This document is a Statement of Work (SOW) for a task order under the JPSS Flight Dynamics Analysis contract. The key details are:
The SOW extends the period of performance through the next task year and adds support for NOAA's NEON program, which is developing future low-Earth orbit environmental satellites. The work includes providing flight dynamics-based modeling, analyses, and technical support for the JPSS and NEON programs. Specific tasks include meeting and review support, ground station contact analysis, satellite lifetime projections, and analyses supporting satellite repositioning and NEON orbit/constellation optimization. The work is primarily performed at the contractor's facility, with some potential travel to customer sites. Reporting requirements include monthly status briefings and delivering documents to the GSFC NMDB online library.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Task: JPSS Flight Dynamics Analysis Task Order: 116 Task Modification: 5
I. Summary of Changes in this Task Modification
This task modification will extend the period of performance through the next task year.
Support for NOAA’s NEON program was added.
II. Summary of Work NOAA’s Near-Earth Orbit Network (NEON) Program will develop future low-Earth orbit (LEO) environmental satellites. Low and medium Earth observations are critical for weather forecasting, environmental observation, climate monitoring and public safety.
NEON sets the stage for NOAA to manage future polar and other low Earth and medium Earth orbit satellite observations as loosely coupled projects.
The Joint Polar Satellite System (JPSS) is the National Oceanic and Atmospheric Administration (NOAA) current operational low-Earth orbiting environmental observation program, which acquires and makes available global environmental data, primarily from multiple polar-orbiting satellites. The JPSS plays a critical role in NOAA’s continuing mission to understand and predict changes in weather, climate, oceans and coasts, which support the Nation’s economy and protect lives and property.
JPSS consists of a series of operational satellites – S-NPP, NOAA-20, and NOAA-21 (formerly JPSS-1 and JPSS-2), already in orbit, and JPSS-3 & -4 in development. All satellites fly in the same polar sun-synchronous mission orbit constellation. These satellites will share a common set of polar ground and space-based communications assets in order to downlink environmental data each orbit for subsequent data product generation and availability to the global user community. The next JPSS satellite launch is expected in 2027.
The JPSS and NEON Programs (Code 470) and Flight Project (Code 472) require flight dynamics-based modeling, analyses and technical support for conceptual mission analysis/design and mission requirement development/formulation.
III. Period of Performance The period of performance for this task will be from 11/01/2023 through 10/31/2024.
IV. Task Description This task order defines the tasks required to perform mission design analysis for mission concepts of operations in support of the JPSS program. This technical support effort is coordinated by the JPSS Program Systems Engineering (PSE) organization and is primarily in support of the JPSS Mission Orbit Analysis Working Group (MOAWG). An overview of the tasks are as follows:
Meeting & Review Support
This task provides support to various JPSS and NEON program and Flight Project reviews and working groups. The effort described includes consultation and expertise support in all areas of flight dynamics support including mission analysis, orbit determination, and launch vehicle support.
Specific reviews and working groups may include the following:
• Monthly technical meeting with the Task Monitor report assessing technical, staffing, and budget statuses
• Support the bi-weekly Mission Orbit Analysis Working Group (MOAWG) meetings
• Ground System TIMs and Working Groups – as needed
• Other mission TIMs and meetings - as needed
• Review Project Service Level Agreement (PSLA) and Network Requirements
Document (NRD)– as needed
• Review of ops products – as requested
• Mission Readiness Status Meetings
• Major mission review support (e.g., MOR)
Analysis Support
The following analysis items are anticipated for the next task year.
• Validate any information from the launch support entity identified in NEON mission contracts. The task will validate the information by making sure the desired orbit requirements have been met.
• Continue to provide ground station contact in views analysis and development of station loading models for JPSS and NEON managed and supported missions in the north and south hemisphere to support ground station utilization and loading studies.
Maintain current visibility models to ensure use of current station masks for Svalbard, Fairbanks, McMurdo and Troll stations. Develop and maintain constellation orbit models for SNPP, NOAA-20, NOAA-21, EUMETSAT Second Generation satellites, and notional NEON, Air Force, and DoD assets as necessary to generate the multi mission in view data to be used as inputs for both Flight Dynamics Support loading model development and validation of PSE loading analysis efforts.
• Provide any needed analysis of S-NPP and options for the post-JPSS-2 launch time period. This can include drift analysis of the MLTAN (Mean Local Time of the Ascending Node), a current fuel budget analysis, and de-orbit of S-NPP at its end of life.
• Provide analyses supporting the repositioning of satellites (S-NPP, NOAA-20, NOAA- 21, etc.) in the constellation.
• Provide lifetime projections for NOAA-20 & -21 as requested
• Provide analysis support of NEON, which includes QuickSounder. Analysis can include evaluation of various orbit/constellation analyses that also includes communication contacts. Orbit/constellation analyses could include optimizing the constellations for best coverage/contacts to analyzing individual maneuvers (from LV injection to ascent sequence/phasing sequence). These studies are new ventures being managed by JPSS PSE and are in the early phases of development. Details will be provided as they become available.
V. Deliverable Items and Schedules At a minimum, the contractor shall deliver the items specified below.
ACTIVITY COMPLETION
Task status briefing to Technical Monitor covering technical, staffing, and budget statuses
Monthly
NOAA-20/21 lifetime analysis As requested QuickSounder Orbit Insertion Analysis As requested JPSS-3/4 Orbit Insertion Analysis As requested
VI. Management Approach Staff Allocation, Expertise, and Skill Mix
The contractor shall staff this work item with the appropriate skill mix and staffing level for the work.
Configuration Management
Systems and documents will be covered under the JPSS Configuration Management Plan.
Facilities
Appropriate IT devices to support the analyses, specification development, and report development are required. It shall be the contractor’s responsibility to provide and set up local workstations and network connections at the contractor’s off-site facilities as required, and to install any required tools and utilities on the contractor’s equipment.
Risk Management and Best Practices
The contractor shall manage schedule, cost, and technical risk through monitoring and reporting of progress and performance metrics, identifying issues well in advance of negative consequences, recommending corrective action to the TM, and implementing corrective actions with the compliance of the TM.
VII. Government Furnished Facilities, Equipment, Software and Other Resources The Government will provide account and passwords to government-furnished workstations where existing versions of various relevant software packages shall be maintained. It shall be the contractor’s responsibility to complete any GSFC required security-related training courses.
VIII. Travel Travel may be required to support various major reviews and I&T activities that take place at customer facilities in Aurora, CO (Raytheon), Boulder, CO (Ball Aerospace) or Gilbert, AZ (Northrop Grumman). However, there is currently no anticipated travel for this task period. If necessary, a task mod will be submitted in the event that conditions change.
IX. Work Location This work shall be performed primarily at the contractor’s facility, but the contractor may be required to perform some work at the Goddard Space Flight Center and the NSOF.
X. Reporting Requirements The contractor shall report status in person or via teleconference to the TM or designated alternates on a monthly basis. Reports shall include informal presentation of interim results, status of testing activities, and action item status. The contractor shall provide all reports at least one day in advance of the monthly meeting via email, and maintain an email distribution list with the concurrence of the TM. The contractor shall also support the TM in the preparation of status reviews for internal and external funding agencies.
The contractor shall comply with any and all additional requests for status meetings and reports. The contractor shall deliver all documents in portable document format (PDF) electronic form to the GSFC NMDB online library, as directed by the TM.
XI. Security Requirements This task shall comply with JPSS IT security requirements. In lieu of specific security directions by JPSS in particular security areas (e.g. FDF interface security requirements), the FDF IT security plan shall be used.
XII. Rights
REQUIRED: The Contractor shall adhere to the FAR 52.227-17 RIGHTS IN DATA – Special Works (2007).