Solicitation Attachment XZ - Past Performance Project List.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- FA441826R0009
About this file
This file is a Past Performance Project List template attachment for the JB Charleston Multiple Award Construction Contract (MACC) solicitation. The template is designed to collect historical project information from offerors bidding on this Air Force contract opportunity. The document provides a structured format with 15 reference rows for contractors to list past construction projects, including required data fields such as project title, contract type (Design Build or Design Bid Build), type of work performed (existing facility whole building renovation, utility infrastructure, or other), period of performance in calendar days, start and completion dates, total contract value, and project location by state.
This attachment serves as an evaluation tool for assessing contractor past performance capabilities relevant to the MACC requirements. The solicitation itself is issued as a competitive HUBZone and Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside supporting the Department of the Air Force Air Mobility Command construction program at Joint Base Charleston and associated Air Force locations. The MACC is designed to support multiple simultaneous projects including new construction, alterations/repairs, demolition, design-build services, roads, grounds, and utilities work across Joint Base Charleston's multiple installations in South Carolina and supporting work at Seymour Johnson AFB and Shaw AFB for emergency use.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment XZ - Past Projects
| JB Charleston Multiple Award Construction Contract (MACC) | ||
| Past Performance Project List | ||
| Reference No. | Project Title | Type of Contract |
(DB: Design Build,
| DBB: Design Bid Build) | Preponderance of Work | ||
| (Existing Facility Whole Bldg Renovation, Utility Infrastructure, Other) | Period of Performance (Calendar Days) | Start Date | |
| (DD MMM YY) | Completion Date (DD MMM YY) | Contract Value ($) | Location (State) |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| 12 | |||
| 13 | |||
| 14 | |||
| 15 |
File details come from the government source that posted it. Updated .