This federal contract opportunity notice seeks general construction services for the renovation of resident and non-resident judges' chambers at the Elbert P. Tuttle Federal Building in Atlanta, Georgia. The General Services Administration intends to award a firm-fixed-price contract between $1 million and $5 million to a single contractor for renovations to two resident judge chambers and four non-resident judge chambers. The contract will utilize the general contractor delivery method with award based on a lowest price technically acceptable selection procedure. As required by law and regulation, all facilities must meet federal energy goals, security requirements, and achieve at least LEED Gold certification. The opportunity is set aside for small businesses only.

View the file

Other files

File Type Posted
Solicitation Amendment 47PE0221R0011 0002.pdf PDF
solicitation 24 August 2021.pdf PDF
solicitation 24 August 2021.pdf PDF
Solicitation Amendment 47PE0221R0011 0002.pdf PDF
Solicitation Amendment 47PE0221R0011 0002.pdf PDF
solicitation 24 August 2021.pdf PDF
Answered RFIs 15 June 2021.xlsx XLSX spreadsheet
Amendment 1442 15 June 2021.pdf PDF
Tab 5 Wage Determination 26 April 2021.pdf PDF
SOW OPTION 2 Resident Chambers 450 and Non Resident Chambers 442 CD DWGS 2021 03 17 (2).pdf PDF
Agreement 19 April 2021.docx DOCX document
Reps and Certs 19 April 2021.docx DOCX document
Site Visit Registration.docx DOCX document
solicitation 19 april 2021.docx DOCX document
1442 soliciation 5 May 2021.pdf PDF
1442 soliciation 5 May 2021.pdf PDF
SOW OPTION 3 Non Resident Chambers 216 CD PM 2021 03 17.pdf PDF
solicitation 19 april 2021.docx DOCX document
Bid Summary Sheet 5 May 2021.docx DOCX document
SOW OPTION 1 Resident Chambers 270 CD PM 2021 03 17 (3).pdf PDF
Agreement 19 April 2021.docx DOCX document
SOW COVER AND DIVISION 1 2021 03 14.pdf PDF
Reps and Certs 19 April 2021.docx DOCX document
SOW OPTION 1 Resident Chambers 270 CD DWGS 2021 03 17 (1).pdf PDF
SOW BASE Non Resident Chambers 238 and 434 CD DWGS 2021 03 17 (1).pdf PDF
SOW OPTION 4 Non Resident Chambers 233 CD DWGS 2021 03 17 (1).pdf PDF
Site Visit Registration.docx DOCX document
SOW OPTION 4 Non Resident Chambers 233 CD PM 2021 03 17.pdf PDF
SOW OPTION 3 Non Resident Chambers 216 CD DWGS 2021 03 17 (1).pdf PDF
SOW OPTION 4 Non Resident Chambers 233 Pre-Renovation ACM and LBP Sampling Report 2021 03 17 (1).pdf PDF
SOW BASE Non Resident Chambers 238 and 434 CD PM 2021 03 17 (1).pdf PDF
SOW BASE Non Resident Chambers 216 and 238 and 434 Pre-Renovation ACM and LBP Survey Report (1).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1819 Peachtree Rd. NE, Suite 102 Atlanta, GA 30309 t: 404.633.4264 f: 404.870.7337 houserwalker.com info@houserwalker.com

U.S. General Services Administration Public Buildings Service Region 4 Atlanta, GA

ELBERT P. TUTTLE COURT OF APPEALS BLDG-

FOURTH FLOOR RESIDENT JUDGES CHAMBERS

Project Number Location 56 Forsyth Street Atlanta, GA

100% CD SUBMISSON

March 26, 2019

Tuttle Court of Appeals 4th Floor Judges Chambers

00 0110 - 1 TABLE OF CONTENTS

SECTION 00 0110

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

A. 00 0110 - Table of Contents

SPECIFICATIONS

2.01 DIVISION 01 -- GENERAL REQUIREMENTS

A. Appendix: GSA General Requirements for the Tuttle Court of Appeals B. Appendix: Hazardous Material Survey and Scope of Work

2.02 DIVISION 02 -- EXISTING CONDITIONS

2.03 DIVISION 03 -- CONCRETE

2.04 DIVISION 04 -- MASONRY

A. 04 4301 – Stone Masonry Veneer

2.05 DIVISION 05 -- METALS

2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

A. 06 1000 - Rough Carpentry B. 06 2000 - Finish Carpentry C. 06 4100 - Architectural Wood Casework

2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

A. 07 8400 - Firestopping B. 07 9200 - Joint Sealants

2.08 DIVISION 08 -- OPENINGS

A. 08 1433 - Stile and Rail Wood Doors B. 08 3100 - Access Doors and Panels C. 08 7000 – Door Hardware D. 08 8000 - Glazing

2.09 DIVISION 09 -- FINISHES

A. 09 2100 – Plaster Repair and Conservation B. 09 2116 - Gypsum Board Assemblies C. 09 3000 – Tiling D. 09 6429 – Wood Strip and Plank Flooring E. 09 6800 – Direct Glue Carpet F. 09 6813 - Tile Carpeting G. 09 9020 - Encapsulation H. 09 9123 - Interior Painting

2.10 DIVISION 10 -- SPECIALTIES

A. 10 2800 - Toilet, Bath, and Laundry Accessories B. 10 4400 - Fire Protection Specialties

2.11 DIVISION 11 -- EQUIPMENT

2.12 DIVISION 12 -- FURNISHINGS

00 0110 - 2 TABLE OF CONTENTS

A. 12 2910 – Wood Shutters

2.13 DIVISION 13 -- SPECIAL CONSTRUCTION

2.14 DIVISION 14 -- CONVEYING EQUIPMENT

2.15 DIVISION 21 -- FIRE SUPPRESSION

A. 21 0000 - Fire Suppression

2.16 DIVISION 22 -- PLUMBING

A. 22 0010 - General Provisions - Plumbing B. 22 0100 - Operation and Maintenance of Plumbing C. 22 0500 - Common Work Results for Plumbing D. 22 0523 - Plumbing Valves and Strainers E. 22 0553 - Identification for Plumbing Piping and Equipment F. 22 0700 - Plumbing Systems Insulation G. 22 1000 - Pipe Fittings and Accessories - Plumbing H. 22 1005 - Plumbing Piping and Drainage Accessories I. 22 3400 – Domestic Water Heating Equipment J. 22 4000 - Plumbing Fixtures and Trim

2.17 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

A. 23 0010 - General Provisions - HVAC B. 23 0100 - Operation and Maintenance of HVAC Systems C. 23 0500 - Common Work Results for HVAC D. 23 0549 - Vibration Isolation E. 23 0553 - Identification for HVAC Piping and Equipment F. 23 0593 - Testing Balancing and Adjusting G. 23 0700 - HVAC Insulation H. 23 0923 - Building Automation and Temperature Control Systems I. 23 3100 - Ductwork J. 23 3616 - Variable Volume Terminals K. 23 3713 - Grills Registers and Diffusers

2.18 DIVISION 26 -- ELECTRICAL

A. 26 0100 - Electrical General Provisions B. 26 1000 - Basic Materials and Methods C. 26 4000 – Electrical Service and Distribution Equipment D. 26 4500 - Grounding E. 26 5000 – Lighting Fixtures F. 26 7200 – Fire Alarm F. 26 7500 – Miscellaneous Systems

2.19 DIVISION 27 -- COMMUNICATIONS

A. 27 1300 – Communications Cabling

2.20 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY

2.21 DIVISION 31 -- EARTHWORK

2.22 DIVISION 32 -- EXTERIOR IMPROVEMENTS

2.23 DIVISION 33 -- UTILITIES

00 0110 - 3 TABLE OF CONTENTS

END OF SECTION

Chambers Renovation

04 4301 - 1 STONE MASONRY VENEER

SECTION 04 4301

STONE MASONRY VENEER AND RESTORATION

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Salvage Historic Cut stone veneer at interior walls.

B. Metal anchors and accessories.

C. Setting mortar .

D. Restoration of Historic marble flooring.

E. Cleaning of veneer trim and wall panels.

1.02 REFERENCE STANDARDS

A. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products; 2015.

B. ASTM C270 - Standard Specification for Mortar for Unit Masonry; 2014a.

C. ASTM C503/C503M - Standard Specification for Marble Dimension Stone; 2010.

D. Comply with Natural Stone Institute Dimension Stone Design Manual, version VIII, 2016.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide data on stone units, attachments, mortar, and reinforcement.

C. Samples: Submit two stone samples illustrating quarry of origin, color range, texture, and markings.

D. Samples: Submit mortar color samples.

1.04 QUALITY ASSURANCE

A. Stone Fabricator Qualifications: Company specializing in fabricating cut stone with minimum five years of experience.

1.05 MOCK-UP

A. Construct stone wall panel mockup, 2 panels in width and full length, including acnchors and dividing strip.

B. Mockup marble flooring restoration for review and approval of Architect.

B. Mock-up may remain as part of the Work.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Protect stone from discoloration during storage on site.

1.07 FIELD CONDITIONS

A. Maintain materials and ambient air at minimum of 40 degrees F (5 degrees C) prior to, during, and for 48 hours after completion of work.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Stone Quarriers:

1. Polycor - Tate, Georgia Quarry.

2. Substitutions: See Section 01 6000 - Product Requirements.

2.02 STONE

A. Marble: Salvaged stone marble wall panels to be removed during demolition, cleaning and reinstalled as part of this work.

N0983512, n1369407

04 4301 - 2 STONE MASONRY VENEER

2.03 MORTAR

A. Setting Mortar: ASTM C270, Type S, using the Proportion Method as specified in Section 04

0511.

1. Products:

a. The QUIKRETE Companies ; QUIKRETE® Veneer Stone Mortar – Polymer Modified : www.quikrete.com.

b. Substitutions: See Section 01 6000 - Product Requirements.

B. Pointing Mortar: Type N as specified in Section 04 0511, and using the Property Method in

ASTM C270.

2.04 ACCESSORIES

A. Wall Ties: Formed steel wire, at least 1 inch (___ mm) diameter, hot dip galvanized per ASTM A123/A123M, eye and pintle type , with provision for vertical adjustment after attachment.

B. Setting Buttons and Shims: Plastic.

C. Cleaning Solution: Type that will not harm stone, joint materials, or adjacent surfaces.

2.05 MARBLE FLOOR AND WALL RESTORATION

A. Existing stone flooring is assumed to have layers of carpet adhesives and floor sealers that have to potential to stain the historic marble. It is the intent for this work to restore the historic marble flooring in areas as noted in the Room Finish Schedule.

B. Existing stone wall panels should be cleaned, repointed, and polished, as necessary.

C. Comply with recommendations from the Natural Stone Institutes DSDM Chapter 21 Restoration and Maintenance including Diagnostics, Repairs, Equipment, Restorative Process and Sealers to grind down, polish and seal restored marble floor.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that support work and site conditions are ready to receive work of this section.

B. Verify that items built-in under other sections are properly located and sized.

3.02 PREPARATION

A. Establish lines, levels, and coursing. Protect from disturbance.

B. Clean stone prior to erection. Do not use wire brushes or implements that mark or damage exposed surfaces.

C. Clean sawn surfaces of rust stains and iron particles.

3.03 INSTALLATION

A. Size stone units to fit opening dimensions and perimeter conditions.

B. Arrange stone pattern to provide color uniformity and minimize visual variations , and provide a uniform blend of stone unit sizes.

C. Provide setting and pointing mortar in accordance with Section 04 0511.

D. Arrange stone coursing as indicated on drawings with consistent joint width.

E. Set stone in full mortar setting bed to fully support stone over bearing surface. Use setting buttons or shims to maintain correct joint width.

3.04 REINFORCEMENT AND ANCHORAGE

A. Attach wall ties to back-up to bond veneer to back-up at maximum 16 inches (400 mm) on center vertically and 36 inches (900 mm) on center horizontally.

B. In addition, place wall ties at maximum 3 inches (75 mm) on center each way around perimeter of openings, within 12 inches (300 mm) of openings.

3.05 JOINTS

A. Leave the following joints open for sealant:

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C270 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C270

N0983512, n1369407

04 4301 - 3 STONE MASONRY VENEER

1. Joints in projecting units.

2. Joints between rigidly anchored units, including soffits, panels, and column covers.

3. Joints below lugged sills and stair treads.

4. Joints below ledge and relieving angles.

B. Rake out mortar joints 5/8 to 3/4 inch (16 to 19 mm) and brush joints clean to accommodate pointing mortar. Fill joints with pointing mortar.

C. Pack mortar into joints and work into voids. Neatly tool surface to concave joint.

D. At joints to be sealed, clean mortar out of joint before it sets. Brush joints clean.

3.06 CLEANING

A. Remove excess mortar as work progresses, and upon completion of work.

B. Clean soiled surfaces with cleaning solution.

C. Use non-metallic tools in cleaning operations.

06 1000 - 1 ROUGH CARPENTRY

SECTION 06 1000

ROUGH CARPENTRY

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Subflooring.

B. Preservative treated wood materials.

C. Fire retardant treated wood materials.

D. Communications and electrical room mounting boards.

E. Concealed wood blocking, nailers, and supports.

F. Miscellaneous wood nailers, furring, and grounds.

1.02 RELATED REQUIREMENTS

1.03 REFERENCE STANDARDS

A. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2009.

B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;

2015a.

C. AWPA U1 - Use Category System: User Specification for Treated Wood; 2012.

D. PS 1 - Structural Plywood; 2009.

E. PS 20 - American Softwood Lumber Standard; 2010.

F. SPIB (GR) - Grading Rules; 2014.

1.04 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide technical data on wood preservative materials.

C. Manufacturer's Certificate: Certify that wood products supplied for rough carpentry meet or exceed specified requirements.

PART 2 PRODUCTS

2.01 GENERAL REQUIREMENTS

A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.

1. If no species is specified, provide any species graded by the agency specified; if no grading agency is specified, provide lumber graded by any grading agency meeting the specified requirements.

2. Grading Agency: Any grading agency whose rules are approved by the Board of Review, American Lumber Standard Committee (www.alsc.org) and who provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.

B. Lumber fabricated from old growth timber is not permitted.

C. Provide wood harvested within a 500 mile (805 km) radius of the project site.

D. Lumber salvaged from deconstruction or demolition of existing buildings or structures is permitted in lieu of sustainably harvested lumber for the applications outlined in this section only, provided it is clean, denailed, and free of paint and finish materials, and other contamination; identify source.

E. Lumber fabricated from recovered timber (abandoned in transit) is permitted in lieu of sustainably harvested lumber, unless otherwise noted, provided it meets the specified requirements for new lumber and is free of contamination; identify source.

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ALSC%20PS%2020

06 1000 - 2 ROUGH CARPENTRY

2.02 DIMENSION LUMBER FOR CONCEALED APPLICATIONS

A. Grading Agency: Southern Pine Inspection Bureau, Inc; SPIB (GR).

B. Sizes: Nominal sizes as indicated on drawings, S4S.

C. Moisture Content: S-dry or MC19.

D. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:

1. Lumber: S4S, No. 2 or Standard Grade.

2. Boards: Standard or No. 3.

2.03 CONSTRUCTION PANELS

A. Underlayment , For subflooring at wood finish flooring: APA Underlayment; plywood, Exposure

2, 19/32 inch (15 mm) thick.

B. Communications and Electrical Room Mounting Boards: PS 1 A-D plywood, or medium density fiberboard; 3/4 inch (19 mm) thick; flame spread index of 25 or less, smoke developed index of 450 or less, when tested in accordance with ASTM E84.

2.04 ACCESSORIES

A. Fasteners and Anchors:

1. Metal and Finish: Hot-dipped galvanized steel complying with ASTM A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.

B. Subfloor Glue: Waterproof, air cure type, cartridge dispensed.

1. Products: Basis of Design

a. Franklin International, Inc. ; Titebond PROvantage Weatherproof Subfloor Adhesive:

www.titebond.com/sle.

C. Construction Adhesives:

1. Products: Basis of Design

a. Franklin International, Inc. ; Titebond Fast Set Polyurethane Construction Adhesive:

www.titebond.com/sle.

D. Building Paper: Water resistant Kraft paper.

2.05 FACTORY WOOD TREATMENT

A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.

1. Fire-Retardant Treated Wood: Mark each piece of wood with producer's stamp indicating compliance with specified requirements.

2. Preservative-Treated Wood: Provide lumber and plywood marked or stamped by an

ALSC-accredited testing agency, certifying level and type of treatment in accordance with AWPA standards.

B. Fire Retardant Treatment:

1. Interior Type A: AWPA U1, Use Category UCFA, Commodity Specification H, low temperature (low hygroscopic) type, chemically treated and pressure impregnated;

capable of providing a maximum flame spread index of 25 when tested in accordance with ASTM E84, with no evidence of significant combustion when test is extended for an additional 20 minutes.

a. Kiln dry wood after treatment to a maximum moisture content of 19 percent for lumber and 15 percent for plywood.

b. Treat rough carpentry items as indicated .

c. Do not use treated wood in applications exposed to weather or where the wood may become wet.

C. Preservative Treatment:

1. Preservative Pressure Treatment of Lumber Above Grade: AWPA U1, Use Category UC3B, Commodity Specification A using waterborne preservative .

a. Kiln dry lumber after treatment to maximum moisture content of 19 percent.

http://www.spib.org/publications.shtml http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=APA%20PS%201 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20E84 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=AWPA%20U1 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=AWPA%20U1 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20E84 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=AWPA%20U1

06 1000 - 3 ROUGH CARPENTRY

b. Treat lumber in contact with masonry or concrete.

PART 3 EXECUTION

3.01 PREPARATION

3.02 INSTALLATION - GENERAL

A. Select material sizes to minimize waste.

B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.

C. Where treated wood is used on interior, provide temporary ventilation during and immediately after installation sufficient to remove indoor air contaminants.

3.03 BLOCKING, NAILERS, AND SUPPORTS

A. Provide framing and blocking members as indicated or as required to support finishes, fixtures, specialty items, and trim.

B. In framed assemblies that have concealed spaces, provide solid wood fireblocking as required by applicable local code, to close concealed draft openings between floors and between top story and roof/attic space; other material acceptable to code authorities may be used in lieu of solid wood blocking.

C. In metal stud walls, provide continuous blocking around door and window openings for anchorage of frames, securely attached to stud framing.

D. In walls, provide blocking attached to studs as backing and support for wall-mounted items, unless item can be securely fastened to two or more studs or other method of support is explicitly indicated.

E. Where ceiling-mounting is indicated, provide blocking and supplementary supports above ceiling, unless other method of support is explicitly indicated.

F. Provide the following specific non-structural framing and blocking:

1. Cabinets and shelf supports.

2. Wall brackets.

3. Towel and bath accessories.

4. Wall-mounted door stops.

5. Marker boards.

6. Wall millwork and trim.

7. Joints of rigid wall coverings that occur between studs.

3.04 INSTALLATION OF CONSTRUCTION PANELS

A. Underlayment: Secure to subflooring with nails and glue.

1. Place building paper between floor underlayment and subflooring.

B. Communications and Electrical Room Mounting Boards: Secure with screws to studs with edges over firm bearing; space fasteners at maximum 24 inches (610 mm) on center on all edges and into studs in field of board.

1. At fire-rated walls, install board over wall board indicated as part of the fire-rated assembly.

2. Where boards are indicated as full floor-to-ceiling height, install with long edge of board parallel to studs.

3. Install adjacent boards without gaps.

3.05 TOLERANCES

A. Framing Members: 1/4 inch (6 mm) from true position, maximum.

B. Surface Flatness of Floor: 1/8 inch in 10 feet (1 mm/m) maximum, and 1/4 inch in 30 feet (7 mm in 10 m) maximum.

C. Variation from Plane (Other than Floors): 1/4 inch in 10 feet (2 mm/m) maximum, and 1/4 inch in 30 feet (7 mm in 10 m) maximum.

06 1000 - 4 ROUGH CARPENTRY

3.06 CLEANING

A. Waste Disposal: Comply with the requirements of Section 01 7419 - Construction Waste

Management and Disposal.

1. Comply with applicable regulations.

2. Do not burn scrap on project site.

3. Do not burn scraps that have been pressure treated.

4. Do not send materials treated with pentachlorophenol, CCA, or ACA to co-generation facilities or “waste-to-energy” facilities.

B. Do not leave any wood, shavings, sawdust, etc. on the ground or buried in fill.

C. Prevent sawdust and wood shavings from entering the storm drainage system.

06 2000 - 1 FINISH CARPENTRY

SECTION 06 2000

FINISH CARPENTRY

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Finish carpentry items.

B. Wood door frames and glazed frames.

C. Wood casings and moldings.

E. Mirror Glass F. Antiqued Mirror Glass

1.02 RELATED REQUIREMENTS

A. Section 01 6116 - Volatile Organic Compound (VOC) Content Restrictions.

B. Section 06 4100 - Architectural Wood Casework: Shop fabricated custom cabinet work.

C. Section 08 1433 - Stile and Rail Wood Doors.

1.03 REFERENCE STANDARDS

A. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards; 2014.

B. HPVA HP-1 - American National Standard for Hardwood and Decorative Plywood; 2009.

C. NEMA LD 3 - High-Pressure Decorative Laminates; 2005.

D. PS 1 - Structural Plywood; 2009.

1.04 ADMINISTRATIVE REQUIREMENTS

A. Coordinate the work with plumbing rough-in, electrical rough-in, and installation of associated and adjacent components.

1.05 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Shop Drawings: Indicate materials, component profiles, fastening methods, jointing details, and accessories.

1. Minimum Scale of Detail Drawings: 1-1/2 inch to 1 foot (1:8).

2. Provide the information required by AWI/AWMAC/WI (AWS).

C. Samples: Submit two samples of finish plywood, __12__x__12__ inch (____x____ mm) in size illustrating wood grain and specified finish.

D. Samples: Submit two samples of wood trim 12 inch (____ mm) long.

1.06 QUALITY ASSURANCE

A. Fabricator Qualifications: Company specializing in fabricating the products specified in this section with minimum five years of documented experience.

1. Company with at least one project in the past 5 years with value of woodwork within 20 percent of cost of woodwork for this Project.

2. Single Source Responsibility: Provide and install this work from single fabricator.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Protect work from moisture damage.

PART 2 PRODUCTS

2.01 FINISH CARPENTRY ITEMS

A. Quality Grade: Unless otherwise indicated provide products of quality specified by AWI/AWMAC/WI (AWS) for Custom Grade.

http://www.awinet.org/

06 2000 - 2 FINISH CARPENTRY

B. Interior Woodwork Items: All items to be solid stock, S4S and to AWI Premium Grade unless otherwise indicated.

1. Moldings, Bases, Casings, and Miscellaneous Trim:

a. Species: White Oak

b. Grain: Quarter Sawn unless otherwise noted.

c. Prepare for finish as indicated in Drawings.

2. Door, Glazed Light, and Pocket Door Frames: White oak; prepare for finish as indicated in drawings.

a. Species: White Oak

b. Grain: Quarter Sawn unless otherwise noted.

c. Prepare for finish as indicated in Drawings.

3. Window Casing, Jambs, Stools, Aprons:

a. Species: White Oak

b. Grain: Quarter Sawn unless otherwise noted.

c. Prepare for finish as indicated in Drawings.

d. Mill to profiles as indicated in Drawings.

2.02 WOOD-BASED COMPONENTS

A. Wood fabricated from old growth timber is not permitted.

2.03 LUMBER MATERIALS

A. Hardwood Lumber: HW1 White Oak species, quarter sawn, maximum moisture content of 6 percent ; with vertical grain , of quality suitable for transparent finish.

2.04 SHEET MATERIALS

A. Softwood Plywood , Not Exposed to View: Any face species, veneer core ; PS 1 Grade A-B, glue type as recommended for application.

B. Softwood Plywood , Exposed to View: Face species as indicated, plain sawn, medium density fiberboard core ; PS 1 Grade A-B, glue type as recommended for application.

C. Hardwood Plywood (HP1): Face species as indicated, quarter cut , book matched, medium density fiberboard core ; HPVA HP-1, Front Face Grade AA, Back Face Grade 1, glue type as recommended for application.

D. Hardboard Sheet (HP3): AHA A135.4; Medium Density Overlay, 3/4 inch (____ mm) thick, smooth one side (S1S).

2.05 PLASTIC LAMINATE MATERIALS

2.06 FASTENINGS

A. Adhesive for Purposes Other Than Laminate Installation: Suitable for the purpose; not containing formaldehyde or other volatile organic compounds.

B. Concealed Joint Fasteners: Threaded steel.

2.07 ACCESSORIES

A. Lumber for Shimming and Blocking: Softwood lumber of spruce, pine, or fir species.

B. Primer: Alkyd primer sealer.

C. Wood Filler: Solvent base, tinted to match surface finish color.

D. Mirror Glass: Custom built frame. See detail on A300

1. Annealed Float Glass: Silvering, protective and physical characteristics in compliance with ASTM C1503.

2. Size: As indicated on drawings.

E. Antiqued Mirror Glass:

1. Acid Antiqued Mirrored Glass, https://www.antiquedmirroredglass.com/about.html;

john@antiquedmirroredglass.com 404.314.2520. Finish to be selected by architect from manufacturer’s full range. Substitutions allowed.

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C1503 mailto:john@antiquedmirroredglass.com

06 2000 - 3 FINISH CARPENTRY

2.08 FABRICATION

A. Shop assemble work for delivery to site, permitting passage through building openings.

B. Fit exposed sheet material edges with 3/8 inch (9 mm) matching hardwood edging. Use one piece for full length only.

C. Cap exposed plastic laminate finish edges with material of same finish and pattern.

D. Shop prepare and identify components for book match grain matching during site erection.

E. When necessary to cut and fit on site, provide materials with ample allowance for cutting.

Provide trim for scribing and site cutting.

F. Apply plastic laminate finish in full uninterrupted sheets consistent with manufactured sizes. Fit corners and joints hairline; secure with concealed fasteners. Slightly bevel arises. Locate counter butt joints minimum 2 feet (600 mm) from sink cut-outs.

2.09 SHOP FINISHING

A. Sand work smooth and set exposed nails and screws.

B. Apply wood filler in exposed nail and screw indentations.

C. On items to receive transparent finishes, use wood filler that matches surrounding surfaces and is of type recommended for the applicable finish.

D. Finish work in accordance with AWI/AWMAC/WI (AWS), Section 5 - Finishing for grade specified and as follows:

1. Transparent: Type A

a. System - 1, Lacquer, Nitrocellulose.

b. Stain: As selected by Architect.

c. Sheen: Flat.

2. Transparent: Type B

a. System - 12, Polyurethane, Water-based.

b. Color: As selected by Architect.

c. Sheen: Flat.

E. Back prime woodwork items to be field finished, prior to installation.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify adequacy of backing and support framing.

B. Verify mechanical, electrical, and building items affecting work of this section are placed and ready to receive this work.

3.02 INSTALLATION

A. Install work in accordance with AWI/AWMAC/WI (AWS) requirements for grade indicated.

B. Set and secure materials and components in place, plumb and level.

C. Carefully scribe work abutting other components, with maximum gaps of 1/32 inch (0.79 mm).

Do not use additional overlay trim to conceal larger gaps.

3.03 PREPARATION FOR SITE FINISHING

A. Set exposed fasteners. Apply wood filler in exposed fastener indentations. Sand work smooth.

3.04 TOLERANCES

A. Maximum Variation from True Position: 1/16 inch (1.6 mm).

B. Maximum Offset from True Alignment with Abutting Materials: 1/32 inch (0.79 mm).

06 4100 - 1 ARCHITECTURAL WOOD

CASEWORK

SECTION 06 4100

ARCHITECTURAL WOOD CASEWORK

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Specially fabricated cabinet units.

B. Countertops.

C. Cabinet hardware.

D. Preparation for installing utilities.

1.02 RELATED REQUIREMENTS

A. Section 09 9123 - Interior Painting: Site finishing of cabinet exterior.

1.03 REFERENCE STANDARDS

A. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards; 2014.

B. BHMA A156.9 - American National Standard for Cabinet Hardware; 2010.

C. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards; 2014.

D. BHMA A156.9 - American National Standard for Cabinet Hardware; 2010.

1.04 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Convene a preinstallation meeting not less than one week before starting work of this section; require attendance by all affected installers.

1.05 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Shop Drawings: Indicate materials, component profiles, fastening methods, jointing details, and accessories.

1. Minimum Scale of Detail Drawings: 1-1/2 inch to 1 foot (1:8).

C. Product Data: Provide data for hardware accessories.

D. Samples: Submit actual samples of architectural cabinet construction, minimum 12 inches (300

mm) square, illustrating proposed cabinet, countertop, and shelf unit substrate and finish.

E. Samples: Submit actual sample items of proposed pulls, hinges, shelf standards, and locksets, demonstrating hardware design, quality, and finish.

1.06 QUALITY ASSURANCE

A. Fabricator Qualifications: Company specializing in fabricating the products specified in this section with minimum five years of documented experience.

1. Company with at least one project in the past 5 years with value of woodwork within 20 percent of cost of woodwork for this Project.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Protect units from moisture damage.

1.08 FIELD CONDITIONS

A. During and after installation of custom cabinets, maintain temperature and humidity conditions in building spaces at same levels planned for occupancy.

PART 2 PRODUCTS

2.01 CABINETS

A. Quality Grade: Unless otherwise indicated provide products of quality specified by AWI/AWMAC/WI (AWS) for Premium Grade.

06 4100 - 2 ARCHITECTURAL WOOD

B. Cabinet Type "CAB-1" Wood Veneer Faced Cabinets: Premium Grade

1. Finish- Exposed Exterior Surfaces: Wood, Grade AA, Species as scheduled below;

Veneers to be slip matched. Solid to match as closely as possible to veneers.

2. Grained Face Layout for Cabinet and Door Fronts: Shaker Style.

a. Premium Grade: Doors, drawer fronts, door panels, and false fronts wood grain to run and match vertically within each cabinet unit.

b. Door and Drawer Front Edges Profiles: Solid hardwood, species to match as closely as possible to veneers.

C. General Cabinet "Carcass" Construction (all locations)

1. Finish - Exposed Interior Surfaces: Melamine covering over Medium Density Fiberboard.

2. Finish - Concealed Surfaces: Medium Density Fiberboard, sealed clear finish.

3. Door and Drawer Front Retention Profiles: Fixed panel.

4. Casework Construction Type: Type A - Frameless.

5. Interface Style for Cabinet and Door: Style 2 - Finish Inset; flush overlay.

6. Cabinet Design Series: As indicated on the Drawings.

7. Cabinet Style: Flush overlay.

8. Cabinet Doors and Drawer Fronts: Flush style, Shaker Style.

9. Drawer Side Construction: Multiple-dovetailed.

2.02 WOOD-BASED COMPONENTS

A. Wood fabricated from old growth timber is not permitted.

2.03 LAMINATE MATERIALS

2.04 COUNTERTOPS

A. Countertop Type "WC": Solid Wood Countertop Surfaces: solid wood and/or veneers as indicated in Drawings.

1. Locations: As Scheduled Below.

2. Edges: 1 ½” thickness, solid hardwood edge with ¼” radius edges.

3. Species: Species to match casework as indicated in schedule below.

4. Finish: Coordinate finish of wood countertop to match finish of millwork below.

B. Countertop Type "SS": Solid Surfacing Countertop Surfaces: solid, non-porous, homogeneous surfacing material composed of acrylic resin and natural minerals.

1. Locations: As Scheduled Below.

2. Edges: Unless otherwise indicated in Drawings, edges to be squared, no return apron.

3. Backsplash: none.

4. Substrate: Unless otherwise indicated in Drawings, substrate to be 3/4" plywood.

5. Thickness: 3 cm

2.05 ACCESSORIES

A. Adhesive: Type recommended by fabricator to suit application.

B. Bolts, Nuts, Washers, Lags, Pins, and Screws: Of size and type to suit application; galvanized or chrome-plated finish in concealed locations and stainless steel or chrome-plated finish in exposed locations.

C. Concealed Joint Fasteners: Threaded steel.

D. Wire Management (WM): Basis of Design -

1. Doug Mockett Company, Model WM7 Velcro Guide E. Exposed Grommets (G): Basis of Design -

1. Doug Mockett Company; MAX1/A-94 -"The Max" Small Size grommet; Brushed Aluminum finish.

2. Assume two per computer. See AI003 for computer locations. Coordinate final location with Courts Staff.

F. Concealed Grommets: Standard plastic or painted metal grommets for cut-outs, in color to match adjacent surface.

06 4100 - 3 ARCHITECTURAL WOOD

G. Trash Management Liner: Basis of Design

1. Doug Mockett Company; TM Series, TM1-92, Light Grey ABS Plastic.

2.06 HARDWARE

A. Hardware: BHMA A156.9, types as recommended by fabricator for quality grade specified.

B. Adjustable Shelf Supports: Standard side-mounted system using recessed steel pilaster strip -and coordinated shelf rests, for nominal 1/2 inch spacing adjustments.

1. Pilaster Product: Knape & Vogt Steel heavy Duty Shelf Pilaster 23 Ga.

2. Shelf Support Product; Knape & Vogt Steel Shelf Support 23 Ga. 1in.L

3. Length: As needed

4. Color: White, Powder Coated

5. Weight Rating: 250 lb

C. Catches: Magnetic.

D. Drawer Slides:

1. Type: Full extension.

2. Static Load Capacity: Heavy Duty grade.

3. Mounting: Side mounted.

4. Stops: Integral type.

5. Features: Provide self closing/stay closed type.

6. Manufacturers:

a. Accuride International, Inc : www.accuride.com.

b. Grass America Inc : www.grassusa.com.

c. Hettich America, LP : www.hettich.com/sle.

d. Knape & Vogt Manufacturing Company : www.knapeandvogt.com.

E. Hinges: European style concealed self-closing type, BHMA No. 1 Grade, steel with satin finish.

1. Manufacturers:

a. Grass America Inc : www.grassusa.com.

b. Hardware Resources : www.hardwareresources.com.

c. Hettich America, LP : www.hettich.com/sle.

d. Julius Blum, Inc : www.blum.com.

F. Drawer and Door Pulls

1. Product: Top Knobs – Emerald Knob 1 1/8” TKTK286BSN

a. Finish: Brushed Satin Nickel

b. Length: Knob

c. Location: Cabinet Doors Other Than Toilets

2. Product: Top Knobs – Emerald Pull 9” TKTK290BSN

a. Finish: Brushed Satin Nickel

b. Length: 9”

c. Location: Drawers in Workroom and Breakroom

3. Product: Top Knobs – Emerald Bull 5” TKTK288BSN

a. Length: 5”

b. Location: Drawers in Judicial Assistant, Judge, Staff Attorney and Law Clerks.

3. Product: Emtek Alexander Pull 5” Length in Satin Brass

a. Location: Cabinet Doors and Drawers inToilets

F. Cabinet Locks: Keyed cylinder, two keys per lock, master keyed, steel with chrome finish.

G. Provide File Drawer hardware at cabinets noted as File Drawers.

H. Provide Trash Bin hardware at cabinets noted as Trash.

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ANSI%20A156.9

06 4100 - 4 ARCHITECTURAL WOOD

2.07 SITE FINISHING MATERIALS

A. Finishing: Site finished as specified in Section 09 9123.

2.08 FABRICATION

A. Assembly: Shop assemble cabinets for delivery to site in units easily handled and to permit passage through building openings.

B. Edging: Fit shelves, doors, and exposed edges with specified edging. Do not use more than one piece for any single length.

C. Fitting: When necessary to cut and fit on site, provide materials with ample allowance for cutting. Provide matching trim for scribing and site cutting.

D. E. Matching Wood Grain: Comply with requirements of quality standard for specified Grade and as follows:

1. Provide center matched panels at each elevation.

2. Carry figure of cabinet fronts to toe kicks.

E. Provide cutouts for plumbing fixtures. Verify locations of cutouts from on-site dimensions.

Prime paint cut edges.

2.09 SHOP FINISHING

A. Sand work smooth and set exposed nails and screws.

B. For opaque finishes, apply wood filler in exposed nail and screw indentations and sand smooth.

C. On items to receive transparent finishes, use wood filler matching or blending with surrounding surfaces and of types recommended for applied finishes.

D. Finish work in accordance with AWI/AWMAC/WI (AWS), Section 5 - Finishing for grade specified and as follows:

1. Finish 1: Painted same color as wall and trim paint in room where installed, refer to AI001

Finish Schedule

a. Sheen: Satin.

2. Finish 2: Transparent Finish: for White Oak species Toielt cabinets.

a. System - 1, Lacquer, Nitrocellulose.

b. Sheen: Satin.

3.01 EXAMINATION

A. Verify adequacy of backing and support framing.

3.02 INSTALLATION

A. Set and secure custom cabinets in place, assuring that they are rigid, plumb, and level.

B. Use fixture attachments in concealed locations for wall mounted components.

C. Use concealed joint fasteners to align and secure adjoining cabinet units.

D. Secure cabinets to floor using appropriate angles and anchorages.

E. Countersink anchorage devices at exposed locations. Conceal with solid wood plugs of species to match surrounding wood; finish flush with surrounding surfaces.

3.03 ADJUSTING

A. Adjust installed work.

B. Adjust moving or operating parts to function smoothly and correctly.

3.04 CLEANING

A. Clean casework, counters, shelves, hardware, fittings, and fixtures.

06 4100 - 5 ARCHITECTURAL WOOD

3.05 CASEWORK SCHEDULES: SEE SHEET AI001 FOR MATERIAL REFERENCES AND

LOCATIONS

A. CBR- Casework Breakroom

1. Casework: Standard Carcass Construction

a. Cabinet Type: CAB-1

b. Species: Species: White or Red Oak or Beech.

c. Finish: Finish 1

d. Thickness of doors: 3/4"

e. Door pulls: Door Pull and Drawer Pulls as specified above

2. Countertop:

a. Counter type: SS

b. Substrate: Plywood as noted in Section 06 2000

c. Sizes and pattern: as indicated on drawings.

3. Millwork:

a. Species of Trim/ Miscellaneous Millwork: match casework type

b. Thickness: 3/4" nominal unless noted otherwise.

c. Finish: match casework type

d. Sizes and pattern: as indicated on drawings.

e. Provide 2 ½” end panels at exposed cabinet ends, see casework details.

B. CDZ -Credenzas and Wall Shelves: Law Clerks, Staff Attorney, Judicial Assistant and Intern

1. Casework: Standard Carcass Construction

a. Cabinet Type: CAB-1

b. Species: White or Red Oak or Beech

c. Finish: Finish 1.

d. Thickness of doors: 3/4"

e. Door pulls: Door Pull and Drawer Pulls as specified above

2. Countertop:

a. Counter type: WC

b. Finish/Species: to match casework finish

c. Substrate: Plywood as noted in Section 06 2000

d. Sizes and pattern: as indicated on drawings.

3. Millwork:

a. Species of Trim/ Miscellaneous Millwork: match casework type

b. Thickness: 3/4" nominal unless noted otherwise.

c. Finish: match casework type

d. Sizes and pattern: as indicated on drawings.

C. CP- Column Panels: paneled wood column wrapping LBC- Library Bookcases: half height bookcases, Library island

1. Casework:

a. Finish: Finish 1

b. Species: White or Red Oak or Beech, Quartersawn

c. Substrate: Plywood as noted in Section 06 2000

d. Sizes and pattern: As indicated on Drawings.

e. Library Island counters: Type WC

D. CWJ- Casework Judge Desk and Hutches

1. Casework: Standard Carcass Construction

a. Cabinet Type: CAB-1

b. Base Cabinet / Desk Species: White or Red Oak or Beech

c. Finish: Finish 1

d. Wall Shelving / Bookcases Species: White or Red Oak or Beech

e. Finish: Finish 1

f. Thickness of doors: 3/4"

06 4100 - 6 ARCHITECTURAL WOOD

g. Door pulls: Door Pull and Drawer Pulls as specified above

h. Standing desk: Coordinate Judge desk with owner provided standing desk base.

Owner provided, contractor installed. Humanscale Design Studio, Model: Float, or similar. Provide custom 2 piece wood overlapped modesty panel mounted to base of desk and desk top to adjust with standing desk (use drawer slides or similar).

i.

2. Countertop:

a. Counter type: WC

b. Finish/Species: to match casework finish

c. Substrate: Plywood as noted in Section 06 2000

d. Sizes and pattern: as indicated on drawings.

3. Millwork:

a. Species of Trim/ Miscellaneous Millwork: White or Red Oak or Beech

b. Thickness: 3/4" nominal unless noted otherwise.

c. Finish: match casework type

d. Sizes and pattern: as indicated on drawings.

E. CWR- Casework Workroom

1. Casework: Standard Carcass Construction

a. Cabinet Type: CAB-1

b. Species: Species: Walnut veneer, Alpiwood AW. 11, or similar.

c. Finish: Finish 2: Transparent Finish, or prefinished.

d. Thickness of doors: 3/4"

e. Door pulls: Door Pull and Drawer Pulls as specified above

2. Countertop:

a. Counter type: SS

b. Substrate: Plywood as noted in Section 06 2000

c. Sizes and pattern: as indicated on drawings.

3. Millwork:

a. Species of Trim/ Miscellaneous Millwork: match casework type

b. Thickness: 3/4" nominal unless noted otherwise.

c. Finish: match casework type

d. Sizes and pattern: as indicated on drawings.

e. Provide 2 ½” end panels at exposed cabinet ends, see casework details.

F. VJ- Casework Vanity Judge Toilet VS- Casework Vanity Staff Toilet

1. Casework: Standard Carcass Construction

a. Cabinet Type: CAB-1

b. Species: Species: White Oak

c. Finish: Finish 2: Transparent Finish, or prefinished.

d. Thickness of doors: 3/4"

e. Door pulls: Door Pull and Drawer Pulls as specified above

2. Countertop:

a. Counter type: SS

b. Substrate: Plywood as noted in Section 06 2000

c. Sizes and pattern: as indicated on drawings.

3. Millwork:

a. Species of Trim/ Miscellaneous Millwork: match casework type

b. Thickness: 3/4" nominal unless noted otherwise.

c. Finish: match casework type

d. Sizes and pattern: as indicated on drawings.

e. Provide 2 ½” end panels at exposed cabinet ends, see casework details.

G. SD- Standing Desk tops

1. Countertop:

06 4100 - 7 ARCHITECTURAL WOOD

a. Counter type: WC

b. Species: Species: White or Red Oak or Beech.

c. Finish: Finish 1.

d. Substrate: Plywood as noted in Section 06 2000

e. Sizes and pattern: as indicated on drawings.

f. Coordinate with owner provided standing desk base. Owner provided, contractor installed. Humanscale Design Studio, Model: Float, or similar.

H. NJV- Casework Nonresident Judge Vanity NJW- Casework Nonresident Judge Wardrobe

1. Casework: Standard Carcass Construction

a. Cabinet Type: CAB-1

b. Finish: Finish 1

b. Species: White or Red Oak or Beech

d. Thickness of doors: 3/4"

e. Door pulls: Door Pull and Drawer Pulls as specified above

2. Countertop:

a. Counter type: SS

b. Substrate: Plywood as noted in Section 06 2000

c. Sizes and pattern: as indicated on drawings.

3. Millwork:

a. Species of Trim/ Miscellaneous Millwork: match casework type

b. Thickness: 3/4" nominal unless noted otherwise.

c. Finish: match casework type

d. Sizes and pattern: as indicated on drawings.

e. Provide 2 ½” end panels at exposed cabinet ends, see casework details.

06 4100 - 1 ARCHITECTURAL WOOD

SECTION 06 4100

ARCHITECTURAL WOOD CASEWORK

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Specially fabricated cabinet units.

B. Countertops.

C. Cabinet hardware.

D. Preparation for installing utilities.

1.02 RELATED REQUIREMENTS

A. Section 09 9123 - Interior Painting: Site finishing of cabinet exterior.

1.03 REFERENCE STANDARDS

A. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards; 2014.

B. BHMA A156.9 - American National Standard for Cabinet Hardware; 2010.

C. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards; 2014.

D. BHMA A156.9 - American National Standard for Cabinet Hardware; 2010.

1.04 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Convene a preinstallation meeting not less than one week before starting work of this section; require attendance by all affected installers.

1.05 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Shop Drawings: Indicate materials, component profiles, fastening methods, jointing details, and accessories.

1. Minimum Scale of Detail Drawings: 1-1/2 inch to 1 foot (1:8).

C. Product Data: Provide data for hardware accessories.

D. Samples: Submit actual samples of architectural cabinet construction, minimum 12 inches (300

mm) square, illustrating proposed cabinet, countertop, and shelf unit substrate and finish.

E. Samples: Submit actual sample items of proposed pulls, hinges, shelf standards, and locksets, demonstrating hardware design, quality, and finish.

1.06 QUALITY ASSURANCE

A. Fabricator Qualifications: Company specializing in fabricating the products specified in this section with minimum five years of documented experience.

1. Company with at least one project in the past 5 years with value of woodwork within 20 percent of cost of woodwork for this Project.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Protect units from moisture damage.

1.08 FIELD CONDITIONS

A. During and after installation of custom cabinets, maintain temperature and humidity conditions in building spaces at same levels planned for occupancy.

PART 2 PRODUCTS

2.01 CABINETS

A. Quality Grade: Unless otherwise indicated provide products of quality specified by AWI/AWMAC/WI (AWS) for Premium Grade.

06 4100 - 2 ARCHITECTURAL WOOD

B. Cabinet Type "CAB-1" Wood Veneer Faced Cabinets: Premium Grade

1. Finish- Exposed Exterior Surfaces: Wood, Grade AA, Species as scheduled below;

Veneers to be slip matched. Solid to match as closely as possible to veneers.

2. Grained Face Layout for Cabinet and Door Fronts: Shaker Style.

a. Premium Grade: Doors, drawer fronts, door panels, and false fronts wood grain to run and match vertically within each cabinet unit.

b. Door and Drawer Front Edges Profiles: Solid hardwood, species to match as closely as possible to veneers.

C. General Cabinet "Carcass" Construction (all locations)

1. Finish - Exposed Interior Surfaces: Melamine covering over Medium Density Fiberboard.

2. Finish - Concealed Surfaces: Medium Density Fiberboard, sealed clear finish.

3. Door and Drawer Front Retention Profiles: Fixed panel.

4. Casework Construction Type: Type A - Frameless.

5. Interface Style for Cabinet and Door: Style 2 - Finish Inset; flush overlay.

6. Cabinet Design Series: As indicated on the Drawings.

7. Cabinet Style: Flush overlay.

8. Cabinet Doors and Drawer Fronts: Flush style, Shaker Style.

9. Drawer Side Construction: Multiple-dovetailed.

2.02 WOOD-BASED COMPONENTS

A. Wood fabricated from old growth timber is not permitted.

2.03 LAMINATE MATERIALS

2.04 COUNTERTOPS

A. Countertop Type "WC": Solid Wood Countertop Surfaces: solid wood and/or veneers as indicated in Drawings.

1. Locations: As Scheduled Below.

2. Edges: 1 ½” thickness, solid hardwood edge with ¼” radius edges.

3. Species: Species to match casework as indicated in schedule below.

4. Finish: Coordinate finish of wood countertop to match finish of millwork below.

B. Countertop Type "SS": Solid Surfacing Countertop Surfaces: solid, non-porous, homogeneous surfacing material composed of acrylic resin and natural minerals.

1. Locations: As Scheduled Below.

2. Edges: Unless otherwise indicated in Drawings, edges to be squared, no return apron.

3. Backsplash: none.

4. Substrate: Unless otherwise indicated in Drawings, substrate to be 3/4" plywood.

5. Thickness: 3 cm

2.05 ACCESSORIES

A. Adhesive: Type recommended by fabricator to suit application.

B. Bolts, Nuts, Washers, Lags, Pins, and Screws: Of size and type to suit application; galvanized or chrome-plated finish in concealed locations and stainless steel or chrome-plated finish in exposed locations.

C. Concealed Joint Fasteners: Threaded steel.

D. Wire Management (WM): Basis of Design -

1. Doug Mockett Company, Model WM7 Velcro Guide E. Exposed Grommets (G): Basis of Design -

1. Doug Mockett Company; MAX1/A-94 -"The Max" Small Size grommet; Brushed Aluminum finish.

2. Assume two per computer. See AI003 for computer locations. Coordinate final location with Courts Staff.

F. Concealed Grommets: Standard plastic or painted metal grommets for cut-outs, in color to match adjacent surface.

06 4100 - 3 ARCHITECTURAL WOOD

G. Trash Management Liner: Basis of Design

1. Doug Mockett Company; TM Series, TM1-92, Light Grey ABS Plastic.

2.06 HARDWARE

A. Hardware: BHMA A156.9, types as recommended by fabricator for quality grade specified.

B. Adjustable Shelf Supports: Standard side-mounted system using recessed metal shelf standards or multiple holes for pin supports and coordinated self rests, polished chrome finish, for nominal 1 inch (25 mm) spacing adjustments.

C. Catches: Magnetic.

D. Drawer Slides:

1. Type: Full extension.

2. Static Load Capacity: Heavy Duty grade.

3. Mounting: Side mounted.

4. Stops: Integral type.

5. Features: Provide self closing/stay closed type.

6. Manufacturers:

a. Accuride International, Inc : www.accuride.com.

b. Grass America Inc : www.grassusa.com.

c. Hettich America, LP : www.hettich.com/sle.

d. Knape & Vogt Manufacturing Company : www.knapeandvogt.com.

E. Hinges: European style concealed self-closing type, BHMA No. 1 Grade, steel with satin finish.

1. Manufacturers:

a. Grass America Inc : www.grassusa.com.

b. Hardware Resources : www.hardwareresources.com.

c. Hettich America, LP : www.hettich.com/sle.

d. Julius Blum, Inc : www.blum.com.

F. Drawer and Door Pulls

1. Product: Top Knobs – Emerald Knob 1 1/8” TKTK286BSN

a. Finish: Brushed Satin Nickel

b. Length: Knob

c. Location: Cabinet Doors Other Than Toilets

2. Product: Top Knobs – Emerald Pull 9” TKTK290BSN

a. Finish: Brushed Satin Nickel

b. Length: 9”

c. Location: Drawers in Workroom and Breakroom

3. Product: Top Knobs – Emerald Bull 5” TKTK288BSN

a. Length: 5”

b. Location: Drawers in Judicial Assistant, Judge, Staff Attorney and Law Clerks.

3. Product: Emtek Alexander Pull 5” Length in Satin Brass

a. Location: Cabinet Doors and Drawers inToilets

F. Cabinet Locks: Keyed cylinder, two keys per lock, master keyed, steel with chrome finish.

G. Provide File Drawer hardware at cabinets noted as File Drawers.

H. Provide Trash Bin hardware at cabinets noted as Trash.

2.07 SITE FINISHING MATERIALS

A. Finishing: Site finished as specified in Section 09 9123.

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ANSI%20A156.9

06 4100 - 4 ARCHITECTURAL WOOD

2.08 FABRICATION

A. Assembly: Shop assemble cabinets for delivery to site in units easily handled and to permit passage through building openings.

B. Edging: Fit shelves, doors, and exposed edges with specified edging. Do not use more than one piece for any single length.

C. Fitting: When necessary to cut and fit on site, provide materials with ample allowance for cutting. Provide matching trim for scribing and site cutting.

D. E. Matching Wood Grain: Comply with requirements of quality standard for specified Grade and as follows:

1. Provide center matched panels at each elevation.

2. Carry figure of cabinet fronts to toe kicks.

E. Provide cutouts for plumbing fixtures. Verify locations of cutouts from on-site dimensions.

Prime paint cut edges.

2.09 SHOP FINISHING

A. Sand work smooth and set exposed nails and screws.

B. For opaque finishes, apply wood filler in exposed nail and screw indentations and sand smooth.

C. On items to receive transparent finishes, use wood filler matching or blending with surrounding surfaces and of types recommended for applied finishes.

D. Finish work in accordance with AWI/AWMAC/WI (AWS), Section 5 - Finishing for grade specified and as follows:

1. Finish 1: Painted same color as wall and trim paint in room where installed, refer to AI001

Finish Schedule

a. Sheen: Satin.

2. Finish 2: Transparent Finish: for White Oak species Toielt cabinets.

a. System - 1, Lacquer, Nitrocellulose.

b. Sheen: Satin.

3.01 EXAMINATION

A. Verify adequacy of backing and support framing.

3.02 INSTALLATION

A. Set and secure custom cabinets in place, assuring that they are rigid, plumb, and level.

B. Use fixture attachments in concealed locations for wall mounted components.

C. Use concealed joint fasteners to align and secure adjoining cabinet units.

D. Secure cabinets to floor using appropriate angles and anchorages.

E. Countersink anchorage devices at exposed locations. Conceal with solid wood plugs of species to match surrounding wood; finish flush with surrounding surfaces.

3.03 ADJUSTING

A. Adjust installed work.

B. Adjust moving or operating parts to function smoothly and correctly.

3.04 CLEANING

A. Clean casework, counters, shelves, hardware, fittings, and fixtures.

3.05 CASEWORK SCHEDULES: SEE SHEET AI001 FOR MATERIAL REFERENCES AND

LOCATIONS

A. CBR- Casework Breakroom

1. Casework: Standard Carcass Construction

06 4100 - 5 ARCHITECTURAL WOOD

a. Cabinet Type: CAB-1

c. Finish: Finish 1

d. Thickness of doors: 3/4"

e. Door pulls: Door Pull and Drawer Pulls as specified above

2. Countertop:

a. Counter type: SS

b. Substrate: Plywood as noted in Section 06 2000

c. Sizes and pattern: as indicated on drawings.

3. Millwork:

a. Species of Trim/ Miscellaneous Millwork: match casework type

b. Thickness: 3/4" nominal unless noted otherwise.

c. Finish: match casework type

d. Sizes and pattern: as indicated on drawings.