Attachment_8_Submittal_Register_.pdf
PDF 42 KB Posted
- Solicitation number
- SP330017B0014
- Issued by
-
Defense Logistics Agency Distribution
About this file
Attachment 8 - Submittal Register
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION OF ITEM SUBMITTED
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
Submittals Accident Prevention Plan (APP) 7.0 G Activity Hazard Analysis (AHA) 7.0 G Safety/Health Plan 7.0 G
Submittal Register 1.3 G
Construction Waste, Pollution Prevention Spreadsheet 1.6 G
Submittals SD-01 Preconstruction Submittals Lead Compliance Plan Including CP Approval 1.4 G Competent Person Qualifications 1.4 G Training Certification of workers and supervisors 1.4 Lead Waste Management Plan 1.4 G Written Evidence that TSD is approved for lead disposal 1.4 Certifications of Medical Examinations 1.4 Accident Prevention Plan (APP) 1.4 G Activity Hazard Analysis (AHA) 1.4 G SD-06 Test Reports Sampling results 1.4 G Occupational and Environmental Assessment Data report 1.4
SD-07 Certificates Licenses, permits and notifications 1.4 Testing Laboratory qualifications 1.4 Clearance certification 1.4 SD-11 Closeout Submittals
Completed and signed hazardous waste manifest from treatment or disposal facility 1.4 Waste turn-in documents or weight ticket for non-hazardous wastes that are 1.4 disposed of at sanitary or construction and demolition landfills
Division 7 - Thermal and Moisture Protection
Division 1 - General Requirements
01 57 20.00 10, Environmental Protection
01 11 00, Statement of Work
01 33 00, Submittal Procedures
Division 2 - Existing Conditions 02 83 13, Lead in Construction
SUBMITTAL REGISTER CONTRACT NO:
TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin
JOB NAME: Paint Interior Walls of Offices & Adjacent Areas, 15 Buildings
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I O N
S E C T I O N
S U B M I T T A L
D O C U M E
T
Y P E
S U B M I T T A L
D O C U M E
D
S C R I P T I O N
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRA
CTOR
REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DAT
E OF
ACTI
ON
D A T E
F O R W A R D E D
T O
R E V I E W E R
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
D A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
APPROVING AUTHORITY
D A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A
M A I L E D
T O
C O N T R A C T
R
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
SUBMITTAL REGISTER CONTRACT NO:
TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin
JOB NAME: Paint Interior Walls of Offices & Adjacent Areas, 15 Buildings
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRA
CTOR
REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DAT
E OF
ACTI
ON
D A T E
F O R W A R D E D
T O
R E V I E W E R
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
D A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
APPROVING AUTHORITY
D A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A
I L E D
T O
C O N T R A C T O R
Submittals SD-03 Product Data 1.2 G Sealants Primer Bond Breakers Backstops Manufacturer's descriptive data including storage requirements, shelf life, curing time instructions for mixing and application, and primer data (if required). Provide a copy of the Material Safety Data Sheet for each solvent, primer or sealant material
SD-07 Certificates Sealant 1.2 G Certificates of compliance stating that the materialsconform to the specified requirements
Division 9 - Finishes
Submittals SD-03 Product Data Certification 1.2 Environmental Data 1.2 Materials 1.2 Coating 1.2 G
SD-04 Samples Color 1.2 G
SD-07 Certificates Applicator's qualifications 1.2 Qualification Testing laboratory for coatings 1.2 G
SD-08 Manufacturer's Instructions Application Instructions 1.2 Mixing 1.2 Manufacturer's Material Safety Data Sheets 1.2
SD-10 Operation and Maintenance Data 09 90 00, Paints and Coating (Cont.)
09 90 00, Paints and Coating
07 92 00, Joint Sealants
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
SUBMITTAL REGISTER CONTRACT NO:
TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin
JOB NAME: Paint Interior Walls of Offices & Adjacent Areas, 15 Buildings
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRA
CTOR
REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DAT
E OF
ACTI
ON
D A T E
F O R W A R D E D
T O
R E V I E W E R
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
D A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
APPROVING AUTHORITY
D A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A
I L E D
T O
C O N T R A C T O R
Coatings 1.2 G
Submittal Register
File details come from the government source that posted it. Updated .