Solicitation Attachment XW - JB Charleston MACC Work Load Estimate.pdf

PDF 70 KB Posted

Attached to
JB Charleston Multiple Award Construction Contract
Solicitation number
FA441826R0009
Issued by

About this file

This document is a work load estimate for the JB Charleston Multiple Award Construction Contract (MACC), detailing 59 planned construction and repair projects scheduled across fiscal years 2027–2031.

The projects encompass a diverse range of military construction activities across two primary locations: JB CHS-AB (Air Base) and JB CHS-WS (Weapons Station). Projects include repairs and construction of dormitories, utility systems (water distribution, electrical substations, sewer systems), aircraft maintenance facilities, administrative buildings, housing units, and specialized military structures. Budget ranges vary significantly, from $250,000–$1 million for smaller projects to greater than $10 million for major undertakings such as dormitory repairs (B.464, B.466, B.473), waterfront substation repairs, water distribution system upgrades, and the central chiller plant renovation. The majority of projects fall within the $1 million–$5 million category. FY27 represents the highest concentration of work with 16 projects, while subsequent fiscal years show distributed workload. Notable large-scope projects include dormitory consolidations, infrastructure systems rehabilitation across multiple facilities, and facilities serving specialized functions such as naval pilot training centers (NNPTC) and tactical weapons cargo facilities (TWCF). This MACC structure allows for flexible task ordering and multiple award opportunities across a five-year planning horizon for construction services supporting military installation operations and modernization.

View the file

Other files

File Type Posted
Solicitation Amendment FA441826R00090003.pdf PDF
Solicitation Attachment - 1999 As-Built Drawings_20260918.pdf PDF
Attachment XT - JB Charleston Question and Answer Form (Completed).xlsx XLSX spreadsheet
Solicitation Amendment - FA441826R00090002.pdf PDF
Attachment YU - Seed Project Schedule B.pdf PDF
Solicitation Attachment - 1999 As-Built Drawings.pdf PDF
Solicitation Attachment - Salvage Storage List.docx DOCX document
Solicitation Attachment - Site Visit Sign-In Sheet.pdf PDF
B466 Photos.pdf PDF
Solicitation Attachment - Wage Determination NC20260012 - Wayne County.pdf PDF
Solicitation Attachment - Wage Determination SC20260022 - Berkeley County.pdf PDF
Solicitation Attachment - Hydrant Flow Test Data.pdf PDF
B464 Photos.pdf PDF
Solicitation Attachment - Wage Determination SC20260030 - Sumter County.pdf PDF
Solicitation Attachment - Wage Determination SC20260023 - Charleston County.pdf PDF
Solicitation Attachment - B466 Mechanical RFIs.pdf PDF
Solicitation Attachment - Geotechnical Report 14 April 2025.pdf PDF
Solicitation Attachment - Pre-Proposal Conference Slides 2026.pptx PPTX presentation
Solicitation Attachment YS Seed Project Specifications_Mark Up.pdf PDF
Solicitation Amendment FA441826R00090001.pdf PDF
Solicitation Attachment YT Seed Project Drawings.pdf PDF
Solicitation Attachment YS Seed Project Specifications.pdf PDF
Solicitation Attachment XY - On and Off-Ramp Procedures (1).pdf PDF
Solicitation Attachment XV - Past Performance Survey.pdf PDF
Solicitation Attachment XU - Past Performance Customer Questionnaire.pdf PDF
Statement of Work - Attachment 15 - 01 35 26 - Governmental Safety Requirements.docx DOCX document
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).pdf PDF
Statement of Work - Attachment 3 - 01 11 00 - Summary of Work.docx DOCX document
Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A_E).pdf PDF
Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.pdf PDF
Solicitation Attachment XT - JB Charleston - Question and Answer Form.xlsx XLSX spreadsheet
Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx DOCX document
Statement of Work - Attachment 14 - 01 35 26 - Attachment A Accident Investigation (CIRS).pdf PDF
Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures.docx DOCX document
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).pdf PDF
Statement of Work - Attachment 8 - 01 32 00 - Project Schedule.docx DOCX document
Statement of Work - Attachment 5 - 01 30 00 - Administrative Requirements.docx DOCX document
Statement of Work - Attachment 4 - 01 14 00 - Work Restrictions.docx DOCX document
Statement of Work - Attachment 2 - Architectural Compatibility Plan.pdf PDF
Statement of Work - JB CHS MACC.pdf PDF
Solicitation - FA441826R0009.pdf PDF
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 9 - 01 33 00 - Attachment A - JB CHS Transmittal Form 4025.pdf PDF
Statement of Work - Attachment 7 - 01 32 00 - Attachment A - Schedule-Pay Calendar Example 2.xlsx XLSX spreadsheet
Statement of Work - Attachment 6 - 01 32 00 - Attachment A - Schedule- Pay Calendar Example 1.pdf PDF
Solicitation Attachment XZ - Past Performance Project List.xlsx XLSX spreadsheet
Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.xlsx XLSX spreadsheet
Statement of Work - Attachment 17 - 01 78 00 - Closeout Requirements.docx DOCX document
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS RFI Form.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Index Project Title ROM FY (FY27-31) Location 1 Rpr Various Wet Well Lift Stations $1M - $5M FY27 JB CHS - WS 2 Construct Sanitary Sewer System - Short Stay $1M - $5M FY27 JB CHS - SS 3 TWCF - Repair Electric Switchboard/Transformer, Avionics Facility - B68 $250K - $1M FY27 JB CHS - AB 4 TWCF - Construct Cargo Pad Laydown Area - APS $1M - $5M FY27 JB CHS - AB 5 TWCF - Rpr Maintenance Dock, B.550 $1M - $5M FY27 JB CHS - AB 6 TWCF - Rpr Corrosion Control Facility - B.515 $1M - $5M FY27 JB CHS - AB 7 TWCF - Rpr Maintenance Facility, B.575 $1M - $5M FY27 JB CHS - AB 8 TWCF - Rpr Maintenance Facility, B.517 $1M - $5M FY27 JB CHS - AB 9 TWCF - Repair Mission Planning Cell/Special Ops Facility - B162 $5M - $10M FY27 JB CHS - AB

10 TWCF - Rpr Aerial Freight Terminal, B.178 $5M - $10M FY27 JB CHS - AB 11 Construct Natural Resources Vehicle Storage Facility $1M - $5M FY27 JB CHS - WS 12 Add/Alter Entry Control Point - Post 7 $1M - $5M FY27 JB CHS - WS 13 Construct Natural Resources & Wild Land Fire Center Facility $1M - $5M FY27 JB CHS - WS 14 Rpr Overhead Utility Systems - Area L $5M - $10M FY27 JB CHS - AB 15 Rpr Dormitory - B.464 > $10M FY27 JB CHS - AB 16 Demo/Consolidation - Repair Admin Facility B.346/Demolish Admin Facility B.246 > $10M FY27 JB CHS - AB 17 Repair NNPTC Training Facility, B.2400 (Phase 3) $1M - $5M FY28 JB CHS - WS 18 Construct Entomology Facility $1M - $5M FY28 JB CHS - AB 19 Rpr Mobile Mine Assembly Facility - B.274 $1M - $5M FY28 JB CHS - WS 20 Rpr Dormitory - B.466 $5M - $10M FY28 JB CHS - AB 21 Repair Waterfront Substation > $10M FY28 JB CHS - WS 22 Rpr Dormitory - B.473 > $10M FY28 JB CHS - AB 23 Rpr NNPTC Dormitory - B.2407 >$10M FY28 JB CHS - WS 24 Repair Elevated Water Storage Tanks - Tank 19 (Phase 1) $1M - $5M FY29 JB CHS - WS 25 Repair Breakers, Air Base Electrical Substation $1M - $5M FY29 JB CHS - AB 26 TWCF - Rpr Aircraft Maintenance Facility - B.536 $1M - $5M FY29 JB CHS - AB 27 Repair Dormitory, B.461 & Chiller Plant, B469 > $10M FY29 JB CHS - AB 28 Rpr Water Distribution System, South Annex > $10M FY29 JB CHS - WS 29 Rpr Dormitory - B.479 > $10M FY29 JB CHS - AB 30 Rpr Water Distribution System, FLETC & S. of B.324) > $10M FY29 JB CHS - WS 31 Rpr NNPTC Dormitory - B.2403 >$10M FY29 JB CHS - WS 32 Add/Alter Vehicle Maintenance Shop - B.688 $1M - $5M FY30 JB CHS - AB 33 Rpr Water Distribution System, Redbank/Ordnance (Phase 2) $1M - $5M FY30 JB CHS - WS 34 Repair Elevated Water Storage Tanks - Tank 406 (Phase 2) $1M - $5M FY30 JB CHS - WS 35 Rpr Voltage Regulator/Control House - Waterfront Substation $250K - $1M FY30 JB CHS - WS 36 TWCF - Install Restroom/Utilities, - B2190 $250K - $1M FY30 JB CHS - AB 37 TWCF - Construct Addition, Aircraft Maintenance Facility - B.536 $250K - $1M FY30 JB CHS - AB 38 TWCF - Rpr Exterior Enclosure, Aircraft Maintenance Facility - B570 $1M - $5M FY30 JB CHS - AB 39 Rpr Wharf Alpha $1M - $5M FY30 JB CHS - WS 40 Rpr Redbank Club - B.942 $1M - $5M FY30 JB CHS - WS 41 Rpr Base Commons, B.325 $1M - $5M FY30 JB CHS - AB 42 Rpr Sewer Mains - Weapons Station Housing $5M - $10M FY30 JB CHS - WS 43 Rpr Dorchester Entry Control $1M - $5M FY30 JB CHS - AB 44 Construct AT/FP Improvements - Post 1 $1M - $5M FY30 JB CHS - WS 45 Rpr Rivers Entry Control $5M - $10M FY30 JB CHS - AB 46 Rpr Unaccompanied Personnel Housing - B.1481, 1482, 1484, 1502, 1503, 1504 > $10M FY30 JB CHS - WS 47 Rpr Unaccompanied Personnel Housing - B.1476-1480, 1483 > $10M FY30 JB CHS - WS 48 Rpr Water Distribution System, Redbank/Ordnance (Phase 3) $1M - $5M FY31 JB CHS - WS 49 Repair Sewer Lift Station - LS 908 $250K - $1M FY31 JB CHS - WS 50 Rpr Community Commons (HVAC) - B325, P1 $1M - $5M FY31 JB CHS - AB 51 Rpr Stormwater System, Northside - AFSBn $1M - $5M FY31 JB CHS - WS 52 Repair Naval Exchange - B.706 $1M - $5M FY31 JB CHS - WS 53 Rpr Vehicle Maintenance Facility - B459 $1M - $5M FY31 JB CHS - WS 54 TWCF - Install Crane/Ceiling Fans, Aircraft Maintenance Hangar - B700 $250K - $1M FY31 JB CHS - AB 55 Add/Alter Hill Blvd $1M - $5M FY31 JB CHS - AB 56 Rpr Unaccompanied Personnel Housing - B.468-470 $5M - $10M FY31 JB CHS - WS 57 Rpr Central Chiller Plant - B2409 > $10M FY31 JB CHS - WS 58 Rpr NNPTC Dormitory - B.2405 > $10M FY31 JB CHS - WS 59 Rpr NNPTC Dormitory - B.2408 > $10M FY31 JB CHS - WS

JB Charleston Multiple Award Construction Contract (MACC) Work Load Estimate

File details come from the government source that posted it. Updated .