This document is a Data Item Description (DID) for a Safety Assessment Report (SAR) related to the LASSO (Low Altitude Stalking and Striking Ordnance) system. The SAR is a detailed document that evaluates safety risks prior to testing or operation, documenting potential hazards and required controls. The report must be submitted 2 months before the Test Readiness Review (TRR) and 30 days before any test requiring the SAR, with the government having 15 business days to review and respond.
The SAR must be prepared in a vendor-approved format compatible with Microsoft Office 2016 and include specific sections such as introduction, system description, purpose, development summary, component details, system operations, safety engineering, hazard conditions, and recommendations. The document is subject to export control restrictions and must contain Distribution Statement D, limiting distribution to the Department of Defense and U.S. DoD Vendors. If toxic or hazardous materials are used, the vendor must also provide technical information for a Hazardous Waste Profile Sheet.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADRL Number: E003
System/Item
LASSO
OTA No:
TBD
Vendor:
TBD
Title
Safety Assessment Report (SAR)
Data Item Description (DID) No:
DI-SAFT-80102C
SOO Reference:
1.3.1.3.3.1
DD 250 Req
No
Distribution Statement
Required
D
Date of First
Submission
See Remarks
Date of Subsequent
Submission
See Remarks
Remarks:
The SAR shall be submitted 2 months prior to
TRR, and 30 days before test requiring the SAR.
The Government has 15 business days to provide either review comments, or document disapproval, or document approval after receipt.
If Government review comments are provided, or the document is disapproved, the contractor shall resubmit updated versions no later than 10 business days after receipt of Government's comments.
The Vendor shall provide updates to the SAR for all configuration changes that occur during initial qualification of the LASSO.
Distribution
Addressee
Copies
Draft Final
Hard copy
Soft copy
Hard copy
Soft copy
SFAE-SDR-SWAR-SPTD 1 1
Total 1 1
Title
Safety Assessment Report (SAR)
Data Item Description (DID) Number
DI-SAFT-80102C
Description
The SAR evaluates the safety risks being assumed prior to test or operation of the system and provides specific controls or precautions to be followed. The SAR documents the safety risk being assumed during operation. The
SAR identifies all safety features of the system, specific controls, or precautions to be followed during use, and provides verification of compliance to safety requirements identified in this specification.
Preparation Instructions
Format:
Vendor format acceptable. Documents shall be compatible with Windows and Microsoft Office 2016 products
(i.e., Word, Excel, PowerPoint, etc.) MS Project Professional 2019 and MS 365 formatted files.
Export Control Act Warning (Required Warning):
This document may contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Security Markings:
Shall contain DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S.
DoD Vendors only. Date of determination is date product is generated. Other requests for this document shall be referred to the attention of the Product Manager Soldier Precision Targeting Devices, SFAE-SDR-IVAS-SPTD, 5966 12th Street, Bldg. 1024, Fort Belvoir, VA 22060-5512.
Content:
• The SAR shall evaluate the safety risks being assumed prior to test or operation of the system and provide specific controls or precautions to be followed
• The SAR shall document the safety risk being assumed during operation
• The SAR shall identify:
o All safety features of the system o Specific controls or precautions to be followed during use
• The SAR shall provide verification of compliance to safety requirements identified in this SOW
• If toxic/hazardous materials are utilized, the Vendor shall provide the technical information required to complete Part II of the DRMS Form 1930, Hazardous Waste Profile Sheet
The SAR shall include:
• Introduction.
• System description.
• Purpose and intended use of system.
• Summary of system development.
• Description of system and components.
• System operations.
• System safety engineering.
• Hazard Conditions
• Conclusions and recommendations.