Attachment 11 - Submittal Register.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- CSC-20019; DSCC BLDG 27 Boiler Conversion Federal contract opportunity
- Solicitation number
- SP4702-21-R-0018
- Issued by
- Defense Logistics Agency
About this file
This submittal register attachment provides details on the required submissions for a federal construction contract to perform boiler system conversion work at a Defense Supply Center building in Columbus, Ohio. The contractor must remove an existing steam boiler system, complete all demolition and repair work, and install a new hot water boiler system. Key submittals include schedules of values, a submittal register, safety plans, operation and maintenance manuals, training documentation, waste management documentation, product data and design mixes for masonry and concrete work, and test reports. Submissions are due at various stages prior to and after completion of the construction work. The solicitation provides additional requirements for the boiler conversion project including a mandatory site visit, questions due by a specified date, and details on the required proposal contents for consideration for the firm fixed price award which is valued between $1 million and $5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_SP470221R00180001.pdf | ||
| FinalBldg27ACMUpdate.pdf | ||
| Updated Attachment 10 - Bid Form.pdf | ||
| Attachment 12 - Drawings 4-582.pdf | ||
| Updated Solicitation SP4702-21-R-0018.pdf | ||
| Updated Attachment 2 - SOW and Complete Specs.pdf | ||
| RFIs for SP4702-21-R-0018.pdf | ||
| Final Bldg 27 ACM Survey.pdf | ||
| Solicitation SP4702-21-R-0018.pdf | ||
| Attachment 1 - Clauses and Evaluation Criteria.pdf | ||
| Attachment 3 - Drawing Package.pdf | ||
| Attachment 5 - Wage Rate Determination OH20210078.pdf | ||
| Attachment 10 - Bid Form.pdf | ||
| Attachment 2 - SOW and Complete Specs.pdf | ||
| Attachment 6 - ENG Form 93.pdf | ||
| Attachment 8 - ENG Form 4025-R.pdf | ||
| Attachment 9 - Contractor Access Badge Request Form.xlsx | XLSX spreadsheet | |
| Attachment 4 - CAC Procedures.pdf | ||
| Attachment 7 - DSCC Excavation Permit.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| Attachment 11 | SP4702-21-R-0018 | |||||
| SUBMITTAL REGISTER | ||||||
| TITLE: | CSC-20019 | SUBMITTAL REGISTER | ||||
| JOB NAME: | BLDG 27 Boiler Conversion | |||||
| LOCATION: | DSCC, Columbus, Ohio | |||||
| CONTRACT NO: | ||||||
| CONTRACTOR: | ||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY |
| Line | Activity # | Trans-mittal # | Specification Section | SD # | SD Description | Item Submitted | Paragraph # | Classi-fication: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth - Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 20 00.00 20 | 01 | Preconstruction Submittals | Schedules of Values | 1.2 | G | ||||||||||||||
| 2 | NOT USED | NOT USED | NOT USED | |||||||||||||||||
| 3 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.10 | G | ||||||||||||||
| 4 | 01 35 31 | 01 | Preconstruction Submittals | VPP Awareness | 2.1.1 | G | ||||||||||||||
| 5 | 01 35 31 | 01 | Preconstruction Submittals | Contractor Safety/Environmental Management Systems Informational Data Sheet | 2.1.2 | G | ||||||||||||||
| 6 | 01 35 31 | 01 | Preconstruction Submittals | OSHA Form 300A | 2.1.2.1 | G | ||||||||||||||
| 7 | 01 35 31 | 01 | Preconstruction Submittals | Safety Plan | 2.1.3 | G | ||||||||||||||
| 8 | 01 35 31 | 03 | Product Data | Hazardous Material Safety Data Sheets | 2.1.16 | G | ||||||||||||||
| 9 | 01 45 00. 10 20 | 01 | Preconstruction Submittals | QC PLAN | 1.3 | G | ||||||||||||||
| 10 | 01 78 00 | 10 | O & M Data | O & M Manuals | 1.4 | G | ||||||||||||||
| 11 | 01 78 00 | 11 | Closeout Submittals | As Built Record Drawings | 1.4 | G | ||||||||||||||
| 12 | 01 78 23 | 10 | O & M Data | O & M Manuals & Training Plan | 1.2 | G | ||||||||||||||
| 13 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 1.2 | G | ||||||||||||||
| 14 | 02 41 00 | 11 | Closeout Submittals | As Built Record Drawings | 1.4 | G | ||||||||||||||
| 15 | 02 41 00 | 07 | Certificates | Demolition & Deconstruction Plans | 1.3 | G | ||||||||||||||
| 16 | 03 01 30.71 | 05 | Design Data | Concrete mix design | 1.3 | G | ||||||||||||||
| 17 | 03 01 30.71 | 06 | Test Reports | Sieve Analysis test for aggregate | 1.3 | G | ||||||||||||||
| 18 | 03 01 30.71 | 06 | Test Reports | Epoxy Resin binder tests | 1.3 | G | ||||||||||||||
| 19 | 03 01 30.71 | 06 | Test Reports | Epoxy Grout Tests | 1.3 | G | ||||||||||||||
| 20 | 03 01 30.71 | 07 | Certificates | Epoxy resin binder and Grout | 1.3 | G | ||||||||||||||
| 21 | 07 92 00 | 03 | Product Data | Joint sealant | 1.2 | G | ||||||||||||||
| 22 | 07 92 00 | 03 | Product Data | Primers | 1.2 | G | ||||||||||||||
| 23 | 07 92 00 | 03 | Product Data | Bond Breakers | 1.2 | G | ||||||||||||||
| 24 | 07 92 00 | 03 | Product Data | Backstops | 1.2 | G | ||||||||||||||
| 25 | 09 96 56.30 | 03 | Product Data | Breathable Penetrating Seal Coating Systems | 1.5 | G | ||||||||||||||
| 26 | 09 96 56.30 | 04 | Samples | Breathable Penetrating Seal Coating Color Charts | 1.5 | G | ||||||||||||||
| 27 | 09 96 56.30 | 07 | Certificates | Breathable Penetrating Seal Coating Systems are suitable for intended application | 1.5 | G | ||||||||||||||
| 28 | 09 96 56.30 | 08 | Manufacturer's Instructions | Breathable Penetrating Seal Coating Systems Cleaning & maintenance Instructions | 1.5 | G | ||||||||||||||
| 29 | 09 96 56.30 | 11 | Closeout Submittals | Breathable Penetrating Seal Coating Systems warranty document & As-built drawings | 1.5 | G | ||||||||||||||
| 30 | 01 57 19 | 01 | Preconstruction Submittals | Solid Waste Management Permit, Regulatory Notifications, Environmental Protection Plan, Employee Training Records, and Environmental Manager Qualifications | 1.3 | G | ||||||||||||||
| 31 | 01 57 19 | 06 | Test Reports | Solid Waste Management Report | 1.3 | G | ||||||||||||||
| 32 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Permit & Report, Storm water Pollution Prevention Plan Compliance Notebook, Waste determination Documentation, Disposal Documentations for hazardous waste, hazardous materials inventory log, and Regulatory notifications | 1.3 | G | ||||||||||||||
| 33 | 01 74 19 | 01 | Preconstruction Submittals | Waste Management Plan | 1.4 | G | ||||||||||||||
| 34 | 03 30 00 | 03 | Product Data | Joint Sealer & Joint Filler | 1.3 | G | ||||||||||||||
| 35 | 03 30 00 | 05 | Design Data | Concrete mix design | 1.3 | G | ||||||||||||||
| 36 | 03 30 00 | 06 | Test Reports | Concrete Test Report | 1.3 | G | ||||||||||||||
| 37 | 04 20 00 | 02 | Shop Drawings | Masonry | 1.3 | G | ||||||||||||||
| 38 | 04 20 00 | 03 | Product Data | Masonry Mortar | 1.3 | G | ||||||||||||||
| 39 | 04 20 00 | 05 | Design Data | Masonry Design | 1.3 | G | ||||||||||||||
| 40 | 04 20 00 | 06 | Test Reports | Masonry Mortar Test Report | 1.3 | G | ||||||||||||||
| 41 | 32 11 23 | 03 | Product Data | Pavement Base Course | 1.5 | G | ||||||||||||||
| 42 | 32 11 23 | 06 | Test Reports | Pavement Base Course | 1.5 | G |