determined that fifteen (15) homogeneous areas (in accessible areas of the building) exist in or on this building. Table 1 inventories these homogeneous areas.
5.0 FINDINGS
Based on historical bulk sampling activities and laboratory reports and the reconnaissance of this building, homogeneous areas were further classified as ACM, non-ACM, or presumed ACM (PACM). PACM is the classification used when no bulk samples, or an insufficient amount of bulk samples were collected per regulations to adequately determine if the suspect material is ACM. Table 1 presents the findings of this review. The quantities are general estimates and should only be used for general estimation purposes.
Table 1. Summary of ACM and PACM at Building 27
Hom.
Area
ID
Homogeneous Area Location(s)
Identified in Historical
Survey Report?
ACM/
Non-
ACM/
PACMa
Photob Approx.
Quantity
Action Required
Approx.
Abatement
Costc
12”x12”pinkish floor tile w/ associated mastic Section 5 No PACM 1 550 ft2
Complete Assessmentd
$1,238
12”x12” tan textured floor tile w/ associated mastic
Section 5 No PACM 1 250 ft2 Complete
Assessment $563
12”x12” orange floor tile w/ associated mastic Section 5 No PACM 2 1,000 ft2
Complete Assessment
$2,250
4 1.5’x4’ tectum ceiling tile Sections 1, 2 and 3 No PACM 4 70,000 ft2
Complete Assessment
$140,000
Thermal System
Insulation (TSI) – Aircell Section 3 Yes ACM 5 750 ft2 None $7,500
6 TSI – Mud fittings Section 3 Yes ACM 5 250 each None $6,250
Drywall and joint compound Sections 4 and
No PACM 6 10,000 ft2
Complete Assessment
$45,000
8 Tan cove base mastic Section 4 No PACM 6 200 ft Complete
Assessment $400
9 Grey cove base mastic Section 4 No PACM 7 200 ft Complete
Assessment $400
10 Fire doors (standard size) Throughout structure No PACM 8 20 each
Complete Assessment
$2,000
11 Fire doors (industrial size) Throughout structure No PACM 8 2 each
Complete Assessment
$400
12 Floor filler Throughout structure No PACM 2 13,900 ft2
Complete Assessment
$55,600
13 Window glazing Sections 1 and
No PACM 9 windows
Complete Assessment
$30,000
14 Blown-in insulation Throughout structure No PACM -- 139,000 ft2
Complete Assessment
$41,700
15 Roofing material Throughout structure No PACM -- 139,000 ft2
Complete Assessment
$278,000 aACM/Non-ACM/PACM – As determined from historical laboratory results.
bPhotographs are presented in Appendix A cApproximate abatement cost does not include the cost for the required asbestos survey.
d Complete Assessment – Homogeneous area was not identified in historical survey reports and requires a complete assessment to determine as ACM or Non-ACM.
6.0 SURVEY ESTIMATE
According to NESHAP, OEPA and ODH regulations, an owner or operator of a facility must thoroughly inspect a facility for the presence, type, quantity and condition of ACM where demolition or renovation activities will occur. PARS estimates the cost of a full asbestos survey (survey, sampling, and report) for Building #27 to be approximately $4,100. This is a rough estimate only and should not be construed as a cost proposal. Additional samples may be necessary depending on site conditions.
7.0 CONCLUSIONS
The historical asbestos documents are not compliant with current regulatory requirements applicable to renovation and/or demolition activities at Building #27.
In addition to the required actions listed in Table 1, the following information is needed:
a) Findings of an intrusive investigation for ACM.
b) Bulk sample chains-of-custody.
8.0 LIMITATIONS
This review was limited to available historical asbestos reports, records, and the reconnaissance of accessible areas of the building and, therefore, is subject to change as further investigation is performed. Sampling was not part of the SOW and therefore, ACM may be present in concealed areas.
9.0 RELIANCE
The information contained herein was compiled from historical asbestos documentation supplied by DLA-DSCC and is assumed to be reliable for the time the information was gathered. This report is for the benefit of DLA-DSCC for informational purposes only. Reliance on this document by any other party is forbidden without the written consent of PARS and that party's acceptance of mutually agreeable terms and conditions. Use of this report for purposes beyond those reasonably intended by PARS Environmental will be at the sole risk of that party.
APPENDIX A
Site Photographs
Photograph 1:
12”x12” pinkish and 12”x12” tan textured floor tiles w/ associated mastic as found in restrooms in section 5 of Building #27.
Photograph 2:
12”x12” orange floor tile w/ associated mastic and floor filler (indicated by red arrow) as found in the gymnasium in section 5 of Building #27.
Photograph 3:
2’x4’ textured fiberglass ceiling tiles (old & new) as found in restrooms in section 5 of Building #27.
Photograph 4:
1.5’x4’ tectum ceiling tiles as found in restrooms in sections 1-3 of Building #27.
Photograph 5:
TSI – aircell and mud fittings as found in the section 3 of Building #27.
**Note both the damaged aircell and exposed mud fitting as indicated by the red arrows.
Photograph 6:
Drywall and joint compound, and tan cove base mastic as found in section 4 of Building #27.
Photograph 7:
Grey cove base mastic indicated by red arrow as found in section 4 of Building #27.
Photograph 8:
Standard and industrial-sized fire doors as found in section 2 of Building #27.
Photograph 9:
Window glazing as found in section 2 of Building #27.
APPENDIX B
Available Historical Asbestos Survey Data
LIMITED ASBESTOS-CONTAINING MATERIAL REVIEW – BUILDING #27
File details come from the government source that posted it. Updated .