This is a Fire Hydrant Flow Test report documenting water system performance for Building 464 repair project conducted by ADC Engineering. The test was performed on two fire hydrants connected to 6-inch diameter water mains to assess static pressure, residual pressure, and flow capacity for fire suppression system design purposes.

Test No. 1 yielded complete results showing a static pressure of 62 psi and residual pressure of 53 psi. Flow Hydrant No. 1 delivered 950 gpm total flow (475 gpm from each of two nozzles at 8 psi differential), while Flow Hydrant No. 2 produced 0 gpm, indicating insufficient pressure or supply at that location. The calculated Q20 flow rate (flow at 20 psi residual pressure) was 2,182 gpm. Test No. 2 was not completed, showing zero values across all parameters. Testing equipment consisted of a HydrantPro Diffuser with flared barrel (HYDPRO160 from Pollard Water) featuring a 2.50-inch outlet diameter and 0.90 discharge coefficient. Personnel performing and witnessing the test included Greg Jones and Hanna McKool of ADC Engineering and ADC, respectively. Site plans on pages 2-3 identify the specific locations of the residual hydrant and flow hydrant relative to Building 464 and the campus water distribution network.

View the file

Other files

File Type Posted
Solicitation Amendment FA441826R00090003.pdf PDF
Solicitation Attachment - 1999 As-Built Drawings_20260918.pdf PDF
Solicitation Amendment - FA441826R00090002.pdf PDF
Attachment YU - Seed Project Schedule B.pdf PDF
Solicitation Attachment - 1999 As-Built Drawings.pdf PDF
Solicitation Attachment - Salvage Storage List.docx DOCX document
Solicitation Attachment - Site Visit Sign-In Sheet.pdf PDF
Attachment XT - JB Charleston Question and Answer Form (Completed).xlsx XLSX spreadsheet
B464 Photos.pdf PDF
Solicitation Attachment - Wage Determination SC20260030 - Sumter County.pdf PDF
Solicitation Attachment - Wage Determination SC20260023 - Charleston County.pdf PDF
Solicitation Attachment - B466 Mechanical RFIs.pdf PDF
Solicitation Attachment - Geotechnical Report 14 April 2025.pdf PDF
Solicitation Attachment - Pre-Proposal Conference Slides 2026.pptx PPTX presentation
Solicitation Attachment YS Seed Project Specifications_Mark Up.pdf PDF
B466 Photos.pdf PDF
Solicitation Attachment - Wage Determination NC20260012 - Wayne County.pdf PDF
Solicitation Attachment - Wage Determination SC20260022 - Berkeley County.pdf PDF
Solicitation Amendment FA441826R00090001.pdf PDF
Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.pdf PDF
Solicitation Attachment XT - JB Charleston - Question and Answer Form.xlsx XLSX spreadsheet
Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx DOCX document
Statement of Work - Attachment 14 - 01 35 26 - Attachment A Accident Investigation (CIRS).pdf PDF
Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures.docx DOCX document
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).pdf PDF
Statement of Work - Attachment 8 - 01 32 00 - Project Schedule.docx DOCX document
Statement of Work - Attachment 5 - 01 30 00 - Administrative Requirements.docx DOCX document
Statement of Work - Attachment 4 - 01 14 00 - Work Restrictions.docx DOCX document
Statement of Work - Attachment 2 - Architectural Compatibility Plan.pdf PDF
Statement of Work - JB CHS MACC.pdf PDF
Solicitation Attachment YT Seed Project Drawings.pdf PDF
Solicitation Attachment YS Seed Project Specifications.pdf PDF
Solicitation Attachment XY - On and Off-Ramp Procedures (1).pdf PDF
Solicitation Attachment XV - Past Performance Survey.pdf PDF
Solicitation Attachment XU - Past Performance Customer Questionnaire.pdf PDF
Statement of Work - Attachment 15 - 01 35 26 - Governmental Safety Requirements.docx DOCX document
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).pdf PDF
Statement of Work - Attachment 3 - 01 11 00 - Summary of Work.docx DOCX document
Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A_E).pdf PDF
Solicitation Attachment XZ - Past Performance Project List.xlsx XLSX spreadsheet
Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.xlsx XLSX spreadsheet
Statement of Work - Attachment 17 - 01 78 00 - Closeout Requirements.docx DOCX document
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS RFI Form.pdf PDF
Solicitation - FA441826R0009.pdf PDF
Solicitation Attachment XW - JB Charleston MACC Work Load Estimate.pdf PDF
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 9 - 01 33 00 - Attachment A - JB CHS Transmittal Form 4025.pdf PDF
Statement of Work - Attachment 7 - 01 32 00 - Attachment A - Schedule-Pay Calendar Example 2.xlsx XLSX spreadsheet
Statement of Work - Attachment 6 - 01 32 00 - Attachment A - Schedule- Pay Calendar Example 1.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE HYDRANT FLOW TEST

LOGO Project Name:

ADC Project No:

Test Static & Residual Hydrant Flow Hydrant No. 1 Flow Hydrant No. 2 Results

Test No. Location Location Location 1 Static Pressure 62 psi

Date Number Number Number Residual Pressure 53 psi

Static 62 psi Nozzel 1 8 psi 475 gpm Nozzel 1 psi 0 gpm Total Test Flow Rate 950 gpm

Time Residual 53 psi Nozzel 2 8 psi 475 gpm Nozzel 2 psi 0 gpm Q20 Flow Rate 2182 gpm

Total Hyd. No. 1 Flow 950 gpm Total Hyd. No. 2 Flow 0 gpm

Main Size 6 inch Main Size 6 inch Main Size inch

Notes: Pump information, tank information, nearby large user status

Test No. Location Location Location Static Pressure 0 psi

Date Number Number Number Residual Pressure 0 psi

Static psi Nozzel 1 psi 0 gpm Nozzel 1 psi 0 gpm Total Test Flow Rate 0 gpm

Time Residual psi Nozzel 2 psi 0 gpm Nozzel 2 psi 0 gpm Q20 Flow Rate gpm

Total Hyd. No. 1 Flow 0 gpm Total Hyd. No. 2 Flow 0 gpm

Main Size inch Main Size inch Main Size inch

Notes: Pump information, tank information, nearby large user status

Personnel:

Test performed by of and of

Test witnessed by of and of

Equipment:

Flow diffuser HydrantPro Diffuser with flared barrel (HYDPRO160 from Pollard Water) Outlet dia 2.50 inch The "Test Flow" calculations use these values which were provided by the Manufacturer. Discharge Coefficient 0.90

N:\PROJECTS 2024\24001 (CS)-JBC Dormitory B464\24001 (4) DESIGN\24001 (4.3) HFT\[ADC Hydrant Flow Test.B464.2025 0219.xlsx]Sheet1

Repair Building 464

Greg Jones ADCADC Engineering Hanna McKool gregj Highlight gregj Highlight gregj PolyLine gregj PolyLine gregj Callout Residual Hydrant gregj Callout Flow Hydrant gregj Text Box B464

Highlight gregj Highlight gregj Highlight gregj PolyLine

PolyLine

File details come from the government source that posted it. Updated .