E007 Engineering and Configuration Control Documentation (Change).pdf

PDF 132 KB Posted

Attached to
Call for Solutions - Low Altitude Stalking and Striking Ordnance (LASSO) Rapid Prototyping
Solicitation number
SOLDIER_25-01
Issued by

About this file

This document is an Army Data Requirements List (ADRL) for the Engineering and Configuration Control Document (ECCD) related to the LASSO (Low Altitude Stalking and Striking Ordnance) program. The ECCD manages and tracks changes to LASSO deliverables, processes, and documentation, ensuring consistency throughout its lifecycle. Key aspects include document control, version control, change management, approval processes, communication, centralized repository, and access control.

The document specifies detailed submission requirements for configuration changes, including Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Requests for Variance (RFV). The contractor must electronically submit these documents to the IPPT for concurrence, including a tolerance analysis as backup data. The government will have 15 business days to review and provide comments or approval, and the contractor must resubmit updated versions within 10 business days if comments are received. Documents must be compatible with Windows and Microsoft Office 2016 products, and contain a Distribution Statement D, limiting distribution to Department of Defense and U.S. DoD Vendors only.

View the file

Other files

File Type Posted
Q004 FIAR (Change).pdf PDF
L001 PPL (Change).pdf PDF
Q001 Test Plan (Change).pdf PDF
E010 Frequency Allocation Application and Certification Support (Change).pdf PDF
E003 SAR (Change).pdf PDF
E008 Accident Incident Report Accident Incident Report Field Incident Report (Change).pdf PDF
P003 Agenda Brief Meeting Minutes Action Items (Change).pdf PDF
E002 SDD (Change).pdf PDF
L007 QRC Operator Manual (Change).pdf PDF
E011 Unified Data Reference Architecture (Change).pdf PDF
E005 Source Control Drawings (Change).pdf PDF
AMENDMENT 2 Letter of Explanation (Final).docx DOCX document
L006 Training Materials and IKPT (Change).pdf PDF
E001 Open Systems Management Plan (Change).pdf PDF
E009 SEMP (Change).pdf PDF
E006 CMP (Change).pdf PDF
E004 Product Drawings Models and Associated Lists (Change).pdf PDF
B08 LASSO - Company Response Template V2.0_22MAY2025 (renamed).xlsx XLSX spreadsheet
B08 LASSO - Pricing Sheet V2.0_21MAY2025.xlsx XLSX spreadsheet
B08 LASSO Call for Solutions V2.1_Clean.docx DOCX document
LASSO - Call for Solutions.pdf PDF
LASSO - Vendor Response Template V1.0_15MAY2025.xlsx XLSX spreadsheet
LASSO - ADRLs_Full Binder.pdf PDF
LASSO - Pricing Sheet V1.0_15MAY2025.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADRL Number: E007

System/Item

LASSO

OTA No:

TBD

Vendor:

TBD

Title

Engineering and Configuration Control Document

Data Item Description (DID) No:

DI-SESS-80639E, DI-SESS-80642D, DI-

SESS-80643E, DI-SESS-80640E

SOO Reference:

5.1.2., 5.1.3.

DD 250 Req

No

Distribution Statement

Required

D

Date of First

Submission

See Remarks

Date of Subsequent

Submission

See Remarks

Remarks:

For all requested configuration changes, the contractor shall prepare and electronically submit

Engineering Change Proposals (ECPs) in accordance with DI-SESS-80639E (along with its supporting Configuration Management forms:

Notice of Revision (NOR) (DI-SESS-80642D) and Specification Change Notice (SCN) (DI-

SESS-80643E)), Value Engineering Change

Proposals (VECPs) and Requests for Variance

(RFV) (DI-SESS-80640E) to the IPPT for concurrence. The contractor shall include a tolerance analysis as backup data for all configuration control document submittals.

(Class I only). The Government has 15 business days to provide either review comments, or document disapproval, or document approval after receipt.

If Government review comments are provided, or the document is disapproved, the contractor shall resubmit updated versions no later than 10 business days after receipt of Government's comments.

Class II ECPs are for information only.

ECP's & VECP's - Submit NLT 5 business days after preparation.

Distribution

Addressee

Copies

Draft Final

Hard copy

Soft copy

Hard copy

Soft copy

SFAE-SDR-SWAR-SPTD 1 1

Total

Title Engineering and Configuration Control Document

Data Item Description (DID) Number

DI-SESS-80639E, DI-SESS-80642D,

DI-SESS-80643E, DI-SESS-80640E

Description

Engineering and Configuration Control Document (ECCD) manages and tracks changes to LASSO deliverables, processes, and documentation, ensuring consistency and stability throughout its lifecycle. Key aspects of an

ECCD is Document Control, Version Control, Change Management, Approval Processes, Communication, Centralized Repository and Access Control.

Preparation Instructions

Format:

Vendor format acceptable. Documents shall be compatible with Windows and Microsoft Office 2016 products

(i.e., Word, Excel, PowerPoint, etc.) MS Project Professional 2019 and MS 365 formatted files.

Export Control Act Warning (Required Warning):

This document may contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Security Markings:

Shall contain DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S.

DoD Vendors only. Date of determination is date product is generated. Other requests for this document shall be referred to the attention of the Product Manager Soldier Precision Targeting Devices, SFAE-SDR-IVAS-SPTD, 5966 12th Street, Bldg. 1024, Fort Belvoir, VA 22060-5512.