About this file

This document is a Configuration Management Plan (CMP) Data Item Description (DID) for the LASSO (Low Altitude Stalking and Striking Ordnance) program, with Data Item Description Numbers DI-SESS-80858D and DI-SESS-81253. The CMP provides detailed guidelines for the vendor's configuration management methods and procedures for maintaining the system's hardware and software configuration throughout the contract.

Key requirements include submitting a draft CMP at Milestone 2 and a final version by Milestone 3, with the government having 15 business days to review and provide comments. The vendor must use a compatible format (Windows and Microsoft Office 2016 products) and follow guidance from DI-SESS-80858D and MIL-HDBK-61. The plan must address configuration management program elements such as system configuration identification, control, engineering change processes, and status accounting. The document includes an export control warning and requires DISTRIBUTION STATEMENT D, limiting distribution to Department of Defense and U.S. DoD vendors.

View the file

Other files

File Type Posted
Q004 FIAR (Change).pdf PDF
L001 PPL (Change).pdf PDF
Q001 Test Plan (Change).pdf PDF
E010 Frequency Allocation Application and Certification Support (Change).pdf PDF
E003 SAR (Change).pdf PDF
E008 Accident Incident Report Accident Incident Report Field Incident Report (Change).pdf PDF
P003 Agenda Brief Meeting Minutes Action Items (Change).pdf PDF
E002 SDD (Change).pdf PDF
L007 QRC Operator Manual (Change).pdf PDF
E011 Unified Data Reference Architecture (Change).pdf PDF
E005 Source Control Drawings (Change).pdf PDF
AMENDMENT 2 Letter of Explanation (Final).docx DOCX document
E007 Engineering and Configuration Control Documentation (Change).pdf PDF
L006 Training Materials and IKPT (Change).pdf PDF
E001 Open Systems Management Plan (Change).pdf PDF
E009 SEMP (Change).pdf PDF
E004 Product Drawings Models and Associated Lists (Change).pdf PDF
B08 LASSO - Company Response Template V2.0_22MAY2025 (renamed).xlsx XLSX spreadsheet
B08 LASSO - Pricing Sheet V2.0_21MAY2025.xlsx XLSX spreadsheet
B08 LASSO Call for Solutions V2.1_Clean.docx DOCX document
LASSO - Call for Solutions.pdf PDF
LASSO - Vendor Response Template V1.0_15MAY2025.xlsx XLSX spreadsheet
LASSO - ADRLs_Full Binder.pdf PDF
LASSO - Pricing Sheet V1.0_15MAY2025.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADRL Number: E 0 0 6

System/Item

LASSO

OTA No:

TBD

Vendor:

TBD

Title Configuration Management Plan (CMP)

Data Item Description (DID) No:

DI-SESS-80858D and DI-SESS-81253

SOO Reference:

Milestone 2, Milestone 3, 5.1.2.,5.1.3, and 5.1.4.

DD 250 Req

No

Distribution Statement

Required D

Date of First

Submission

See Remarks

Date of Subsequent

Submission See Remarks

Remarks:

The Draft CMP shall be delivered at Milestone 2 and Final, No Later Milestone 3.

The Government has 15 business days to provide either review comments, or document disapproval, or document approval after receipt.

If Government review comments are provided, or the document is disapproved, the Vendor shall resubmit updated version no later that 10 business days after receipt of Government’s comments.

Distribution

Addressee

Copies

Draft Final

Hard copy

Soft copy

Hard copy

Soft copy

SFAE-SDR-SWAR-SPTD 1 1

Total

Title

Configuration Management Plan (CMP)

Data Item Description (DID) Number

DI-SESS-80858D and DI-SESS-81253

Description

The Configuration Management Plan provides a detailed plan of the Configuration Management methods and procedures that the Vendor will be used to maintain the configuration of the system(s) procured under this contract. The CMP describes in detail how the Vendor’s Configuration Management (CM) program is implemented for the effort; how CM is organized; how CM will be conducted; methods, procedures and controls that effect configuration identification, identification, change control, status accounting and audits of the total configuration, including hardware and software. The principal use is to provide the Army with a basis for review, evaluation and monitoring of the Vendor CM program, and its proposed components.

Preparation Instructions

Format:

Vendor format acceptable. Documents shall be compatible with Windows and Microsoft Office 2016 products (i.e., Word, Excel, PowerPoint, etc.) MS Project Professional 2019 and MS 365 formatted files.

The Vendor shall use, as guidance, DI-SESS-80858D “Supplier’s Configuration Management Plan” and MIL-HDBK- 61 “Configuration Management Guidance” in the preparation of the CMP.

Export Control Act Warning (Required Warning):

This document may contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Security Markings:

Shall contain DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD Vendors only. Date of determination is date product is generated. Other requests for this document shall be referred to the attention of the Product Manager Soldier Precision Targeting Devices, SFAE-SDR-IVAS-SPTD, 5966 12th Street, Bldg. 1024, Fort Belvoir, VA 22060-5512.

Content The content of the CMP shall define the technical and administrative guidelines for change control, status accounting, and audits of the hardware and software configuration of the system(s). Also included shall be the implementation of the use of firmware, relative to Vendor test stations. The Vendor shall submit electronic engineering change control documents for DD1692 Engineering Change Proposal, DD1695 Notice of Revision, and

DD1696 Specification Change Notice.

The plan shall address, but not be limited to:

• Vendor Configuration Management Program

• System Configuration Identification

• System Configuration Control

• System Engineering Change Order (ECO – internal to Vendor) and Engineering Change Process (ECP)

Preparation and Processing

• System Configuration Status Accounting

File details come from the government source that posted it. Updated .