E001 Open Systems Management Plan (Change).pdf

PDF 148 KB Posted

Attached to
Call for Solutions - Low Altitude Stalking and Striking Ordnance (LASSO) Rapid Prototyping
Solicitation number
SOLDIER_25-01
Issued by

About this file

This document is a Data Item Description (DID) for an Open Systems Management Plan (OSMP) with the DID number DI-MGMT-82099, associated with the LASSO (Low Altitude Stalking and Striking Ordnance) system. The OSMP describes the developer's Modular Open Systems Approach (MOSA) implementation, including plans for a modular, open architecture that covers open standards, data models, tools, configuration item management, design documentation, technology insertion, and life cycle sustainability.

The document outlines specific submission requirements, including that the draft OSMP is due at PAAC (Milestone 1) with updates to support System Requirements Review (SRR), Preliminary Design Review (PDR), and Critical Design Review (CDR) milestones. The vendor must submit the OSMP in a format compatible with Windows and Microsoft Office 2016 products, and it must contain Distribution Statement D, limiting distribution to Department of Defense and U.S. DoD Vendors. The government will have 15 business days to review the document and provide comments, with the contractor required to resubmit updated versions within 10 business days if comments or disapproval are received.

View the file

Other files

File Type Posted
Q004 FIAR (Change).pdf PDF
L001 PPL (Change).pdf PDF
Q001 Test Plan (Change).pdf PDF
E010 Frequency Allocation Application and Certification Support (Change).pdf PDF
E003 SAR (Change).pdf PDF
E008 Accident Incident Report Accident Incident Report Field Incident Report (Change).pdf PDF
P003 Agenda Brief Meeting Minutes Action Items (Change).pdf PDF
E002 SDD (Change).pdf PDF
L007 QRC Operator Manual (Change).pdf PDF
E011 Unified Data Reference Architecture (Change).pdf PDF
E005 Source Control Drawings (Change).pdf PDF
AMENDMENT 2 Letter of Explanation (Final).docx DOCX document
E007 Engineering and Configuration Control Documentation (Change).pdf PDF
L006 Training Materials and IKPT (Change).pdf PDF
E009 SEMP (Change).pdf PDF
E006 CMP (Change).pdf PDF
E004 Product Drawings Models and Associated Lists (Change).pdf PDF
B08 LASSO - Company Response Template V2.0_22MAY2025 (renamed).xlsx XLSX spreadsheet
B08 LASSO - Pricing Sheet V2.0_21MAY2025.xlsx XLSX spreadsheet
B08 LASSO Call for Solutions V2.1_Clean.docx DOCX document
LASSO - Call for Solutions.pdf PDF
LASSO - Vendor Response Template V1.0_15MAY2025.xlsx XLSX spreadsheet
LASSO - ADRLs_Full Binder.pdf PDF
LASSO - Pricing Sheet V1.0_15MAY2025.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADRL Number: E001

System/Item

LASSO

OTA No:

TBD

Vendor:

TBD

Title

Open Systems Management Plan (OSMP)

Data Item Description (DID) No

DI-MGMT-82099

SOO Reference:

31.3.3, Milestone 1, Milestone 2 and Milestone 3

DD 250 Req

No

Distribution Statement

Required

D

Date of First

Submission

See Remarks

Date of Subsequent

Submission

See Remarks

Remarks:

Draft is due at PAAC (Milestone 1) with updates provided to support SRR, PDR, and

CDRMilestones 2 and 3 Technical Reviews.

Additional updates shall be addressed in the

MOSA / MBSE Implementation Plan.

The Vendor shall submit the OSMP in support of the Technical Reviews process identified in the

SOW OReferences above.

The Government has 15 business days to provide either review comments, or document disapproval, or document approval after receipt.

If Government review comments are provided, or the document is disapproved, the contractor shall resubmit updated versions no later than 10 business days after receipt of Government's comments.

Distribution

Addressee

Copies

Draft Final

Hard copy

Soft copy

Hard copy

Soft copy

SFAE-SDR-SWAR-

SPTD

1 1

Total 1 1

Title

Open Systems Management Plan (OSMP)

Data Item Description (DID) Number

DI-MGMT-82099

Description

An Open Systems Management Plan (OSMP) describes the developer’s Modular Open Systems Approach

(MOSA) to implement an OSA. The OSMP includes a developer’s plans for a modular, open architecture, to include: use of open standards, data models, and tools; design and management of, and dependencies between, Configuration Items (CIs); design information documentation; technology insertion; life cycle sustainability;

treatment of proprietary or vendor-unique elements; and reuse of existing items. The OSMP includes a support plan addressing the five (5) Principles of MOSA: 1. Establish Enabling Environment, 2. Employ Modular

Design, 3. Designate Key Interfaces, 4. Use Open Standards, and 5. Certify Conformance. The OSMP provides visibility into the developers’ MOSA and implementation.

Preparation Instructions

Format:

Vendor format acceptable. Documents shall be compatible with Windows and Microsoft Office 2016 products

(i.e., Word, Excel, PowerPoint, etc.) MS Project Professional 2019 and MS 365 formatted files.

Export Control Act Warning (Required Warning):

This document may contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Security Markings:

Shall contain DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S.

DoD Vendors only. Date of determination is date product is generated. Other requests for this document shall be referred to the attention of the Product Manager Soldier Precision Targeting Devices, SFAE-SDR-IVAS-SPTD, 5966 12th Street, Bldg. 1024, Fort Belvoir, VA 22060-5512.

File details come from the government source that posted it. Updated .