Attachment 3 - Drawing Package.pdf
PDF 4 MB Posted
- Attached to
- CSC-20019; DSCC BLDG 27 Boiler Conversion Federal contract opportunity
- Solicitation number
- SP4702-21-R-0018
- Issued by
- Defense Logistics Agency
About this file
This federal contract opportunity announcement is for a boiler conversion project at the Defense Supply Center in Columbus, Ohio. The Defense Logistics Agency is seeking to remove an existing steam boiler system and install a new hot water boiler system. The work includes demolition, repair work, and new equipment installation. The project magnitude is between $1 million to $5 million. The award will be a firm fixed price contract based on lowest price from a technically acceptable offer by a responsible small business. The performance period is 540 calendar days from notice to proceed. A mandatory site visit will be held on June 30, 2021, and questions are due by July 6, 2021. Offers are due by August 10, 2021 and must include documentation such as the SF1442, bid form, bid bond, past performance, and management plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_SP470221R00180001.pdf | ||
| FinalBldg27ACMUpdate.pdf | ||
| Updated Attachment 10 - Bid Form.pdf | ||
| Attachment 12 - Drawings 4-582.pdf | ||
| Updated Solicitation SP4702-21-R-0018.pdf | ||
| Updated Attachment 2 - SOW and Complete Specs.pdf | ||
| RFIs for SP4702-21-R-0018.pdf | ||
| Final Bldg 27 ACM Survey.pdf | ||
| Solicitation SP4702-21-R-0018.pdf | ||
| Attachment 1 - Clauses and Evaluation Criteria.pdf | ||
| Attachment 5 - Wage Rate Determination OH20210078.pdf | ||
| Attachment 10 - Bid Form.pdf | ||
| Attachment 2 - SOW and Complete Specs.pdf | ||
| Attachment 6 - ENG Form 93.pdf | ||
| Attachment 8 - ENG Form 4025-R.pdf | ||
| Attachment 9 - Contractor Access Badge Request Form.xlsx | XLSX spreadsheet | |
| Attachment 11 - Submittal Register.xlsx | XLSX spreadsheet | |
| Attachment 4 - CAC Procedures.pdf | ||
| Attachment 7 - DSCC Excavation Permit.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
C T
N
O
P L
D
A T
E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
S C
A L
E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H I
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
E
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D L
M
S
A F
E T
Y
A P
P R
O V
B
Y
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
F
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E
N
C
Y
N O
N E
A p r
K E
K
I N
G L
E R
K E
I N
G L
E R
4-581
G-001
C O
V E
R
S
H E
E T
C S
C
B O
I L
R
N
V E
R S
I O
N S
B
U I L
D I N
G
INDEX OF DRAWINGS
SHEET NO. SHEET TITLE
G-001 COVER SHEET
G-002 HVAC GENERAL NOTES AND LEGEND
G-003 EXISTING CONDITIONS
A-401 FLOOR RESURFACING PLAN - BOILER ROOM
MD-101 HVAC DEMOLITION PLAN - SECTIONS 7 - 10
MD-102 HVAC DEMOLITION PLAN - SECTIONS 11-13
MD-401 HVAC DEMOLITION PLAN - BOILER ROOM
M-101 HVAC NEW WORK PLAN - SECTIONS 7 - 10
M-102 HVAC NEW WORK PLAN - SECTIONS 11 -13
M-401 HVAC NEW WORK PLAN - BOILER ROOM
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-601 HVAC SCHEDULES
M-701 BOILER CONTROLS
M-702 HEATER CONTROLS
M-703 CONTROLS NETWORK SCHEMATIC
E-102 POWER PLAN - SECTIONS 7 - 10
E-102 POWER PLAN - SECTIONS 11 - 13
E-401 POWER PLAN - BOILER ROOM
DEFENSE SUPPLY
CENTER - COLUMBUS
PROJECT NUMBER CSC-20019
D U
B
LIN
G R
A N
V
ILLE
WORTHINGTON
RD.
RIVERLEA
WESTERVILLE
GRANVILLE
R
D
M
I
L
L
E
R
S
B
U
R
G
H A
M I L T
NEW
ALBANY
C L E
V E
L A
V E
MORSE RD.
C
O
L
U
M
B
U
S
W
O
O
S
T
E
R
P
I
K
E
UPPER ARLINGTON
CANAL
W
INCHESTER
GROVEPORT
RICKENBACKER AFB
REYNOLDSBURG
JOHN GLENN
INTERNATIONAL
17TH
GROVE CITY
S T
R
IN
G
T O
W N
R
D
LANE AVE.
GRANDVIEW
HEIGHTS
OBETZ
S
H
I G
H
S
T
W
B
R O
A D
S T
E
B
R
O
MAIN ST.
BEXLEY
WHITEHALL
J A
M E
S R
D
N
H
I G
H
BRICE
COLUMBUS
COLUMBUS
AND VICINITY
SCALE IN MILES
D
S
C
C
VICINITY MAP
N
1 10 32
BOILER CONVERSIONS, BUILDING 27
LOCATION MAP
B
A-501
EXPLANATION OF DETAIL SYMBOLS
SHEET ON WHICH THE
CONDITION IS SHOWN
DETAIL IDENTIFICATION NUMBER OR
SECTION IDENTIFICATION LETTER
P
E
R
S
H
IN
E
N
U
E
O
F
O
Y
E
N
U
E
V
D
R
E
E
T
J
A
M
A
D
R
E
E
T
M
A
R
Y
L
A
E
N
U
E
R
E
E
T
V
D
P
A
T
T
N
E
"D
S
T
R
E
E
T
"E" STREET
R
E
E
T
V
D
F
O
Y
E
N
U
E
R
E
E
T
R
E
E
T
R
E
E
T
V
D
J
A
C
K
S
O
N
V
D
R
O
O
S
E
V
E
N
E
V
D
V
D
"I"
S
T
R
E
E
T
J
A
M
A
D
G
O
L
F
C
O
N
R
A
X
A
N
S
P
O
R
T
A
T
I
C
V
D
P
E
R
S
H
E
N
U
E
V
D
V
D
P
E
R
S
H
E
N
U
E
V
D
V
D
V
D
M
A
S
O
N
R
E
E
T
V
D
R
E
E
T
R
O
O
S
E
V
E
N
E
Y
E
A
R
L
I
A
D
V
D
V
D
M
A
S
N
V
D
Y
E
A
R
L
I
A
D
R
E
T
E
N
T
IO
N
P
O
N
D
R
E
T
E
N
T
IO
N
P
O
N
D
P
O
N
D
R
E
T
E
N
T
IO
N
P
O
N
D
R
E
T
E
N
T
IO
N
C
I
R
C
L
E
G
O
L
F
V
D
R
E
E
T
R
E
E
T
V
D
B
L
V
D
V
D
O
R
A
E
A
D
R
M
O
R
A
E
A
R
U
N
R
U
N
M
A
S
O
N
M
A
S
N
R
E
E
T
G
O
U
R
S
E
V
D
V
D
B
L
V
D
V
D
V
D
V
D
V
D
J
A
C
K
S
V
D
V
D
V
D
V
D
V
D
C
O
U
R
T
S
T
E
N
IS
TRUCK
LOADING
DOCK
B
E
D
F
L
O
W
E
R
P
O
A
D
F
O
Y
E
N
U
E
O
P
P
R
K
I
N
G
O
P
R
K
I
N
G
O
EN
AR
K
IN
G
PLAN
TER
PLA
NTE
R
PLA
NTE
R
PLAN
TER
PL
AN
TER
Y E A R L I N G
R O A D
V
D
S
T
E
L
Z
A
D
R
E
E
T
D
S
W
Y
D
S
Y
S
E
R
V
IC
A
D
T
H
B
L
V
D
T
H
PLA
NTE
R
PLA
NTE
R
PLAN
TER
PL
AN
TER
GATE - CLOSED
YEARLING ROAD
E. BROAD STREET
MAIN GATE
JAMES ROAD
TRUCK GATE
ROOSEVELT
LANE GATE
V
D
W
A
S
H
I
N
G
T
N
E
D
R
I
V
I
R
A
N
G
E
O
R
A
E
A
T87
45A
S
S
T
B
L V
D
EXISTING ASPHALT AREA
EXISTING "G" STREET
S
T
B
L V
D
EXISTING "H" STREET
DOCK
GREEN AREA
AM
BULATO
RY CARE
C
EN
TER
V.A.
EXISTING V.A. ROAD
EXISTING V.A. ROAD
PARKING LOT
EXIST. V.A.
PARKING LOT
EXIST. V.A.
"H" STREET
12" WATER
T
E
R
A T
F
P
S T
A N
D O
F F
D I S
T A
N C
E
EXISTING ASPHALT AREA
GREEN AREA
N E
W
G
R E
E
A
N E
W
R
O A
D W
A Y
EXISTING ASPHALT AREA
EXISTING
GREEN AREA
EXISTING
"H" STREET
EXISTING
EXISTING "G" STREET
EXISTING "H" STREET
N E
W
G
R E
E
A
T
T-
T-
T-
T-
P
O
O
L
"J
S
T
R
E
E
T
EXISTING "H" STREET
Bldg 48
VENT
VENT
G
G
G
PUBLIC SAFETY FACILITY
RESPONSE
APPROACH
X
X
X X
X X
X
X
X X
X X
XX
XX
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
WORK LOCATION
FIELD VERIFY ALL CONDITIONS
DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE
SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING
FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND
MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING
CONDITIONS.
THE CONTRACTOR SHALL CONTACT THE GOVERNMENT PRIOR TO BIDDING
FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND
INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT.
CLARIFICATIONS MADE BY THE GOVERNMENT AFTER BIDDING WILL BE
FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST.
BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL
CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS
FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING
CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE
CONTRACTOR SHALL ALERT GOVERNMENT OF ANY APPARENT
DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT.
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
EX. SIGN
AutoCAD SHX Text
8TH BLVD. &
AutoCAD SHX Text
PERSHING AVE.
AutoCAD SHX Text
USPFO PROJECT
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
CSMS PROJECT
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
AFRC PROJECT
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
EX. STOP
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
EX. SIGN
AutoCAD SHX Text
8TH BLVD. &
AutoCAD SHX Text
PERSHING AVE.
AutoCAD SHX Text
EX. SIGN
AutoCAD SHX Text
7TH BLVD. &
AutoCAD SHX Text
PERSHING AVE.
AutoCAD SHX Text
EX. STOP
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
EX. SIGN
AutoCAD SHX Text
25MPH
AutoCAD SHX Text
8TH BLVD.
AutoCAD SHX Text
TEE #7,#16
AutoCAD SHX Text
PRO SHOP
AutoCAD SHX Text
TEE #1
AutoCAD SHX Text
TEE #8
AutoCAD SHX Text
TEE #17
AutoCAD SHX Text
TEE #8
AutoCAD SHX Text
TEE #17
AutoCAD SHX Text
TEE #6
AutoCAD SHX Text
TEE #3,
AutoCAD SHX Text
AutoCAD SHX Text #4
AutoCAD SHX Text #4
AutoCAD SHX Text
TEE #2
AutoCAD SHX Text #7
AutoCAD SHX Text
TEE #7
AutoCAD SHX Text
TEE #9
AutoCAD SHX Text
POND
AutoCAD SHX Text
TURKEY RUN
AutoCAD SHX Text
TEE #3
AutoCAD SHX Text
HOLE #5 EXISTING
AutoCAD SHX Text
TEE #1
AutoCAD SHX Text 2"
AutoCAD SHX Text #4
AutoCAD SHX Text 0+00
AutoCAD SHX Text 1+00
AutoCAD SHX Text 2+00
AutoCAD SHX Text 3+00
AutoCAD SHX Text 4+00
AutoCAD SHX Text 5+00
AutoCAD SHX Text 6+00
AutoCAD SHX Text 7+00
AutoCAD SHX Text 8+00
AutoCAD SHX Text 9+00
AutoCAD SHX Text 10+00
AutoCAD SHX Text 11+00
AutoCAD SHX Text 12+00
AutoCAD SHX Text 13+00
AutoCAD SHX Text
EX GRAVEL
AutoCAD SHX Text 30"
AutoCAD SHX Text 24"
AutoCAD SHX Text 10"
AutoCAD SHX Text 12"
AutoCAD SHX Text 20"
AutoCAD SHX Text 14"
AutoCAD SHX Text
EX ASPHALT
AutoCAD SHX Text
EX ASPHALT
AutoCAD SHX Text
EX EDGE OF ASPHALT
AutoCAD SHX Text
EX WALK
AutoCAD SHX Text
EX WALK 6' WIDE
AutoCAD SHX Text
GREEN
AutoCAD SHX Text
PRACTICE
AutoCAD SHX Text
CSMS
AutoCAD SHX Text
RTI BUILDING
AutoCAD SHX Text
DETENTION AREA 1
AutoCAD SHX Text
DETENTION AREA 2
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
EX. SIGN
AutoCAD SHX Text
PT RUNNING
AutoCAD SHX Text
COURSE
AutoCAD SHX Text
FOYLE AVENUE
AutoCAD SHX Text
PERSHING AVENUE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 21A
AutoCAD SHX Text 20A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SIZE
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
P L
T
E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
S C
A L
E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D
M
S
A F
E T
Y
A P
P R
O V
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E
N
C
Y
N O
N E
A p r
K E
I N
G L
E R
K E
I N
G L
E R
4-581
G-002
H V
N
E R
T
G
E N
D
C S
C
B O
I L
N
V E
R S
I O
N S
B
U I L
D I N
G
PIPE TYPE DESCRIPTION
MECHANICAL SYMBOL LEGEND
DESCRIPTIONPLAN SYMBOLS
GENERAL NOTES:
1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH MECHANICAL DRAWING OF THIS SET. NOTES SPECIFIC TO
INDIVIDUAL MECHANICAL DRAWINGS WILL BE SHOWN ON THE RESPECTIVE MECHANICAL DRAWING.
2. THE MECHANICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, NFPA
STANDARDS, AND CONTRACT SPECIFICATIONS. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND
EQUIPMENT, AND SHALL PROVIDE ALL SERVICES AND INCIDENTALS REQUIRED TO PRODUCE A COMPLETE AND PROPERLY
OPERATING MECHANICAL SYSTEM FOR THE FACILITY.
3. DUE TO THE SMALL SCALE OF THE DRAWINGS, ALL VALVES, FITTINGS, ACCESSORIES, ETC. ARE NOT SHOWN OR
IDENTIFIED ON THE PLANS. CONTRACTOR SHALL REFER TO MECHANICAL DETAILS FOR ALL VALVES, FITTINGS, ACCESSORIES, ETC., REQUIRED. CONTRACTOR SHALL ENSURE ALL REQUIRED ITEMS ARE FURNISHED AND INSTALLED.
4. FOR MECHANICAL DETAILS, SEE SHEETS M-501 THRU M-502. MECHANICAL DETAILS MAY OR MAY NOT BE REFERENCED ON
MECHANICAL PLANS; HOWEVER, CONTRACTOR SHALL INSTALL ALL EQUIPMENT, PIPING, AND ACCESSORIES IN
ACCORDANCE WITH THE MECHANICAL DETAILS.
5. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601.
6. FOR HVAC CONTROL DRAWINGS, SEE SHEETS M-701 THRU M-703.
7. THE CONTRACTOR SHALL PERFORM ALL TESTS AS REQUIRED BY SPECIFICATIONS, APPLICABLE CODES, AND APPLICABLE
REGULATORY AGENCIES. REQUIRED TESTS SHALL BE WITNESSED BY A GOVERNMENT REPRESENTATIVE AS SPECIFIED.
8. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES TO AVOID CONFLICTS AND OBSTRUCTIONS.
9. HVAC EQUIPMENT SHALL BE LOCATED AS SHOWN. CONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS BASED ON
ACTUAL SIZES OF EQUIPMENT. CONTRACTOR SHALL PROVIDE CLEARANCES AROUND EQUIPMENT AS REQUIRED BY
MANUFACTURER'S RECOMMENDATIONS AND CODE REQUIREMENTS. EQUIPMENT SHALL BE INSTALLED TO FACILITATE
SERVICE, MAINTENANCE, REPAIR AND REPLACEMENT OF EQUIPMENT. CONNECTIONS TO EQUIPMENT SHALL BE MADE
FOR EASE OF DISCONNECT AND TO AVOID INTERFERENCE WITH OTHER INSTALLATIONS. CONTRACTOR SHALL PROVIDE
ALL DUCT AND PIPE TRANSITIONS REQUIRED FOR CONNECTIONS TO EQUIPMENT. EQUIPMENT LOCATIONS SHALL BE
COORDINATED WITH ELECTRICAL REQUIREMENTS.
10. CONTRACTOR SHALL INSTALL PIPING SYSTEMS SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND ALL
OTHER FITTINGS AND APPURTENANCES ARE EASILY ACCESSIBLE. CONTRACTOR SHALL PROVIDE AND INSTALL ALL PIPING
FITTINGS, RISES, DROPS, ETC., AS NECESSARY FOR A FULLY FUNCTIONAL PIPING SYSTEM. ALL VALVES SHALL BE
INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE OF VALVE IS
REMOVED. ALL VALVES AND STRAINERS SHALL BE FULL SIZE OF PIPE. VALVES FOR ISOLATION OF EQUIPMENT SHALL BE
FULL SIZE OF PIPE TO EQUIPMENT BEFORE REDUCTION FOR CONNECTION TO EQUIPMENT.
11. ALL FLOOR MOUNTED EQUIPMENT SHALL BE LOCATED ON NEW HOUSEKEEPING PADS.
12. ALL CONTROL WIRING SHALL BE INSTALLED IN CONDUIT. ALL CONDUIT, IN FINISHED AREAS AND EXCLUDING MECHANICAL
AND ELECTRICAL ROOMS, SHALL BE CONCEALED. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL
ELECTRICAL CODE AND WITH CONTRACT SPECIFICATIONS.
13. CUT OPENINGS, AS REQUIRED, IN THE CONSTRUCTION FOR THE INSTALLATION OF PIPING, DUCTWORK, AND EQUIPMENT.
PATCH AND REPAIR TO MATCH THE EXISTING ADJACENT CONSTRUCTION AND TO MAINTAIN THE RATING OF
CONSTRUCTION. THE ANNULAR SPACE OF ALL PENETRATIONS SHALL BE FILLED WITH AN APPROVED MATERIAL IN
COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.
L P S
C
H W R
H W S
G
F
W
B
PIPING LEGEND
CONDENSATE
LOW PRESSURE STEAM
HOT WATER SUPPLY
HOT WATER RETURN
BOILER BLOWDOWN
NATURAL GAS
DOMESTIC COLD WATER
BOILER FEEDWATER
T
THERMOSTAT
HOT WATER CIRCULATION PUMP
CONDENSING BOILER
VERTICAL UNIT HEATER
A
PIPE ANCHOR
HORIZONTAL UNIT HEATER
PIPE/EQUIPMENT TO BE DEMOLISHED
PIPE/EQUIPMENT WITH ASBESTOS
TO BE DEMOLISHED
EXPANSION TANK
CH-1 CABINET UNIT HEATER
AC-1
AIR CURTAIN
AIR SEPARATOR
CONNECTION/DISCONNECTION POINT
SECTION 7 SECTION 8 SECTION 9
SECTION 10 SECTION 11 SECTION 13SECTION 12
L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S
C
C
C
C
C C
C C
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
C
C
C
TT
T
T
T
T
T
T
T
T
T
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S
L P S
L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S
L P S L P S L P S L P S
L P S
L P S
L P S
L P S
LPSLPSLPS
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
LPS
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S
L P S
L P S
L P S
L P S
C C C C C C C C C C C C C C C C C C C C C C C C C C C
C C
C C
C C
C C
C
C C C C
C
C C
C C
C
C C
C C
C
C C C C
C
C C
C C
C C
C C
C C
C C
C C
C C
C
C C
C C
C C
C
C
C C
C C
C
C C C
C
C C
C C
C C
C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
C C C
C C
C
C C
C C
C
C
C C
C C
C C
C C
C C
C
C C C C
C C
C
C
LPS
C
L P S L P S
6"
6"
3"
3"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1-1/2"
4"
1-1/4"
1-1/4"
5"
2-1/2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
1"
2"
1"
2"
1"
2"
1"
2"
6"
3"
6"
3"
6"
3"
6"
2"
6"
3"
1"
2"
2-1/2"
1-1/4"
1"
2"
1"
2"
2-1/2"
2-1/2"
2-1/2"
1-1/4"
3"
1-1/4"
6"
2"
6"
2"
3"
1-1/4"
3"
1-1/2"
8"
2-1/2"
1-1/4"
2"
1-1/4"
1-1/4"
2-1/2"
3"
4"
1"
2"
1"
1-1/2"
1"
2"
1"
1"
2"
C
W W W
G G
G
G G
G
L P S
L P S
L P S
L P S
L P S
L P S
F
G G G
G G
W W
W
B B
F F
F F
L P S
C
LPSLPSLPSLPS
L P S
L P S
LPS
CCCC
C
C
AHU-1
AHU-2
AHU-3
GRADE
12" CONCRETE COLUMN
CONCRETE BARREL ARCH CEILING
8" BRICK WALL
METAL ROOF
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
P L
T
E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
S C
A L
E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D
M
S
A F
E T
Y
A P
P R
O V
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E
N
C
Y
O
W N
A p r
K E
I N
G L
E R
K E
I N
G L
E R
4-581
G-003
E X
I S
T I N
G
C
O N
D I T
I O
N S
C S
C
B O
I L
N
V E
R S
I O
N S
B
U I L
D I N
G
SCALE: 1/32" = 1'-0"
BUILDING 27 EXISTING CONDITIONS
BUILDING 27 SECTION (WEST FACING)
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROPOSED FOR SPRING 2016
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
TRANS.
AutoCAD SHX Text
TRUCK LOADING PLATFORM
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
VH
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
VH
AutoCAD SHX Text
SAUNA
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MEN
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VH
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
VH
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
LOADING PLATFORM
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
REST ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TRACK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
BASKETBALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
NORTH
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
P L
T
E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
S C
A L
E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D
M
S
A F
E T
Y
A P
P R
O V
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E
N
C
Y
A p r
K E
I N
G L
E R
K E
I N
G L
E R
4-581
A-401
O
S
U R
F A
C I N
G
P
L A
N
B
O I L
O
M
C S
C
B O
I L
N
V E
R S
I O
N S
B
U I L
D I N
G
SCALE: 1/4" = 1'-0"
BUILDING 27 - FLOOR RESURFACING PLAN - BOILER ROOM
SOW NOTES:
1. SURFACE PREPARATION
1.1 CONCRETE SURFACES:
REMOVE PLATES, MACHINED SURFACES, AND SIMILAR ITEMS ALREADY
IN PLACE THAT ARE NOT TO BE COATED. PROVIDE SURFACE-APPLIED
PROTECTION BEFORE SURFACE PREPARATION AND COATING WHERE
REMOVAL IS IMPRACTICAL OR IMPOSSIBLE. AFTER COMPLETING
COATING OPERATIONS, REINSTALL ITEMS THAT WERE REMOVED.
REMOVE CLEAN DIRT, OIL, GREASE, AND INCOMPATIBLE PAINTS FROM
SUBSTRATES TO ENSURE BONDING. COORDINATION OF SHOP-APPLIED
PRIME COATS WITH HIGH-PERFORMANCE COATINGS IS CRITICAL.
REMOVE INCOMPATIBLE PRIMERS. RE-PRIME SUBSTRATE WITH
COMPATIBLE PRIMERS AS REQUIRED TO PRODUCE COATING SYSTEMS
INDICATED.
CONTRACTOR SHALL PREP THE CONCRETE FLOORING, BY PATCHING
AND LEVELING OF THE FLOOR AREA AND REPAIR THE CONCRETE
FLOORS AS REQUIRED TO ACCEPT THE NEW FLOORING. SEAL CRACKS
SIZES 1/4" X 1/2" AND HIGHER USING JOINT FILLER MATERIAL FOR
CONCRETE FLOORS. REMOVE EXPANSION JOINT MATERIALS FROM
FLOOR JOINTS AND REPLACE WITH EPOXY MORTAR WITH SEMI RIGID
EPOXY SEAL.
REMOVE RELEASE AGENTS, CURING COMPOUNDS, EFFLORESCENCE,
AND CHALK MAXIMUM MOISTURE CONTENT OF CONCRETE IS 12
PERCENT. MOISTURE CONTENT MUST BE MEASURED WITH
ELECTRONIC MOISTURE METER.
CLEAN SURFACES WITH DIAMOND GRIND TO REMOVE EXISTING
COATINGS. PREPARE SURFACES USING THE METHODS
RECOMMENDED BY THE MANUFACTURER FOR ACHIEVING THE BEST
RESULT FOR THE SUBSTRATE UNDER THE PROJECT CONDITIONS.
2. COATING MATERIAL PREPARATION
2.1 GENERAL:
MIX AND PREPARE COATING MATERIALS IN ACCORDANCE WITH THE
COATING MANUFACTURER'S PRINTED INSTRUCTIONS FOR THE
PARTICULAR MATERIAL AND COAT TO BE APPLIED. KEEP MATERIALS
WHICH ARE NOT IN ACTUAL USE IN CLOSED CONTAINERS.
COATING MATERIALS THAT HAVE BEEN MIXED WITH AN AUTOMATIC
SHAKER MUST BE ALLOWED TO STAND TO LET AIR BUBBLES ESCAPE,
THEN GIVEN A FINAL HAND MIXING BEFORE APPLICATION. STIR
MATERIALS SO AS TO PRODUCE A MIXTURE OF UNIFORM DENSITY.
STIR AT FREQUENT INTERVALS DURING APPLICATION TO PREVENT
SKINNING. DO NOT STIR FILM WHICH MAY FORM ON THE SURFACE OF
THE MATERIAL. REMOVE FILM AND STRAIN, IF NECESSARY.
2.2 THINNING
THINNING MUST BE DONE IN ACCORDANCE WITH COATING
MANUFACTURER'S PRINTED DIRECTIONS FOR THE PARTICULAR
MATERIAL AND COAT.
2.3 TINTING
PRIME AND INTERMEDIATE COATS OF PAINT MUST BE A SLIGHTLY
DIFFERENT TINT FROM THE FINISH COAT TO FACILITATE
IDENTIFICATION OF EACH COAT. TINTING MUST BE DONE BY THE
COATING MANUFACTURER AND CLEARLY IDENTIFIED AS TO COLOR
AND COAT.
3. APPLICATION OF COATING MATERIALS
3.1 GENERAL
DO NOT PERFORM EXTERIOR PAINTING IN DAMP OR RAINY WEATHER.
INTERIOR PAINTING MUST NOT BE ALLOWED UNTIL THE BUILDING IS
ENCLOSED AND HAS THOROUGHLY DRIED OUT. DO NOT ALLOW
PAINTING BELOW 60 DEGREES F AND ABOVE 95 DEGREES F. COATING
APPLICATION MUST BE IN ACCORDANCE WITH THE COATING
MANUFACTURER'S WRITTEN INSTRUCTIONS & RECOMMENDATIONS,
AND AS SPECIFIED.
APPLICATION OF COATINGS MUST BE DONE BY SKILLED APPLICATORS.
APPLY COATINGS TO CLEAN AND PROPERLY PREPARED SURFACES.
APPLY COATINGS CAREFULLY WITH CLEAN, HIGH-QUALITY
APPLICATION EQUIPMENT. ALLOW SUFFICIENT TIME BETWEEN COATS
TO ENSURE COMPLETE DRYING AND CURING. SURFACES MUST BE
SANDED AND DUSTED BETWEEN COATINGS, AS REQUIRED, TO
PRODUCE A SURFACE FREE OF VISIBLE DEFECTS. HIGH GLOSS
COATINGS AND CLEAR FINISHES MUST BE LIGHTLY SANDED BETWEEN
COATS TO ENSURE BOND OF FOLLOWING COATS.
APPLY COATS TO THE SURFACES IN AN EVEN FILM. DO NOT ACCEPT
CLOUDINESS, SPOTTING, HOLIDAYS, LAPS, APPLICATION MARKS, RUNS,
SAGS, AND OTHER SIMILAR SURFACE IMPERFECTIONS. REMOVE
DEFECTIVE COATING APPLICATIONS AND RECOAT AS DIRECTED.
COATING LINES SUCH AS WAINSCOTS MUST BE SHARP, TRUE, AND
WELL-DEFINED. TAPE MAY BE USED TO ESTABLISH COATING LINES,
PROVIDING TAPE IS REMOVED BEFORE RAGGING OR SAW-TOOTH
EDGES FORM.
SURFACES, INCLUDING EDGES, CORNERS, CREVICES, WELDS, AND
OTHER SIMILAR CHANGES IN SURFACE PLANE, MUST RECEIVE A
DRY-FILM THICKNESS NOT LESS THAN SPECIFIED.
3.2 RATE OF APPLICATIONS:
11 MILS PRIME COAT - MIX COMPONENTS TOGETHER. MIX ONLY
ENOUGH MATERIAL WHICH CAN BE APPLIED WITHIN 25 MINUTES. APPLY
AT THE RATE OF 200 SF PER GALLON. ALLOW COATING TO CURE 24
HOURS AT 75 DEGREES F AND 50% RELATIVE HUMIDITY.
16 MILS BASE COAT - MIX ALL COMPONENTS TOGETHER IN A MORTAR
MIXER. PLACE MIXED MATERIAL WITHIN 15 MINUTES. APPLY AT A RATE
OF 107 SF/GAL. POUR MIX MATERIAL INTO SCREEN BOX AND
SCREENED OVER DESIRED AREA. POWER TROWEL MATERIAL TO
COMPACT AND ACHIEVE FINISHED TEXTURE. ALLOW COATING TO CURE
6 HOURS AT 75 DEGREES F AND 50% RELATIVE HUMIDITY. REMOVE
HIGH SPOTS AND IMPERFECTIONS USING A TERRAZZO GRINDER.
VACUUM UP LOOSE MATERIAL AND DUST.
3 MILS URETHANE TOP COAT- SATIN URETHANE TOPCOAT: OPEN AND
MIX ONLY ENOUGH MATERIAL, WHICH CAN BE APPLIED IN A 2 HOUR
PERIOD. APPLY SATIN URETHANE TOPCOATING AT THE RATE OF 500 SF
PER GALLON. ALLOW COATING TO DRY 24 HOURS AT 75 DEGREES F.
AND 50% RELATIVE HUMIDITY.
3.2.1 BRUSH APPLICATION
BRUSHES MUST BE CLEAN AND THE PROPER SIZE AND TYPE FOR
HIGH-QUALITY APPLICATION OF THE SPECIFIED COATING MATERIALS.
SLOW-DRY COATINGS MUST BE BRUSHED OUT. QUICK-DRY COATINGS
MUST BE BRUSHED ONLY ENOUGH TO SPREAD OUT EVENLY.
3.2.2 ROLLER APPLICATION
ROLLER COVERS MUST BE CLEAN AND OF THE PROPER NAP LENGTH,
NAP TEXTURE, AND MATERIAL FOR HIGH-QUALITY APPLICATION OF THE
SPECIFIED COATING MATERIALS.
ROLLER APPLICATION MUST BE DONE CAREFULLY AND MUST BE
EQUIVALENT IN ALL RESPECTS TO THE SAME COATS APPLIED BY
HIGH-QUALITY BRUSH APPLICATION.
4. ACCEPTANCE PROVISIONS
4.1 REPAIRING
REMOVE DAMAGED AND UNACCEPTABLE PORTIONS OF COMPLETED
WORK AND REPLACE WITH NEW WORK TO MATCH ADJACENT
SURFACES AT NO ADDITIONAL COST TO THE GOVERNMENT.
4.2 CLEANING
AT END OF EACH WORKDAY, REMOVE RUBBISH, EMPTY CANS, RAGS,
AND OTHER DISCARDED MATERIALS FROM PROJECT SITE.
AFTER COMPLETING COATING APPLICATION, CLEAN SPATTERED
SURFACES. REMOVE SPATTERED COATINGS BY WASHING, SCRAPING,
OR OTHER METHODS. DO NOT SCRATCH OR DAMAGE ADJACENT
FINISHED SURFACES.
APPLICATION EQUIPMENT MUST BE CLEANED PROMPTLY AND
THOROUGHLY WITH A SUITABLE SOLVENT AFTER EACH USE AND
STORED IN A CLEAN, COVERED, WELL-VENTILATED CONTAINER.
PROTECT WORK OF OTHER TRADES AGAINST DAMAGE FROM COATING
OPERATION. CORRECT DAMAGE BY CLEANING, REPAIRING,
REPLACING, AND RECOATING, AS APPROVED BY ARCHITECT, AND
LEAVE IN AN UNDAMAGED CONDITION. AT COMPLETION OF
CONSTRUCTION ACTIVITIES OF OTHER TRADES, TOUCH UP AND
RESTORE DAMAGED OR DEFACED COATED SURFACES.
4.3 PROTECTION
CLOSE JOB SITE TO TRAFFIC FOR A PERIOD OF 24 HOURS AFTER
COATING APPLICATION AT 75 DEGREES F AND 50% RELATIVE HUMIDITY.
BUILDING 27 BOILER ROOM CONCRETE FLOOR FINISH SCHEDULE
SECTION
NO.
NAME
GROSS
AREA
REMOVE/STRIP EXISTING
FLOOR FINISH. CLEAN AND
PREPARE FOR
APPLICATION OF NEW
FINISH
APPLY ONE COAT OF
11 MILS EPOXY AS A
PRIMER
APPLY ONE COAT OF 16
MILS EPOXY AS A BASE
COAT
SCRUB THE BASE COAT,
THEN APPLY CLEAR
SATIN 3 MILS URETHANE
TOP COAT
REMARKS
10 BOILER ROOM 1618 SQ. FT.
GENERAL NOTES
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AFFECTING THE WORK. FLOOR RESURFACING SHALL
NOT START UNTIL BOILER ROOM MECHANICAL ROOM DEMOLITION IS COMPLETE. SEE SHEET MD-401 FOR BOILER ROOM
DEMOLITION PLAN.
2. EXISTING FURNISHINGS, CASEWORK, MATERIALS AND SUPPLIES WILL BE REMOVED AND/OR RELOCATED FROM THE
WORK AREAS BY DSCC PERSONNEL, COORDINATE WITH THE CONTRACTING OFFICER REPRESENTATIVE (COR).
3. UNLESS OTHERWISE APPROVED, THE CONTRACTOR SHALL SCHEDULE AND COMPLETE FLOOR STRIPPING, SURFACE
PREPARATION AND FINISHING OPERATIONS IN WORK PHASES, AS PER APPROVED WORK SCHEDULE. THIS WILL PERMIT
THE REMOVAL & RELOCATION OF SUPPLIES AND MATERIALS FROM THE WORK AREAS BY GOVERNMENT PERSONNEL
CONCRETE FLOOR TO BE
RESURFACED
LEGEND
AutoCAD SHX Text
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text 027N-E-017
L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S
C
C
C
C C
C C
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
C
T
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S
L P S
L P S L P S L P S
LPS
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S
C C C C C C C C C C C C C C C C C C C C C C C C C C C
C C
C C
C C
C C
C
C C C C
C
C C
C C
C
C C
C C
C
C C C C
C
C C
C C
C C
C C
C C
C C
C C
C C
C
C C
C C
C C
C
C
C C
C C
C
C
C
C C
C C
C C
C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
6"
6"
3"
3"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
6"
3"
6"
3"
6"
3"
6"
2" 3"
2-1/2"
1-1/4"
1"
2"
2-1/2"
2-1/2"
1-1/4"
3"
1-1/4"
6"
2"
6"
2"
3"
1-1/4"
3"
1-1/2"
8"
1-1/4"
1-1/4"
2-1/2"
3"
4"
1"
2"
1"
1-1/2"
1"
2"
1"
2"
C
W W W
G G
G
G G
G
L P S
L P S
L P S
L P S
L P S
L P S
F
G G G
G G
W W
W
B B
F F
F F
LPSLPSLPSLPS
L P S
L P S
LPS
CCCC
C
C
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
P L O
T
D
A T
E
D A
T E
D A
T E
D A
T E
D
A T
E
D A
T E
D A
T E
S C
A L E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D
M
S
A F
E T
Y
A P
P R
O V
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E N
C
Y
A p r
K E
I N
G L
E R
K E
I N
G L
E R
4-581
MD-101
H V
M
O L I T
I O
N
P
L A
N
S
E C
T I O
C S
C
B O
I L E
R
C
O N
V E
R S
I O
N S
B
U I L D
I N
G
SCALE: 1/16" = 1'-0"
BUILDING 27 - HVAC DEMOLTION PLAN - SECTIONS 7 - 10
CODED NOTES:
1. REMOVE EXISTING UNIT HEATER, STEAM SUPPLY PIPING, CONDENSATE RETURN PIPING, THERMOSTAT AND ALL
ASSOCIATED APPURTENANCES. CONTRACTOR TO COMPLETELY REMOVE ALL EXISTING ELECTRICAL CONNECTIONS
(CONDUIT, WIRE, SWITCHES, ETC..) FOR EXISTING UNIT HEATERS THAT ARE BEING REMOVED.
GENERAL NOTES: SHEETS MD-101 THRU MD-401
1. DEMO ALL STEAM SUPPLY PIPE, CONDENSATE
RETURN PIPE, BOILERS, CONDENSATE TANK AND
ALL ASSOCIATED HANGERS.
2. REMOVE ASBESTOS INSULATION IN ACCORDANCE
WITH THE PROJECT GUIDE SPECIFICATIONS
SECTION 02 82 16.00 20 ENGINEERING CONTROL OF
ASBESTOS CONTAINING MATERIALS. OHIO EPA
MUST BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
3. IF DURING DEMOLITION, INSULATION IS FOUND
WHICH IS SUSPECTED OF CONTAINING ASBESTOS
THAT IS NOT IDENTIFIED ON DRAWINGS,
CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
4. EXISTING PLANS ARE BASED ON AS-BUILT
DRAWINGS. PIPE SIZES, PIPE LOCATIONS, AND
EQUIPMENT ARE TAKEN FROM AS-BUILT DRAWINGS.
CONTRACTOR SHALL VERIFY THE ACTUAL SIZES
AND LOCATIONS OF EXISTING MECHANICAL
EQUIPMENT AND PIPING.
5. CONTRACTOR MUST COORDINATE WORK TO KEEP
HEATING SYSTEM IN OPERATION DURING THE
HEATING SEASON, TYPICALLY OCTOBER 1ST THRU
APRIL 1ST. IF SYSTEM MUST BE TAKEN OFFLINE
THEN IT SHALL BE THE CONTRACTORS
RESPONSIBILITY TO KEEP THE BUILDING
TEMPERED.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VH
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
VH
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
LOADING PLATFORM
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
SECTION 11 SECTION 13SECTION 12
T
C
C
C
TT
T
T
T
T
T
T
T
T
T
L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S L P S
L P S L P S L P S L P S
L P S
L P S
L P S
L P S
LPSLPSLPS
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
LPS
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S
L P S L P S L P S L P S
L P S
L P S
L P S
L P S
C C
C C
C
C C C
C
C C
C C
C C
C C C C C C C C C C C C C C C C C C C C C C C C
C C C
C C
C
C C
C C
C
C
C C
C C
C C
C C
C C
C
C C C C
C C
C
C
LPS
C
L P S L P S
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
1-1/2"
4"
1-1/4"
1-1/4"
5"
2-1/2"
1"
2"
1"
2"
1"
2"
1"
2"
1"
2"
6"
3"
1"
2"
1"
2"
2-1/2"
2-1/2"
2-1/2"
1-1/4"
2"
1-1/4"
3"
1"
2"
1"
1-1/2"
1"
2"
1"
C
W
F
W W
W
B B
F F
F
L P S
C
LP
C
AHU-1
AHU-2
AHU-3
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
P L
T
E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
S C
A L
E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D
M
S
A F
E T
Y
A P
P R
O V
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E
N
C
Y
A p r
K E
I N
G L
E R
K E
I N
G L
E R
4-581
MD-102
H V
M
O L
T I O
N
P
L A
N
S
E C
T I O
C S
C
B O
I L
N
V E
R S
I O
N S
B
U I L
D I N
G
CODED NOTES:
1. REMOVE EXISTING UNIT HEATER, STEAM SUPPLY PIPING, CONDENSATE RETURN PIPING, PIPE HANGERS, THERMOSTAT AND ALL ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING ELECTRICAL CONNECTIONS
(CONDUIT, WIRE, SWITCHES, ETC..) FOR HEATER.
2. REMOVE EXISTING AHU STEAM HEATING COIL. PREPARE AHU FOR INSTALLATION OF NEW COIL.
SCALE: 1/16" = 1'-0"
BUILDING 27 - HVAC DEMOLTION PLAN - SECTIONS 11 - 13
GENERAL NOTES: SHEETS MD-101 THRU MD-401
1. DEMO ALL STEAM SUPPLY PIPE, CONDENSATE RETURN PIPE,
BOILERS, CONDENSATE TANK AND ALL ASSOCIATED HANGERS.
2. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 16.00 20
ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS.
OHIO EPA MUST BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
3. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
4. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
5. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
TRANS.
AutoCAD SHX Text
TRUCK LOADING PLATFORM
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
VH
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
RACQUETBALL COURT
AutoCAD SHX Text
VH
AutoCAD SHX Text
SAUNA
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MEN
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REST ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TRACK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
BASKETBALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
OVERHEAD DOOR
W W W
G G
G
G G
G
L P S
F
G G G
G G
W W
W
B B
F F
F F
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
P L
T
E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
S C
A L
E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D
M
S
A F
E T
Y
A P
P R
O V
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E
N
C
Y
A p r
K E
I N
G L
E R
K E
I N
G L
E R
4-581
MD-401
H V
M
O L
I T
I O
N
B
O I L
O
M
C S
C
B O
I L
N
V E
R S
I O
N S
B
U I L
D I N
G
SCALE: 1/4" = 1'-0"
BUILDING 27 - DEMOLITION PLAN - BOILER ROOM
4"
1-1/2"
1-1/2"
3/4"
14" BOILER EXHAUST
STACK
2" MEDUIM
PRESSURE GAS
SERVICE
2" LOW PRESSURE
GAS SERVICE
GAS METER
FEEDWATER PUMPS
VENT
CODED NOTES:
1. REMOVE EXISTING BOILER, STEAM SUPPLY PIPING, PIPE HANGERS, FEEDWATER PIPING,
BLOWDOWN PIPING, NATURAL GAS PIPING, VENT PIPING, EXHAUST STACK, BOILER
CONTROLLERS AND ALL ASSOCIATED APPURTENANCES. PATCH OPENINGS IN BUILDING ROOF
AND BOILER ROOM CEILING AS RESULT OF VENT PIPING REMOVAL. REMOVE CONCRETE PAD
FOR BOILER. CONTRACTOR TO COMPLETELY REMOVE ALL EXISTING ELECTRICAL CONNECTS
BACK TO PANEL (CONDUIT, WIRE, SWITCHES, ETC.).
2. REMOVE EXISTING CONDENSATE RECEIVER TANK, ASSOCIATED FEEDWATER PUMPS, COLD
WATER PIPING, CONDENSATE RETURN PIPING, PIPE HANGERS AND ALL ASSOCIATED
APPURTENANCES. REMOVE CONCRETE PAD FOR CONDENSATE RECEIVER. CONTRACTOR TO
COMPLETELY REMOVE ALL EXISTING ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT, WIRE,
SWITCHES, ETC.).
3. REMOVE EXISTING CHEMICAL SHOT FEEDER, ASSOCIATED PIPING AND HANGERS. REMOVE
CONCRETE PAD FOR UNIT.
4. REMOVE EXISTING BLOWDOWN TANK, BLOWDOWN PIPING, VENT PIPING AND PIPE HANGERS.
PATCH OPENINGS IN BUILDING ROOF AND BOILER ROOM CEILING AS RESULT OF VENT PIPING
REMOVAL..
5. REMOVE EXISTING WATER SOFTENER, COLD WATER PIPING AND HANGERS. REMOVE CONCRETE
PAD FOR UNIT.
6. REMOVE EXISTING THRU THE WALL EXHAUST FAN , ASSOCAITED THERMOSTAT AND ELECTRICAL
CONNECTS BACK TO PANEL (CONDUIT, WIRE, SWITCHES, ETC.). PATCH HOLE IN WALL TO MATCH
EXISTING CMU WALL..
7. REMOVE EXISTING CONTROL PANELS AND ASSOCIATED CONDUIT. REPAIR ANY WALL DAMAGE
AS RESULTE OF REMOVAL
VENT
VENT
GENERAL NOTES: SHEETS MD-101 THRU MD-401
1. DEMO ALL STEAM SUPPLY PIPE, CONDENSATE RETURN PIPE,
BOILERS, CONDENSATE TANK AND ALL ASSOCIATED HANGERS.
2. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 16.00 20
ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS.
OHIO EPA MUST BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
3. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
4. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
5. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
6 11
GAS FIRED UNIT
HEATER TO REMAIN
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text 027N-E-017
SECTION 7 SECTION 8 SECTION 9
SECTION 10
H W S H W S H W S H W S
H W S
H W R H W R H W R
H W R
H W R
H W S
H W R
H W R
H W R
UH-1UH-1UH-1UH-1UH-1UH-1UH-1 UH-1
UH-1
UH-1
UH-1 UH-1 UH-1 UH-1 UH-1 UH-1 UH-1 UH-1 UH-1 UH-1
CH-1 CH-1
UH-1
UH-1
T
HWRHWRHWRHWRHWRHWRHWRHWRHWR
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R
H W R
H W R H W R H W R H W R
H W S
H W S
H W S
1"
4"
4"
4"
4"
4" 4" 4"
4"
1-1/2"
4"
3"3"2-1/2" 3"
2-1/2"
2-1/2" 2-1/2" 2-1/2" 2"
1-1/2"
H W R
H W R
H W R
1-1/2"
1"
1"
1"
HWSHWSHWS
H W S
HWSHWSHWSHWS
H W S
HWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWS
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S
HWS
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W R H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W S
H W S
H W S
H W S
HWSHWSHWS
H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W
1"
1"
1"
1"
1" 1" 1"1" 1" 1" 1" 1" 1"
1" 1"
1" 1"
1" 1"
1" 1"
1" 1"
1" 1"
1" 1"
1" 1"
1"
1" 1"
1"
1" 1" 1" 1" 1" 1" 1" 1"
T T T
T T
T T T
T T T
T
T T
T
T
T T
T
T
T
G G
G G
G G
G G
G G
G G
G G G G G G G G
CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
W
W W W W
W W W
T
T
AAA
A
A A A A
A
5' x 2.5' x 5' EXPANSION LOOP4' x 2' x 4' EXPANSION LOOP5' x 2.5' x 5' EXPANSION LOOP4' x 2' x 4' EXPANSION LOOP
5' x 2.5' x 5' EXPANSION LOOP
4' x 2' x 4' EXPANSION LOOP
5' x 2.5' x 5' EXPANSION LOOP 5' x 2.5' x 5' EXPANSION LOOP
5' x 2.5' x 5' EXPANSION LOOP 5' x 2.5' x 5' EXPANSION LOOP
5' x 2.5' x 5' EXPANSION LOOP5' x 2.5' x 5' EXPANSION LOOP
A
PIPE ANCHOR(TYP)
W W
CH-2
1-1/2"
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
N
M
A N
A G
E M
E N
T
D
I V
I S
I O
N
D A
T E
P R
O J E
P L
T
E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
S C
A L
E
M A
R K
D E
F E
N S
E
L
O G
I S
T I C
S
A
G E
N C
Y
D E
F E
N S
E
S
U P
P L
Y
C
E N
T E
R
C
O L
U M
B U
S
C O
L U
M B
U S
O
H
SHEET
REFERENCE
NUMBER:
C U
S T
O M
E R
D M
F
N V
I R
O N
M E
N T
A L
D R
A W
N
B
Y
R E
V I E
W E
D
B
Y
F A
C I L I T
Y
E
N G
I N
E E
R
D
M
S
A F
E T
Y
A P
P R
O V
D M
F
E C
U R
I T
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
R E
V I E
W E
D
B
Y
D E
P U
C
I L I T
Y
E
N G
I N
E E
R
DLA INSTALLATION MANAGEMENT
D
E
F
E
N
S
E
L
O
G
I
S
T
I
C
S
A
G
E
N
C
Y
A p r
K E
I N
G L
E R
K E
I N
G L
E R
4-581
M-101
H V
R
K
P
L A
N
S
E C
T I O
C S
C
B O
I L
N
V E
R S
I O
N S
B
U I L
D I N
G
SCALE: 1/16" = 1'-0"
BUILDING 27 - HVAC NEW WORK PLAN - SECTIONS 7 - 10
CODED NOTES:
1. INSTALL NEW VERTICAL UNIT HEATER, HOT WATER SUPPLY/RETURN PIPING, CONTROL VALVES, THERMOSTAT
AND PIPING SPECIALTIES AS SHOWN ON DETAILS SHEET M-502. INSTALL UNIT IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. UNIT TO BE INSTALLED 16 FEET AFF. UNIT HEATER SCHEDULE IS ON
SHEET M- 601.
2. INSTALL NEW CABINET UNIT HEATER, HOT WATER SUPPLY/RETURN PIPING, CONTROL VALVES, THERMOSTAT
AND PIPING SPECIALTIES AS SHOWN ON DETAILS SHEET M-502. INSTALL UNIT IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. UNIT HEATER SCHEDULE SHOWN ON SHEET M-601.
1 1 1 1 1 1 1 1 1
1111111
GENERAL NOTES: M-101 THRU M-401
1. HOT WATER SUPPLY/RETURN (HWS/HWR) PIPING SHALL BE
ASTM A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL,
SEAMLESS. WHERE PIPE NEEDS REDUCED USE
ECCENTRIC REDUCERS.
2. INSULATE NEW HWS/HWR PIPE WITH 2" MINERAL FIBER
WITH ALL SERVICE JACKET. INSTALL PIPING AT A MINIMUM
13 FEET AFF.
3. NEW GAS PIPING SHALL BE STEEL PIPE CONFORMING TO
ASME B36.10M; AND MALLEABLE-IRON THREADED FITTINGS
CONFORMING TO ASME B16.1 AND ASME B16.3.
4. PROVIDE NEW MANUFACTURERS STANDARDIZATION
SOCIETY OF VALVES AND FITTINGS (MSS) TYPE 43
HANGERS WITH TYPE 40 PROTECTIVE SHIELD PIPING.
SPACE HANGERS PER MSS 58 GUIDELINES.
5. WATER DISTRIBUTION SYSTEM SHALL BE BALANCED IN
ACCORDANCE WITH SECTION 23 05 93.00 06 TESTING,
ADJUSTING AND BALANCING FOR HVAC OF THE PROJECT
SPECIFICATIONS.
6. PIPING AND HEATER LOCATIONS ARE SCHEMATIC IN
NATURE. PIPING, UNIT HEATERS AND BOILERS SHOWN ARE
PROVIDED TO SHOW SUFFICIENT DETAIL FOR BIDDING AND
EXECUTION. ACTUAL INSTALLATION IN FIELD MAY BE
REVISED (WITH GOVERNMENT APPROVAL) TO EASE
INSTALLATION.
7. PROVIDE PIPE SLEEVES WHERE PIPES PASS THROUGH
MASONRY OR CONCRETE WALLS. SLEEVES SHALL BE OF
SUFFICIENT LENGTH TO PASS THROUGH ENTIRE
THICKNESS OF WALLS. SEAL ALL PENETRATIONS TO 3 HR
FIRE RATING.
AutoCAD SHX Text 027N-E-013
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 027-I-900
AutoCAD SHX Text 027-I-900A
AutoCAD SHX Text 027-I-1000
AutoCAD SHX Text 027-I-1000A
AutoCAD SHX Text 027S-E-047
AutoCAD SHX Text 027S-E-046
AutoCAD SHX Text
PROPOSED FOR SPRING 2016
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VH
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
VH
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
LOADING PLATFORM
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text
%%USTORAGE CAGE
AutoCAD SHX Text 027N-E-019
AutoCAD SHX Text 027N-E-017
AutoCAD SHX Text
SECTION 11 SECTION 13SECTION 12
W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S H W S H W S H W S H W S H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W R
H W R
H W S
H W S
H W R
H W R
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W S
H W S
H W S
H W S
H W R
H W S H W S H W S
H W R H W R H W R
H W S
H W S
H W S
H W S
H W R
H W R
H W R
H W R
H W S
H W S
H W S
H W S
H W S
HWR
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W S
H W S
H W R
H W R
H W R
H W S
H W S
UH-1 UH-1
UH-1
UH-1 UH-1 UH-1 UH-1 UH-1 UH-1 UH-1 UH-1 UH-1
UH-1
UH-1
CH-2
H W S
H W R
H W S
UH-2
UH-2
AC-1
AHU-1
AHU-2
AHU-3
HWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWS
H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S
H W S
H W S
H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S H W S H W S H W S H W S H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
HWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWS
H W S
H W S
H W S
H W S
H W S
H W S
H W S
HWSHWSHWSHWS
4"
4" 3" 3"
4"
3"
3"
3"
3"
2-1/2"
1-1/2"
1-1/2"
4"
4"
4"
4"
4"
4"
3"
3"3"
3"
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R H W R H W R H W R H W R H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
HWRHWR
H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S
HWSHWSHWS
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S
H W S H W S
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R
H W S
H W S
H W S
H W S
HWS
H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R
H W R
H W R
H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R H W R H W R H W R H W R H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
H W R
HWRHWR
1" 1"
1" 1"
1" 1"
1" 1"
1" 1"
1" 1" 1"
1" 1" 1" 1"
1" 1" 1"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2" 1-1/2"
4"
4"
1"1"1" 1"
1" 1" 1"
1"
1"
2-1/2"2-1/2"
2-1/2"
2-1/2"
3" 3"
1"
1"
1"
1"
1-1/2" 1-1/2"
1"
T
T T
T
T T T T T
T
T
T
T
T
T
T
T
T
G G
HWR
W
W W
W
T
T
A A A
A A
A
A
A
A
A
5' x 2.5' x 5' EXPANSION LOOP
5' x 2.5' x 5' EXPANSION LOOP
7' x 3.5' x 7' EXPANSION LOOP7' x 3.5' x 7' EXPANSION LOOP
5' x 2.5' x 5' EXPANSION LOOP4' x 2' x 4' EXPANSION LOOP5' x 2.5' x 5' EXPANSION LOOP
4' x 2' x 4' EXPANSION LOOP
PIPE ANCHOR(TYP)
H W S
1-1/2" 1-1/2"
CH-2
1-1/2"
T
H W R
H W R
H W R
H W S
H W S
UH-1
1" 1"
T
UH-1
1" 1"
T
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F A
C I L
I T
I E
S
E
N G
I N
E E
R I N
G
O
F F
I C
E
B U
I L
D I N
G
I N
S T
A L
L A
T I O
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .