About this file

This document is a Data Item Description (DID) for a Safety Assessment Report (SAR) related to the LASSO (Low Altitude Stalking and Striking Ordnance) system. The SAR is a detailed document that evaluates safety risks prior to testing or operation, documenting potential hazards and required controls. The report must be submitted 2 months before the Test Readiness Review (TRR) and 30 days before any test requiring the SAR, with the government having 15 business days to review and respond.

The SAR must be prepared in a vendor-approved format compatible with Microsoft Office 2016 and include specific sections such as introduction, system description, purpose, development summary, component details, system operations, safety engineering, hazard conditions, and recommendations. The document is subject to export control restrictions and must contain Distribution Statement D, limiting distribution to the Department of Defense and U.S. DoD Vendors. If toxic or hazardous materials are used, the vendor must also provide technical information for a Hazardous Waste Profile Sheet.

View the file

Other files

File Type Posted
Q004 FIAR (Change).pdf PDF
L001 PPL (Change).pdf PDF
Q001 Test Plan (Change).pdf PDF
E010 Frequency Allocation Application and Certification Support (Change).pdf PDF
E008 Accident Incident Report Accident Incident Report Field Incident Report (Change).pdf PDF
P003 Agenda Brief Meeting Minutes Action Items (Change).pdf PDF
E002 SDD (Change).pdf PDF
L007 QRC Operator Manual (Change).pdf PDF
E011 Unified Data Reference Architecture (Change).pdf PDF
E005 Source Control Drawings (Change).pdf PDF
AMENDMENT 2 Letter of Explanation (Final).docx DOCX document
E007 Engineering and Configuration Control Documentation (Change).pdf PDF
L006 Training Materials and IKPT (Change).pdf PDF
E001 Open Systems Management Plan (Change).pdf PDF
E009 SEMP (Change).pdf PDF
E006 CMP (Change).pdf PDF
E004 Product Drawings Models and Associated Lists (Change).pdf PDF
B08 LASSO - Company Response Template V2.0_22MAY2025 (renamed).xlsx XLSX spreadsheet
B08 LASSO - Pricing Sheet V2.0_21MAY2025.xlsx XLSX spreadsheet
B08 LASSO Call for Solutions V2.1_Clean.docx DOCX document
LASSO - Call for Solutions.pdf PDF
LASSO - Vendor Response Template V1.0_15MAY2025.xlsx XLSX spreadsheet
LASSO - ADRLs_Full Binder.pdf PDF
LASSO - Pricing Sheet V1.0_15MAY2025.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADRL Number: E003

System/Item

LASSO

OTA No:

TBD

Vendor:

TBD

Title

Safety Assessment Report (SAR)

Data Item Description (DID) No:

DI-SAFT-80102C

SOO Reference:

1.3.1.3.3.1

DD 250 Req

No

Distribution Statement

Required

D

Date of First

Submission

See Remarks

Date of Subsequent

Submission

See Remarks

Remarks:

The SAR shall be submitted 2 months prior to

TRR, and 30 days before test requiring the SAR.

The Government has 15 business days to provide either review comments, or document disapproval, or document approval after receipt.

If Government review comments are provided, or the document is disapproved, the contractor shall resubmit updated versions no later than 10 business days after receipt of Government's comments.

The Vendor shall provide updates to the SAR for all configuration changes that occur during initial qualification of the LASSO.

Distribution

Addressee

Copies

Draft Final

Hard copy

Soft copy

Hard copy

Soft copy

SFAE-SDR-SWAR-SPTD 1 1

Total 1 1

Title

Safety Assessment Report (SAR)

Data Item Description (DID) Number

DI-SAFT-80102C

Description

The SAR evaluates the safety risks being assumed prior to test or operation of the system and provides specific controls or precautions to be followed. The SAR documents the safety risk being assumed during operation. The

SAR identifies all safety features of the system, specific controls, or precautions to be followed during use, and provides verification of compliance to safety requirements identified in this specification.

Preparation Instructions

Format:

Vendor format acceptable. Documents shall be compatible with Windows and Microsoft Office 2016 products

(i.e., Word, Excel, PowerPoint, etc.) MS Project Professional 2019 and MS 365 formatted files.

Export Control Act Warning (Required Warning):

This document may contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Security Markings:

Shall contain DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S.

DoD Vendors only. Date of determination is date product is generated. Other requests for this document shall be referred to the attention of the Product Manager Soldier Precision Targeting Devices, SFAE-SDR-IVAS-SPTD, 5966 12th Street, Bldg. 1024, Fort Belvoir, VA 22060-5512.

Content:

• The SAR shall evaluate the safety risks being assumed prior to test or operation of the system and provide specific controls or precautions to be followed

• The SAR shall document the safety risk being assumed during operation

• The SAR shall identify:

o All safety features of the system o Specific controls or precautions to be followed during use

• The SAR shall provide verification of compliance to safety requirements identified in this SOW

• If toxic/hazardous materials are utilized, the Vendor shall provide the technical information required to complete Part II of the DRMS Form 1930, Hazardous Waste Profile Sheet

The SAR shall include:

• Introduction.

• System description.

• Purpose and intended use of system.

• Summary of system development.

• Description of system and components.

• System operations.

• System safety engineering.

• Hazard Conditions

• Conclusions and recommendations.

File details come from the government source that posted it. Updated .