Attachment 10 - Bid Form.pdf

PDF 591 KB Posted

Attached to
CSC-20019; DSCC BLDG 27 Boiler Conversion Federal contract opportunity
Solicitation number
SP4702-21-R-0018
Issued by
Defense Logistics Agency

About this file

This solicitation is for a full conversion of the boiler system in Building 27 located at the Defense Supply Center in Columbus, Ohio. The existing steam boiler system will be removed and a new hot water boiler system installed. The magnitude of construction is estimated between $1 million to $5 million. This is a 100% small business set aside contract to be awarded as firm fixed price. Proposals are due by July 13, 2021. The mandatory site visit will take place on June 30, 2021. Questions are due by July 6, 2021 with answers posted thereafter. The period of performance is 540 calendar days from notice to proceed. The Defense Logistics Agency is the contracting agency. Responses must include forms SF1442, the bid form, bid bond, past performance information, and a contract management plan.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT CSC-20019 1 OF 1

LOCATION OFFEROR NAME

No. / Div.

QTY. Unit

1 1 LS -$

2 1 LS -$

3 1 LS -$

4 1 LS -$

5 1 LS -$

6 1 LS -$

7 1 LS -$

8 1 LS -$

9 1 LS -$

10 1 LS -$

11 1 LS -$

12 1 LS -$

13 1 LS -$

14 1 LS -$

21 1 LS -$

22 1 LS -$

23 1 LS -$

26 1 LS -$

27 1 LS -$

28 1 LS -$

31 1 LS -$

32 1 LS -$

33 1 LS -$

34 1 LS -$

-$ TOTAL COST

OVERHEAD

PROFIT

BOND

SUB-TOTAL COST

Electronic Safety and Security

Earthwork

Exterior Improvements

Utilities

Transportation

Communications

Openings

Finishes

Specialties

Equipment

Furnishings

Special Construction

Conveying Equipment

Fire Suppression

Plumbing

Heating, Ventilating, and Air Conditioning

Electrical

Thermal and Moisture Protection

BID ITEM

SUB CONTRACT

COST

PRIME

CONTRACT

COST

TOTAL DIRECT

COSTDescription

General Requirements

Existing Conditions

Concrete

Masonry

Metals

Wood, Plastics, and Composites

BLDG. 27

CONTRACTOR BID FORM

SHEET

DATE PREPAREDBOILER CONVERSIONS, BUILDING 27

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

Attachment 10 SP4702-21-R-0018 Page 1 of 1

File details come from the government source that posted it. Updated .