Att 8 TE 5.0 APLs Conformed 0005.docx

DOCX document 57 KB Posted

Attached to
Distribution and Warehousing Services at DLA Distribution Cherry Point, NC Federal contract opportunity
Solicitation number
SP3300-24-R-5003
Issued by
Defense Logistics Agency Distribution

About this file

This document is Technical Exhibit 5.0: Acceptable Performance Levels (APLs) associated with the federal contract opportunity for Distribution and Warehousing Services at DLA Distribution Cherry Point, NC (Solicitation Number SP3300-24-R-5003).

The APLs define the acceptable performance standards and associated impacts for various deliverables and service areas outlined in the Performance Work Statement. The APLs cover timeliness of receiving and putaway activities, issue quality metrics like ISDR and RSDR rates, inventory accuracy, and high-dollar value adjustment reduction. Performance standards are categorized as Priority 1, 2, or 3 based on the impact to the agency's mission requirements. The document provides detailed measurement criteria and thresholds for each performance area. It also notes the measurement tools and reporting mechanisms that will be used to track and assess contractor performance.

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehousing Services at DLA Distribution Cherry Point, NC, newest first.
File Type Posted
Amendment 0011 SF30 SP330024R5003.pdf PDF
Att 2 - Solicitation Conformed 8-21-24.pdf PDF
Att 1 - Solicitation Tracked 0010 8-21-24.docx DOCX document
Amendment 0010 SF30 SP330024R5003 8-21-24.pdf PDF
0008 Att 1 Schedule.pdf PDF
Att 3 0007 Applicable DSS Roles.pptx PPTX presentation
Att 1 0007 SAP WMS Role Request and Log-on Job Aid.pdf PDF
Att 2 0007 TE 2.1.1 WMS to DSS Crosswalk.pdf PDF
Amendment 0006 SF30 SP330024R5003.pdf PDF
Att 6 TE 5.2 Projected Workload 0005.xlsx XLSX spreadsheet
Att 5 - J.1 PWS Conformed 0005.docx DOCX document
Att 3 - Solicitation Conformed 0005.pdf PDF
Amendment 0005 SF30 SP330024R5003.pdf PDF
Att 2 - Solicitation tracked 0005.docx DOCX document
Att 7 TE 5.0 APLs Tracked 0005.docx DOCX document
Att 4 - J.1 PWS Tracked 0005.docx DOCX document
Att 1 - Questions and Answers 0005.docx DOCX document
Att 10 - Solicitation conformed.pdf PDF
Att 5 - TE 5.0 APLs conformed.docx DOCX document
Att 3 - J.1 PWS conformed.docx DOCX document
Att 1 - Questions and Answers.docx DOCX document
Att 11 - DDCN SSMR Dec 2023.xlsx XLSX spreadsheet
Att 9 - Solicitation tracked changes.docx DOCX document
Att 8 - DLA DD254 Cont Page.docx DOCX document
Att 2 - J.1 PWS tracked change.docx DOCX document
Att 7 - TE 5.2 Projected Workload.xlsx XLSX spreadsheet
Att 6 - TE 5.1 Historical Workload.docx DOCX document
Amendment 0003 SF30 SP330024R5003.pdf PDF
Amendment 0002 SF30 SP330024R5003.pdf PDF
Att 1 Conformed Solicitation 0002.pdf PDF
DDCN PPC Attendance 23 Aug 2024 (Day 1).pdf PDF
DDCN PPC Slide Deck_Final 4-23-2024 JCD Rev 1.pptx PPTX presentation
Att 3 J.13 DDCN Preproposal Conference Instructions.pdf PDF
Amendment 0001 SF30 SP330024R5003.pdf PDF
Att 2 Conformed Solicitation 0001.pdf PDF
Att 1 Section M - Tracked Changes 0001.pdf PDF
J.12 Contractor Equipment List 24R5003.xlsx XLSX spreadsheet
J.10 Accounting System Self-Certification.pdf PDF
J.6 CLIN X006 Labor Rate Table.xlsx XLSX spreadsheet
J.3 WD 2015-5781 Rev 22.pdf PDF
J.2 DDCN 24R5003.docx DOCX document
J.9 CDRLs.zip ZIP file
SP3300-24-R-5003 DDCN RFP.pdf PDF
J.5 DD254 DDCN SP330024R5003.pdf PDF
J.4 DDCN CBA.pdf PDF
J.11 Limitation on Subcontracting.xlsx XLSX spreadsheet
J.8 PPQ.docx DOCX document
J.7 Tech Exhibits.zip ZIP file
J.5 DLA DD254 Continuation Page Template_SP3300-24-R-5003.docx DOCX document
J.1 DDCN PWS 24R5003.docx DOCX document
Show all 50

Distribution and Warehousing Services at DLA Distribution Cherry Point, NC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-24-R-5003

TECHNICAL EXHIBIT 5.0

ACCEPTABLE PERFORMANCE LEVELS (APLS)

The following table identifies the Acceptable Performance Levels (APL) and their Impact for the Deliverables and/or Service area(s) identified in the Performance Work Statement (PWS).

“PRI 1” Impact - performance fails to meet vital agency mission requirements

“PRI 2” Impact – performance fails to meet significant agency requirements.

“PRI 3” Impact – performance fails to meet agency requirements.

Multiple or repetitive PRI 3 Impacts during the performance period could result in a PRI 3 Impact elevating to “PRI 2” or “PRI 1”.

SP3300-23-R-5005

TECHNICAL EXHIBIT 5.0

ACCEPTABLE PERFORMANCE LEVELS (APLS)

5.2 RECEIVING

TIMELINESS

ACTIVITY
STANDARD
APL
Impact
MEASUREMENT UNIVERSE
New Procurement - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
< 24 average business hours, excludes weekends and holidays
PRI 2
New Procurement lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
New Procurement - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 3 calendar days or less
≤ 3 average calendar days
PRI 2
New Procurement lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Customer Returns - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
≤ 24 average business hours, excludes weekends and holidays
PRI 3
Customer Return lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Customer Returns - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 8 calendar days or less
< 8 average calendar days
PRI 3
Customer Return lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
MILSVC Redistributions - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
≤ 24 average business hours, excludes weekends and holidays

PRI 3

Redistribution Order (RDO) lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)

MILSVC Redistributions - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 5 calendar days or less
≤ 5 average calendar days
PRI 3
Redistribution Order (RDO) lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Stock Transfer Order (STO) - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
≤ 24 average business hours, excludes weekends and holidays
PRI 3
Stock Transfer Order (STO) lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Stock Transfer Orders (STO) - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 5 calendar days or less
≤ 5 average calendar days
PRI 3
Stock Transfer Order (STO) lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Maintenance Turn-Ins - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
≤ 24 average business hours, excludes weekends and holidays
PRI 3
Maintenance Turn-in lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Maintenance Turn-Ins - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 3 calendar days or less
≤ 3 average calendar days
PRI 3
Maintenance Turn-in lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Re-warehousing Stow
Re-warehousing pick complete to stow in 3 business days or less
< 3 average business days; weekends and holidays excluded.
PRI 3
Re-warehousing stows completed per month (Tracked in Distribution Dashboard, Qlik application, and/or other J3 provisioned tool.)
Putaway Processing, Aged Work in Process (WIP)
Putaways should be completed to standard for each workload category
No open putaway older than 30 calendar days
PRI 3
Total open putaways as of month end, inclusive of all workload categories and re-warehousing. (Tracked via EWM Warehouse Monitor, in Sharepoint, Qlik application, and/or other HQ provisioned tool.)

NOTE: For APL calculations based on business hours the time accrued doing the work between the hours of 0000-2359 Mon thru Fri is included in the calculation. For example, if the tailgate date and time was Thursday at 1400 and the induct was Friday at 1400 then the business hour time is 24:00. If, however, the induct was the following Monday at 1400, then the business hour time would be 48:00 (because 0000 thru 2359 Sat and Sun) were excluded. Holidays are also excluded from the business hours calculation.

5.3.8 ISSUE

QUALITY

ACTIVITY
STANDARD
APL
IMPACT
MEASUREMENT UNIVERSE
iSDR Rate
Material shipped is the correct item, quantity, and CC and shipped to the right customer
> 99.75%

Monthly ISDR Report

PRI 3
Valid complaints per month as a % of total issues
RSDR Rate
Less than 1% of total STOs with a valid RSDR
< 1%
PRI 3
Number of Validated RSDRs divided by number of total STOs monthly. (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Requisition Alert - Wholesale Re-warehousing Pick created to Delivery to Retail % On Time
Wholesale Pick to delivery to Retail ≤ 5 business days
≥ 90% on time
PRI 3
Wholesale Pick to delivery to Retail ≤ 5 business days
High Priority MROs, Wholesale, excluding Scheduled Trucks
MRO Create to Transportation Departure in 1 calendar day or less
<1 average calendar day excluding weekends and federal holidays
PRI 1
High priority lines issued per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
Routine Priority MROs, Wholesale, excluding Scheduled Trucks
MRO Create to Transportation Departure in 3 calendar days or less
≤ 3 average calendar days excluding weekends and federal holidays
PRI 3
Routine priority lines issued per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
Routine Priority STOs, Wholesale, excluding Scheduled Trucks
MRO Create to Transportation Departure in 5 calendar days or less
≤ 5 average calendar days excluding weekends and federal holidays
PRI 3
Routine priority STO lines issued per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
Routine Priority MILSVC RDOs, Wholesale, excluding ScheduledTrucks
MRO Create to Transportation Departure in 3 calendar days or less
< 3 average calendar days excluding weekends and federal holidays
PRI 3
Routine priority MILSVC RDO lines issued per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
DROs, excluding HAZMAT and Radioactive Material (RAM)
DRO Create to Transportation Departure in 21 calendar days or less
< 21 average calendar days excluding weekends and federal holidays
PRI 3
DRO lines issued per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
FMS High Priority MROs
MRO Create to Transportation Departure (or to date of first notice, if NOA) in 3 calendar days or less
≤ 3 average calendar days excluding weekends and federal holidays
PRI 2
FMS High Priority MRO lines (as defined by DLA Distribution, currently RDD ‘777’, RDD ‘E_’, RDD ‘N_’, Project Code ‘9G_’, and CASREP (11th position of document number is ‘G’ or ‘W’)) received per month. (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
FMS Routine Priority MROs
MRO Create to Transportation Departure (or to date of first notice, if NOA) in 10 calendar days or less
≤ 10 average calendar days excluding weekends and federal holidays
PRI 3
FMS Routine Priority MRO lines, i.e. FMS lines not categorized as High Priority, received per month. (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
MRO Processing, Aged Bank (awaiting wave release) and Work in Process (WIP)
Shipments should be completed to standard for each workload category
No more than 5% of total MROs/DROs in Bank and in WIP (combined) older than 30 calendar days. (Note: FMS is the exception and will be deemed “aged” if over 60 days.)
PRI 3
Total MROs awaiting wave release and WIP. (Tracked via EWM Warehouse Monitor, in Sharepoint, Qlik application, and/or other HQ provisioned tool; excludes HAZ and RAD DROs.)

*NOTES:

1. The APL clock starts when the MRO/DRO transactions free flow from DAASC into WMS.

5.3.3 COSIS

QUALITY and TIMELINESS

ACTIVITY
STANDARD
APL
IMPACT
MEASUREMENT

UNIVERSE

Oldest COSIS Action
Any COSIS action aged for greater than 90 days
< 90 Days
PRI 2
Zero COSIS actions aged greater than 90 days.Data is pulled and measured monthly against all open and completed COSIS actions for the month. (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool and WMS ZCOSISDASH.)
COSIS Aged Rate
No more than 5% of all actions aged beyond COSIS timeframes
< 5% aged cosis actions
PRI 2
No more that 5% of all COSIS actions shall be aged beyond COSIS timeframes identified in PWS section C 5.3.3. (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool and WMS ZCOSISDASH.)

5.4 PHYSICAL INVENTORY CONTROL STANDARDS – INVENTORY APLS APPLY TO WHOLESALE AND RETAIL PROCESSING INCLUDED IN THE CONTRACTORS PERFORMANCE REQUIREMENTS

QUALITY and TIMELINESS

ACTIVITY
STANDARD
APL
IMPACT
MEASUREMENT

UNIVERSE

Denial Rate

The right quantity, condition code, and item is located to fill the MRO
≤ 0.40%
PRI 2
Total Denials with Management Codes 1, 2, 4, or 5 divided by the sum of Total MROs Shipped and Full Denials with Management Codes 1, 2, 4, or 5 (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Monthly Completion towards annual inventory plan.
Physical Inventory Counts completed IAW approved Government monthly inventory plan
≥ 95% of Scheduled 100% Adherence and Completion Rate
PRI 1
NIINs scheduled during the month. All Inventory Counts completed within the month against the Inventory plan (Oct – Aug)
Radiological
Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
100% Accuracy
PRI 1
All items counted at time of annually scheduled inventory

Monthly Cyclic Inventory at the EACHES Level

Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
>99.5% Accuracy Monthly at the Eaches level.
PRI 1
Monthly Total Quantity of eaches associated with Counts with zero adjustments, excluding all 5300 Industrial Hardware material for measurement. During execution of the inventory plan (Oct – Aug). If any month falls below 99.5% accuracy for the month, See Section C-5.4 Physical Inventory.

Annual Cyclic Inventory at the EACHES Level Fiscal Year Accuracy

Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
>99.5% Accuracy Annually by September 30 of each Fiscal Year at the Eaches levels
PRI 1
Annual Total Quantity of eaches associated with Counts with zero adjustments excluding all 5300 Industrial Hardware material for measurement. If accuracy falls below 99.5% accuracy for the Fiscal Year, See Section C-5.4 Physical Inventory
High Dollar Value (HDV) >$25K Total Dollar Value Adjustment Reduction
$ value of HDV Adjustments FYTD vs. $ value of the Prorated HDV Adjustment Target for the year
< of the DLA Distribution HQ established Threshold
PRI 1
Cumulative aggregate dollar value of FYTD adjustments assessed Monthly. (NOTE: Threshold established by DLA Dist HQ based on percent reduction from previous FY)
Unit Price >$5K - <25K Total Dollar Value Adjustment Reduction
$ value of Unit Price Adjustments FYTD vs. $ value of the Prorated Unit Price Adjustment Target for the year
< of the DLA Distribution HQ established Threshold
PRI 2
Cumulative aggregate dollar value of FYTD adjustments assessed Monthly. (NOTE: Threshold established by DLA Dist HQ based on percent reduction from previous FY)
Unit Price <$5K Total Dollar Value Adjustment Reduction
$ value of Unit Price Adjustments FYTD vs. $ value of the Prorated Unit Price Adjustment Target for the year
< of the DLA Distribution HQ established Threshold
PRI 3
Cumulative aggregate dollar value of FYTD adjustments assessed Monthly. (NOTE: Threshold established by DLA Dist HQ based on percent reduction from previous FY)
Floor to Book Accuracy (Completeness)
# of lines that match balance on file vs. total # of lines inventoried FYTD
>98% Accuracy
PRI 1
Percent Accuracy of Monthly QAE F2B Compliance Samples performed in the QMT
Transaction Adjustment Rate (TAR)
Accurate processing of receipt and issue workload
<2%
PRI 2
Number of inventory adjustment transactions against the number of receipts stowed and MROs shipped processed per month.

5.6 PACKAGING

TIMELINESS *

ACTIVITY
STANDARDS
APL
IMPACT
MEASUREMENT UNIVERSE
Packaging/PPP&M Actions
Accomplish all packaging actions within 30 calendar days of an item being confirmed in PPP&M
≥ 90% in 30 calendar days (while meeting all other contract terms and conditions)
PRI 2
PPP&M work orders closed per month (Tracked via EWM Warehouse Monitor (ZPPPMDASH), in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Packaging/PPP&M Actions
Accomplish all packaging actions within 60 calendar days of an item confirmed in PPP&M
100% in 60 calendar days (while meeting all other contract terms and conditions)
PRI 2
PPP&M work orders closed per month (Tracked via EWM Warehouse Monitor (ZPPPMDASH), in Sharepoint, Qlik application, and/or other HQ provisioned tool.)

APLS

5.7.2N RECEIVING (RETAIL)

TIMELINESS

ACTIVITY
STANDARD
APL
Impact
MEASUREMENT UNIVERSE
New Procurement - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
> 90% on-time against 24 business hours standard .
PRI 2
New Procurement lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
New Procurement - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 3 calendar days or less
> 90% on-time against 3 calendar days standard
PRI 2
New Procurement lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Customer Returns - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
> 90% on-time against 24 business hours standard
PRI 3
Customer Return lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Customer Returns - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 5 calendar days or less
> 90% on-time against 5 calendar days standard
PRI 3
Customer Return lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Stock Transfer Order (STO) - TU Create/ASN Unload to Goods Receipt
TU Create/ASN Unload to Goods Receipt in 24 business hours or less
> 90% on-time against 24 business hours standard
PRI 3
Stock Transfer Order (STO) lines goods receipted per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)
Stock Transfer Orders (STO) - TU Create/ASN Unload to Putaway
TU Create/ASN Unload to Putaway in 3 calendar days or less
> 90% on-time against 3 calendar days standard
PRI 3
Stock Transfer Order (STO) lines putaway per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)

NOTE: APLS ABOVE APPLY TO RETAIL RECEIPT OF HAZARDOUS AND/OR CLASSIFIED/CONTROLLED MATERIAL

5.4.N PHYSICAL INVENTORY CONTROL STANDARDS (RETAIL)

QUALITY

ACTIVITY
STANDARD
APL
IMPACT
MEASUREMENT

UNIVERSE

Denial Rate

The right quantity, condition code, and item is located to fill the MRO
≤ 0.40%
PRI 2
Total Denials with Management Codes 1, 2, 4, or 5 divided by the sum of Total MROs Shipped and Full Denials with Management Codes 1, 2, 4, or 5 (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.)

5.7.2N ISSUE (RETAIL)

TIMELINESS *

ACTIVITY
STANDARD
APL
IMPACT
MEASUREMENT UNIVERSE
High Priority MROs
MRO Create to Transportation Departure in 1 calendar day or less
> 85% on-time against 1 calendar day standard excluding weekends and federal holidays
PRI 1
High priority lines issued per month (Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.) For local MROs the APL measurement clock stops when staged for delivery
Requisition Alert - Wholesale Re-warehousing Delivery to Retail to Retail Stow % On Time
Retail Stow ≤ 2 business days
≥ 90% on time against 2 business day standard
PRI 3
Tracked in Sharepoint, Qlik application, and/or other HQ provisioned tool.

TE 5.0

Acceptable Performance Levels (APL)

TE 5.0

Acceptable Performance Levels (APL)

File details come from the government source that posted it. Updated .